AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 35 of 46  ELOG logo
ID Date Author Subjectup Text Attachments
  821   Thu May 30 03:13:04 2019 TDThursday 30 May
11.13 DAQ continues OK
 16x 
  546   Wed Mar 29 18:02:12 2017 OH, TD, DK, CGThursday 30th March02:02 Recovered DAQ from crash. Merger became
clogged and the system required a full restart.
Raspberry pi also
 31x 
  213   Thu May 5 11:10:36 2016 CG,PV,TDThursday 5 May 2016 Detector configuration - see https://elog.ph.ed.ac.uk/AIDA/193

Ribbon cable to nnaida19 FEE adaptor PCB
 8x 
  830   Thu Jun 6 08:55:15 2019 TDThursday 6 June16.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 13x 
  371   Thu Oct 6 11:16:40 2016 CG & TDThursday 6 October
DSSSD bias voltages and leakage currents
OK - see attachments 1 & 2
 9x 
  933   Thu Dec 7 17:30:36 2023 NH, CC, VP, TDThursday 7 December
Stack re-assembled - upstream to downstream
 8x 
  102   Thu May 7 01:32:39 2015 JA, TD, AE, CG & JLTThursday 7 May 201509.25 R69 continues
      100Kr setting, degrader 4mm + 0.4mm
(variable) Al
  
  644   Thu Jun 8 00:54:26 2017 OH, PWThursday 8 June 00:00-16-0008:54 DAQ still running

09:01 BRIKEN and BigRIPS stop daqs
 6x 
  645   Thu Jun 8 08:11:39 2017 NN, PVThursday 8 June 16:00 - 24:00 (evening shift)16:13  DAQ still running

16:34  BigRIPS and BRIKEN stop their DAQ
 22x 
  769   Thu Nov 8 00:55:18 2018 CA, CB, TD, OHThursday 8th November09.57 DAQ still running (R29_29)
      System wide checks ok, except nnaida7
ADC calibration failure
 14x 
  223   Thu May 12 16:55:37 2016 AE, VP, BMThursday May 12Continued work on beta-trigger for EURICA.
However the system seems to have different
noise condition than before, which 
 7x 
  620   Thu Jun 1 00:00:25 2017 TD, PV, CBThusrday 1 June 08.00-16.0007.57 run continues
      BRIKEN start run 55
      BigRIPS start run 1066
 17x 
  51   Thu Mar 5 12:11:44 2015 TDTo Do list - March 2015A draft 'to do' list in preparation for further
AIDA tests at RIKEN from mid-April.
  
  56   Sat Apr 18 09:30:11 2015 CGTo do list 19/04/15 - 21/04/15To do (roughly in order):

     Move shipped boxes
down from Gabor's office to the experimental
  
  15   Thu Oct 2 15:23:38 2014 Patrick Coleman-Smith and Chris GriffinTrial with Filtered AIDA PSUAssembled three more of the filter boards
and installed them in the AIDA PSU with the
first, wired to use the switchmode power
  
  214   Thu May 5 14:44:48 2016 PatrickTrigger selection explanationsPlease request more information if the
attached is not clear.
 Explanations_for_the_Trigger_selections_in_AIDA.pdf 
  7   Thu Sep 18 11:18:46 2014 Patrick Coleman-SmithTrying the Liverpool HV supplyThe SY1527 supply was delivered with three
modules.
A cable has been made with LEMO00
  
  36   Tue Feb 17 06:32:24 2015 CG, AE, TDTues 17th Feb progress17/02/15
1515: Installed detector BB18 2977-7
with 3 modified kapton cables, one unmodified
 22x 
  48   Tue Feb 24 03:04:59 2015 CG, TDTues 24th Feb progress24/02/15
1200: Update the FEE firmware on
nnaida1-16 without problem.
 9x 
  287   Mon Jun 6 19:26:38 2016 CG, DK, BM, AETues 7th June02.08 Tried updating AIDA SYNC on stats
page and got this message.
         
 28x 
ELOG V3.1.4-unknown