AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 3 of 46  ELOG logo
ID Date Author Subject Text Attachments
  906   Thu Oct 12 09:12:34 2023 TDThursday 12 October10.10 Water flow & temp OK
      Power ON
 47x 
  905   Wed Oct 11 16:53:20 2023 TDWednesday 11 October contd.      CAEN N1419ET ch 2 - all outputs non-floating
( internal LK fitted )
      Standard coaxial HV cable chained to
 14x 
  904   Wed Oct 11 09:37:30 2023 TDWednesday 11 October
10.00 Water flow & temp OK
      Power ON
 48x 
  903   Tue Oct 10 08:38:37 2023 TDTuesday 10 October
09.38 Water flow & temp OK
      Power ON
 40x 
  902   Mon Oct 9 14:29:12 2023 TDMonday 9 October contd.
15.20 aida10 LK4 ( front f/p -> gnd ) fitted
- investigate impact aida10 asic #4 edge
 Screenshot_from_2023-10-09_15-40-36.png 
  901   Mon Oct 9 09:03:10 2023 TDMonday 9 October09.55 Water pressure and temp OK
      Power on
 50x 
  900   Sun Oct 8 14:51:59 2023 TDSunday 8 October contd.
Slow comparator 0xf
 28x 
  899   Sun Oct 8 11:44:35 2023 TDSunday 8 October12.22 USB-controlled ac mains relay - interlock
overidden
      Water flow OK. Water temp 19 deg C
 50x 
  898   Tue Oct 3 10:16:06 2023 TDnnrpi2 scriptspi@raspberrypi:~ $ cat ./caen_screen.sh
if ! screen -list | grep -q "caenhv"; then
screen -f -S caenhv /dev/ttyACM0 9600
  
  897   Tue Oct 3 09:14:59 2023 TDTuesday 3 October
09.45 Power up
 Screenshot_from_2023-10-03_11-49-17.pngScreenshot_from_2023-10-03_12-22-30.png 
  896   Mon Oct 2 14:03:42 2023 TDMonday 2 October
15.00 DSSSD bias +60V +6.44uA - breakdown
above c. 60V, bias +100V leakage current
 Screenshot_from_2023-10-02_15-03-02.pngScreenshot_from_2023-10-02_15-02-55.pngScreenshot_from_2023-10-02_15-02-46.png 
  895   Sun Oct 1 12:38:56 2023 TDSunday 1 October12.50 Power up

      All system wide checks OK
 13x 
  894   Sat Sep 30 16:37:06 2023 TDHoneywell HSS-DPS fault
The Honeywell HSS-DPS dew point sensor indicator
( red LED ) is flashing c. 0.5Hz indicating
  
  893   Sat Sep 30 12:14:52 2023 TDSatuurday 30 September12.54 Power up

      All system wide checks OK
 10x 
  892   Thu Sep 28 16:03:40 2023 TDThursday 28 September
17.00 USB-controlled ac mains relay - no
water interlock ( yellow ) LED
 10x 
  891   Thu Aug 31 15:01:11 2023 TDTest of CAEN N1419B - T9, STFC DL
Noise test of CAEN N1419B in T9, STFC DL.
 7x 
  890   Wed Aug 30 15:30:50 2023 TDTest of AIDA ASIC mezzanines with FEE64s - summaryTest of ( previously bench-tested OK ) AIDA
ASIC mezzanines using FEE64 nnlycca5 ( MAC
d8:80:39:41:d7:c3 )
 13x 
  889   Mon Aug 21 13:17:54 2023 TDSilena 7710 HV test - JCMB 21.8.23 Silena 7710 - see attachment 1

Bias -60V
 11x 
  888   Sun Aug 20 16:21:45 2023 TDSilena 7710 HV test - JCMB 20.8.23Silena 7710 - see attachment 1

Bias -60V
 6x 
  887   Sat Aug 19 14:52:42 2023 TDBNC PB-4 & BNC PB-5 pulser test - JCMB 18.8.23BNC PB-4 - see attachment 1

Amplitude 35,000
 21x 
ELOG V3.1.4-unknown