70
|
Fri Apr 24 08:11:04 2015 |
CG, AE & TD | Thursday 23 April 2015 contd |
Image of interior of closed EURICA array
with AIDA inserted. |
|
|
49
|
Wed Feb 25 09:59:28 2015 |
CG, AE | Weds 25th Feb progress | 25/02/15
1200: Swapped out old green power
switch for new one from UoE (having previously |
  |
|
131
|
Thu Dec 10 04:56:08 2015 |
CG, AE | RIKEN progress - first day and a half | 08/12/15 - Day 0.5
Test fitted new snout to snout base
- the holes |
 |
|
167
|
Tue Mar 8 06:00:45 2016 |
CG, AE | RIKEN maintenance progress | 07/03/16
The new snout doesn't fit due to
the screw holes being misaligned. I am going |
|
|
168
|
Tue Mar 8 12:11:56 2016 |
CG, AE | RIKEN maintenance progress |
|
|
|
366
|
Sat Oct 1 07:48:48 2016 |
CG & TD | Saturday 1 October | 11.00 Moved detector stack forward several
cm. 1st DSSD now ~6cm from end of snout.
Middle of stack now ~47cm from
|
14x |
|
371
|
Thu Oct 6 11:16:40 2016 |
CG & TD | Thursday 6 October |
DSSSD bias voltages and leakage currents
OK - see attachments 1 & 2
|
9x |
|
381
|
Mon Oct 10 03:15:59 2016 |
CG & TD | Monday 10 October |
10.30 DAQ found stopped
|
25x |
|
382
|
Tue Oct 11 03:34:02 2016 |
CG & TD | Tuesday 11 October | 10.40 DAQ found stopped
All FEE64 AIDA SYNC rates zero, AIDA |
16x |
|
461
|
Mon Nov 21 02:12:45 2016 |
CG & TD | Monday 21 November |
11.10 DSSSD bias & leakage currents OK -
see attachments 1 & 2
|
12x |
|
50
|
Wed Mar 4 17:38:06 2015 |
CG | Log book for Feb 2015 tests | 04/03/15
Please find attached a scan of the
log book for the Feb 2015 AIDA tests at RIKEN. |
|
|
56
|
Sat Apr 18 09:30:11 2015 |
CG | To do list 19/04/15 - 21/04/15 | To do (roughly in order):
Move shipped boxes
down from Gabor's office to the experimental |
|
|
114
|
Fri Jul 17 16:00:38 2015 |
CG | Run summary for Apr-May 2015 |
A table summarising the run information
within the lab book and ELog for Apr-May. |
|
|
125
|
Fri Nov 20 16:29:49 2015 |
CG | New Kapton cable tests at DL | Powered system up from state it was left
in last night. Biased to +200V with leakage
current 3.9uA @ room temp 23.3oC. |
|
|
128
|
Wed Dec 2 18:39:44 2015 |
CG | New Kapton cable tests at DL | Powered on system ok.
Electrical connection between crate
and mezzanines still persists, but only to |
  |
|
134
|
Mon Dec 14 07:56:27 2015 |
CG | RIKEN progress | 13/12/15
Current jumper setup:
- detector |
10x |
|
138
|
Thu Jan 7 13:55:24 2016 |
CG | RIKEN progress - 15/12/15 (late) | Tues 15/12/15
Swapped previously tripped detector
(3131-11) on to kaptons already in place |
 |
|
254
|
Mon May 30 02:50:19 2016 |
CG | Monday 30th May | 10.30 Pulser walkthrough carried out 90,000
- 10,000 @ 10,000 step
|
 |
|
298
|
Wed Jun 8 20:56:28 2016 |
CG | Thurs 9th June | 04.45 Lowered slow comp threshold on all FEEs
bar nnaida24 to 8 (nnaida24 @ 12).
Fast comp thresh @ 6 on all nnaida.
|
6x |
|
396
|
Thu Oct 20 20:00:14 2016 |
CG | Returned module tests @ DL | Original system configuration before my arrival:
nnaida11 - 2b:22:6e
|
7x |