AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 7 of 46  ELOG logo
Entry  Wed Nov 14 07:43:35 2018, TD, Wednesday 14 November 16:00 - 00:00 21x
16.44 DAQ continues OK - AIDA file RIBF148/R5_432
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Tue Nov 13 22:58:49 2018, OH , Wednesday 14 November 08:00 - 16:00 30x
08:01 BigRips and BRIKEN stop
      AIDA on file R5_346
Entry  Tue Nov 13 14:27:38 2018, LS, Wednesday 14 November 00:00 to 08:00 9x

00:00 BRIKEN stop AIDA file RIBF148/R5_269 
Entry  Wed Jun 14 07:01:34 2017, TD, Wednesday 14 June 21x
15.01 DAQ continues
      AIDA file RIBF148/R8_22
Entry  Wed Oct 12 02:58:19 2016, TD & CG, Wednesday 12 October 1.png2.png3.png4.png5.png
10.50 Merger & TapeServer found stopped
      connect errors - see attachment 1
Entry  Wed Jun 12 01:54:04 2019, OH, TD, CG, CB, CA, Wednesday 12 June 11x
09:54 DAQ Continues ok with merger running at ~ 560k data items per second

      ASIC settings 2019May19-17.54.03
Entry  Wed Oct 11 16:53:20 2023, TD, Wednesday 11 October contd. 14x
      CAEN N1419ET ch 2 - all outputs non-floating ( internal LK fitted )
      Standard coaxial HV cable chained to aida12, aida03, aida11, aida09, aida01 & aida10
      aida04 LK1 ( local gnd ) fitted
Entry  Wed Oct 11 09:37:30 2023, TD, Wednesday 11 October 48x

10.00 Water flow & temp OK
      Power ON
Entry  Wed May 11 06:37:32 2016, AE, VP, BM, Wednesday 11 May Eurica_timestamp.pngAIDA_timestamp.pngTimestamp_correlation_AIDA_EURICA.png
*2:30 pm*: changed power source of USB-controlled power supply for FEEs. Now one of the power cables is connected
to the 'B' power supply of F11, and the second to the 'C' power supply (these are in the unit on top of WASBI
crates). The reason for change is that before both were connected to 'C', and drained current was very close to
Entry  Wed May 10 02:55:13 2017, TD, OH, Wednesday 10 May 8x
10.55 DAQ continues OK 
      Current file May2017/R6_44
Entry  Wed Nov 1 02:24:20 2017, OH, Wednesday 1 November 011117_1120_bias.png011117_1122_feetemps.png011117_1123_stats.png
11:24 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Wed Jun 1 01:33:58 2016, TD, Wednesday 1 June 2016 9x
09.30 Detector biases and leakage currents - ambient temp +24.9 deg C - attachments 1-2

10.08 Connection lost to nnaida27 and nnaida28 
    Reply  Wed Jun 1 09:00:13 2016, TD - Reply PJCS, Wednesday 1 June 2016 
> 09.30 Detector biases and leakage currents - ambient temp +24.9 deg C - attachments 1-2

> 10.08 Connection lost to nnaida27 and nnaida28 
    Reply  Wed Jun 1 13:58:48 2016, TD - Reply PJCS, Wednesday 1 June 2016 500.png501.png503.png505.png

> Check the Local Controls for the setting of the LMK3200 control rgister.
> If you recall from the problem with nnaida5 the value should be 0xB.
Entry  Tue Jun 18 23:58:46 2019, CB, Wed Jun 19 8:00-16:00  19x
08:00 Shift change
      No change in settings
Entry  Wed Jun 19 08:30:36 2019, CG, Wed Jun 19 16.00 - end of run AIDAimplants.png
16.10 DAQ continues as before.
      Merger rate ~700k items/s and ~5.3Kb/s
      Individual FEE rates remain roughly constant
Entry  Tue Jun 6 15:59:19 2017, DK, Wed 7 June night shift 14x
7 June 2017   

00:05  All system-wide checks are passed
Entry  Wed Feb 18 05:49:29 2015, CG, AE, TD, PJC-S, Wed 18th Feb progress 15x
18/02/15
1300: Error seen when trying to check ASIC settings. See Attachment #1. Power cycle removed error.
           nnaida3 still performing much better than other three cards connected to detector
Entry  Fri Jun 9 04:53:24 2017, TD, Waveforms 28x

x-scale 1000ch = 2ms
y-scale expanded
Entry  Sat Oct 28 06:25:07 2017, TD, Waveforms 10x

For comparison with waveforms shown in https://elog.ph.ed.ac.uk/AIDA/665 and https://elog.ph.ed.ac.uk/AIDA/668
ELOG V3.1.3-7933898