AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 7 of 46  ELOG logo
ID Date Author Subjectdown Text Attachments
  783   Wed Nov 14 07:43:35 2018 TDWednesday 14 November 16:00 - 00:0016.44 DAQ continues OK - AIDA file RIBF148/R5_432
      165Pm BigRIPS setting + 2.8mm Al degrader
 21x 
  782   Tue Nov 13 22:58:49 2018 OH Wednesday 14 November 08:00 - 16:0008:01 BigRips and BRIKEN stop
      AIDA on file R5_346
 30x 
  781   Tue Nov 13 14:27:38 2018 LSWednesday 14 November 00:00 to 08:00
00:00 BRIKEN stop AIDA file RIBF148/R5_269
 9x 
  661   Wed Jun 14 07:01:34 2017 TDWednesday 14 June15.01 DAQ continues
      AIDA file RIBF148/R8_22
 21x 
  383   Wed Oct 12 02:58:19 2016 TD & CGWednesday 12 October10.50 Merger & TapeServer found stopped
      connect errors - see attachment 1
 1.png2.png3.png4.png5.png 
  838   Wed Jun 12 01:54:04 2019 OH, TD, CG, CB, CAWednesday 12 June09:54 DAQ Continues ok with merger running
at ~ 560k data items per second
 11x 
  905   Wed Oct 11 16:53:20 2023 TDWednesday 11 October contd.      CAEN N1419ET ch 2 - all outputs non-floating
( internal LK fitted )
      Standard coaxial HV cable chained to
 14x 
  904   Wed Oct 11 09:37:30 2023 TDWednesday 11 October
10.00 Water flow & temp OK
      Power ON
 48x 
  220   Wed May 11 06:37:32 2016 AE, VP, BMWednesday 11 May*2:30 pm*: changed power source of USB-controlled
power supply for FEEs. Now one of the power
cables is connected
 Eurica_timestamp.pngAIDA_timestamp.pngTimestamp_correlation_AIDA_EURICA.png 
  561   Wed May 10 02:55:13 2017 TD, OHWednesday 10 May10.55 DAQ continues OK 
      Current file May2017/R6_44
 8x 
  694   Wed Nov 1 02:24:20 2017 OHWednesday 1 November11:24 DAQ running OK - data transfer not enabled

      BNC PB-4
 011117_1120_bias.png011117_1122_feetemps.png011117_1123_stats.png 
  265   Wed Jun 1 01:33:58 2016 TDWednesday 1 June 201609.30 Detector biases and leakage currents
- ambient temp +24.9 deg C - attachments
1-2
 9x 
  267   Wed Jun 1 09:00:13 2016 TD - Reply PJCSWednesday 1 June 2016> 09.30 Detector biases and leakage currents
- ambient temp +24.9 deg C - attachments
1-2
  
  269   Wed Jun 1 13:58:48 2016 TD - Reply PJCSWednesday 1 June 2016
> Check the Local Controls for the setting
of the LMK3200 control rgister.
 500.png501.png503.png505.png 
  854   Tue Jun 18 23:58:46 2019 CBWed Jun 19 8:00-16:00 08:00 Shift change
      No change in settings
 19x 
  855   Wed Jun 19 08:30:36 2019 CGWed Jun 19 16.00 - end of run16.10 DAQ continues as before.
      Merger rate ~700k items/s and ~5.3Kb/s
      Individual FEE rates remain roughly
 AIDAimplants.png 
  640   Tue Jun 6 15:59:19 2017 DKWed 7 June night shift7 June 2017   

00:05  All system-wide checks are passed
 14x 
  38   Wed Feb 18 05:49:29 2015 CG, AE, TD, PJC-SWed 18th Feb progress18/02/15
1300: Error seen when trying to check
ASIC settings. See Attachment #1. Power cycle
 15x 
  648   Fri Jun 9 04:53:24 2017 TDWaveforms
x-scale 1000ch = 2ms
y-scale expanded
 28x 
  689   Sat Oct 28 06:25:07 2017 TDWaveforms
For comparison with waveforms shown in https://elog.ph.ed.ac.uk/AIDA/665
and https://elog.ph.ed.ac.uk/AIDA/668
 10x 
ELOG V3.1.3-7933898