AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 43 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Text Attachments
  78   Wed Apr 29 01:03:41 2015 JA, LHB, TD, AE, CG & VPWednesday 29 April 2015Overnight
      Beam tuning, PID tests - beam stopped
in scintilator detector + 1" thick Pb bricks
 16x 
  77   Tue Apr 28 11:22:25 2015 VPRPIreplace RPI with model B+.  4 USB
ports + 4 port switch
 
  
  76   Tue Apr 28 06:25:13 2015 JA, LHB, TD, AE & CGTuesday 28th April progress28/04/15
1420: Carried out ASIC optimisation
tests to find best shaping time. Chose system
 6x 
  75   Tue Apr 28 05:59:48 2015 AE"beta" trigger from MACB Trigger outputsWe've constructed a beta trigger with the
signals from the p-side of the three DSSDs
(OR of all fast
 6x 
  74   Mon Apr 27 04:54:02 2015 VFEP & TD[How To] Remote control of CAEN N1419 Programmable HV Power Supply
@ CAEN N1419
 N1419_rev4.pdf30.png 
  73   Mon Apr 27 01:48:59 2015 JA, LHB, TD, VP, AE & CGMonday 27 April 2015DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
 8x 
  72   Sun Apr 26 02:28:59 2015 JA, LHB, TD, AE & CGSunday 26 April 2015
Upstream, 207Bi source
 33x 
  71   Sat Apr 25 03:56:44 2015 JA, LHB, TD, AE & CGSaturday 25 April 2015
1130: Rotated forward water inlet connection
to point towards rear of AIDA stand to remedy
 IMG_2852.JPGIMG_2853.JPGIMG_2858.JPGIMG_2860.JPG 
  70   Fri Apr 24 08:11:04 2015 CG, AE & TDThursday 23 April 2015 contd
Image of interior of closed EURICA array
with AIDA inserted.
 IMG_2850.JPG 
  69   Thu Apr 23 10:27:59 2015 CG, AE, TDThursday 23rd April progress23/04/15
1800: Spent majority of the day moving
AIDA forward and into EURICA.
 IMG_2846.JPGIMG_2847.JPGIMG_2848.JPGIMG_2849.JPG 
  68   Thu Apr 23 09:02:57 2015 TD, PatrickFEE64 Fast Discriminator OR o/p via MACB> Illustration of the trigger timing of the
AIDA FEE64 fast discriminator OR output via
the
  
  67   Thu Apr 23 03:21:48 2015 TDMSL type BB18(DS)-1000MSL type BB18

Serial Thickness Depletion Date Note Location
  
  66   Wed Apr 22 08:50:59 2015 CG, AE, TDWednesday 22nd April progress22/04/15
1230: Solved problem (empty spectra
despite changing modules) with nnaida5 noted
 20150422_nnaida1_FWHM.png20150422_nnaida3_FWHM.png20150422_nnaida5_FWHM.png20150422_nnaida8_FWHM.png 
  65   Wed Apr 22 07:28:25 2015 AE (PM)Mechanical setup instructions: AIDA+EURICA at F11Attached are Paul Morrall's instructions on
how to move new AIDA support table into place,
for a setup with 
 AIDA_procedure_document.docx 
  64   Wed Apr 22 03:33:01 2015 TDFEE64 Fast Discriminator OR o/p via MACBIllustration of the trigger timing of the
AIDA FEE64 fast discriminator OR output via
the
 tek00000.tiftek00001.tif 
  63   Tue Apr 21 09:39:00 2015 AELISE estimates for implantation setup [updated][UPDATED 22/4: initial LISE file had incorrect
thickness for MACi plastic]
 LISE_estimates_84Zn.docxLISE_estimates_94Se.docx 
  62   Tue Apr 21 06:01:50 2015 CG, TDTuesday 21 April 201521/04/15
1325: Recabled the MACB distribution
tree as per PC-S instruction yesterday.
 8x 
  61   Mon Apr 20 09:45:38 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply ++

    

       
            
  
  60   Mon Apr 20 09:38:15 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply
  
  59   Mon Apr 20 09:07:59 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply

    

       
            
  
ELOG V3.1.4-unknown