ID |
Date |
Author |
Subject |
Text |
|
58
|
Mon Apr 20 07:39:49 2015 |
CG, TD | Rasberry Pi : USB ac mains switch + USB serial link to FEE64 console |
It would appear that you cannot reliably
startup the Raspberry Pi (nnrpi1)
|
|
57
|
Mon Apr 20 06:53:24 2015 |
CG, TD | Progress 20th April + RPi procedure | 20/04/15
1200: Complete all points on first
part of check list, except checking the PSU |
7x |
56
|
Sat Apr 18 09:30:11 2015 |
CG | To do list 19/04/15 - 21/04/15 | To do (roughly in order):
Move shipped boxes
down from Gabor's office to the experimental |
|
55
|
Mon Mar 9 16:51:26 2015 |
TD | AIDA adaptor PCB configuration - RIKEN - Feb 2015 | |
6x |
54
|
Mon Mar 9 16:45:35 2015 |
TD | Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains |
3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz
via local transformer |
7x |
53
|
Mon Mar 9 13:59:32 2015 |
TD | New AIDA support frame for F11/F12 @ RIKEN | |
|
52
|
Mon Mar 9 09:02:03 2015 |
Patrick Coleman-Smith | Adding Filters to the AIDA PSU. | This guide is to help with the filter
pcb assembly and installation into the AIDA
power supply. |
|
51
|
Thu Mar 5 12:11:44 2015 |
TD | To Do list - March 2015 | A draft 'to do' list in preparation for further
AIDA tests at RIKEN from mid-April.
|
|
50
|
Wed Mar 4 17:38:06 2015 |
CG | Log book for Feb 2015 tests | 04/03/15
Please find attached a scan of the
log book for the Feb 2015 AIDA tests at RIKEN. |
|
49
|
Wed Feb 25 09:59:28 2015 |
CG, AE | Weds 25th Feb progress | 25/02/15
1200: Swapped out old green power
switch for new one from UoE (having previously |
|
48
|
Tue Feb 24 03:04:59 2015 |
CG, TD | Tues 24th Feb progress | 24/02/15
1200: Update the FEE firmware on
nnaida1-16 without problem. |
9x |
47
|
Mon Feb 23 11:10:44 2015 |
TD | Outline test plan - RIKEN - Feb 2015 |
With the exception of one AIDA FEE64 PSU
configuration test (5) and the upgrades
|
|
46
|
Mon Feb 23 07:23:08 2015 |
J. Agramunt, H. Baba, A. Estrade | DAQ correlation test | The attached figure shows the configuration
used to test the synchronization of the DAQ
systems using a
|
|
45
|
Mon Feb 23 07:03:10 2015 |
TD, AE & CG | Monday 23 February 2015 | 14.30 Saved nnaida1-16 ASIC + Waveform
configurations to directory (Data Base Key)
|
|
44
|
Sun Feb 22 06:47:23 2015 |
CG, AE, TD | Sunday 22 February 2015 | 22/02/15
am Testing various
grounding configurations for the connection |
|
43
|
Sat Feb 21 06:37:52 2015 |
CG, AE, TD | Sat 21st Feb progress | 21/02/15
1230: Developing the software to
check synchronisation between DAQs. Below |
6x |
42
|
Fri Feb 20 10:48:09 2015 |
TD | How To Connect the FEE64 System Console Using PuTTY |
Set permissions for the USB-serial device
using the command
|
|
41
|
Fri Feb 20 10:04:29 2015 |
CG, AE, TD | Fri 20th progress | 20/02/15
1400: Measured leakage current as
function of bias V for the Caen 1419B high |
|
40
|
Thu Feb 19 08:21:33 2015 |
CG, AE, TD | Thrus 19th Feb progress | 19/02/15
1000: Check system gives same resolution
as yesterday, removing only the Cu braiding |
39x |
39
|
Wed Feb 18 11:25:54 2015 |
Patrick Coleman-Smith | Investigations into removing HV noise | With the system in T9 and a Keithley
Source Meter supplying HV to the detector.
The source meter supplies 200V and |
|