Fri Aug 4 09:07:08 2023, TD, Friday 4 August 23x
|
07.00 DAQ stopped
Overnight run for background alphas
|
Thu Aug 3 14:16:12 2023, TD, Thursday 3 August contd. 21x
|
15.16 DSSSD bias +100V leakage current +8.415uA
|
Thu Aug 3 09:21:26 2023, TD, Thursday 3 August 47x
|
10.20 DSSSD bias +100V leakage current +6.565uA - attachment 1
|
Wed Aug 2 15:39:52 2023, TD, Wednesday 2 August contd. 11x
|
16.22 Add LK1 to aida01
DSSSD bias -100V leakage current -7.950uA
|
Wed Aug 2 08:44:00 2023, TD, Wednesday 2 August 48x
|
09.40 Al snout electrically connected ( < 1 Ohm ) to Al gasket and Al base plate
Al snout electrically isolated ( > 20 MOhm ) from aida02 FEE64 adaptor PCB and AIDA support frame
|
Tue Aug 1 08:50:36 2023, TD, Tuesday 1 August 30x
|
09.50 DSSSD bias +100V leakage current +9.255uA - attachment 2
|
Mon Jul 31 09:43:37 2023, TD, Monday 31 July 44x
|
10.43 DSSSD bias +100V leakage current +7.550uA
|
Mon Jul 24 08:54:48 2023, TD, Monday 24 July 17x
|
09.54 DSSSD#1 bias +100V leakage current +9.065uA
|
Mon Jul 24 08:39:39 2023, TD, aida10 sys console output & aida10 options 
|
Options and system cosnole disagree about which version of the DataAcq program is in use? |
Sun Jul 23 08:50:48 2023, TD, Sunday 23 July 19x
|
09.50 Cooknell HV2
2x + polarity, grounded HV channels
|
Sat Jul 22 08:17:48 2023, TD, Saturday 22 July 26x
|
09.20 CAEN N1419ET
Floating outputs
Channel #3 + polarity, Channels #0-2 - polarity
|
Sun Jul 16 14:20:31 2023, TD, Sunday 16 July contd. 27x
|
15.20 All ERNI pins of aida01 adaptor PCB OK => FEE64 #1 ASIC #2 channel #5 issue faulty test C? faulty ASIC channel?
Fitted drain wire from aida06 & aida08 adaptor PCBs to FEE64 cooling plates
|
Sun Jul 16 09:36:40 2023, TD, 15-16 July 2023 40x
|
Saturday 15 July
|
Fri Jul 7 11:59:06 2023, TD, Test of AIDA FEE64 - summary 11x
|
Test of AIDA FEE64s
ISOL test station STFC DL, T9
|
Fri Jul 7 10:52:34 2023, TD, PJCS, Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced 16x
|
Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced
|
Fri Jul 7 10:15:09 2023, TD, Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced 17x
|
Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced. Cooling plate fitted - no base plate.
ISOL test station STFC DL, T9
|
Thu Jul 6 10:20:25 2023, TD, Unable to start Rly16 server
|
Unable to start Rly16 server - see attachment 1
|
Wed Apr 12 12:32:13 2023, PJCS, ASIC power short problem 
|
I have taken videos with an Infrared camera of the power being supplied to one isolated ASIC on a mezzanine.
The power supply is a bench supply with current limit set to 3A.
The centre of the ASIC glowed white hot for a short time and then the whole ASIC shows as hot. Ths the short is on the ASIC and not the bond |
Wed Mar 1 16:42:06 2023, Further results from Mezzanine bench tests, PJCS 
|
Carried out some further work on failed mezzanine modules.
Inspected them externally and removed the copper block, internally with a bench microscope.
Found two obvious faults ..... broken components with scrambled pcb tracks. |
Thu Feb 23 16:15:31 2023, TD PJCS, Bench test of AIDA FEE64 mezzanines 7x
|
Attachments 2 & 7 AIDA FEE64 mezzanine with
1) adaptor PCB connected to ERNI input connector
|