AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 8 of 44  ELOG logo
Entry  Fri May 17 02:15:56 2019, CA, TD, OH, Friday 17 May 15x
10.18 DAQ continues OK to file May19/R5_1

      alpha background
Entry  Thu May 16 02:13:10 2019, CA, OH, TD, Thursday 16th May 16x
10:13 all system wide checks OK *except* nnaida7 fails ADC calibration

      FEE64 temperatures OK - see attachment 1
Entry  Wed May 15 02:17:23 2019, CA, OH, TD, Wednesday 15 May 20x
10.18 DAQ continues OK to file May19/R2

      alpha background
Entry  Tue May 14 02:19:20 2019, CA, OH, TD, Tuesday 14th May 2019 11x
10.20 System wide checks ok (except naida07 ADC calibration failure)

      FEE temperatures ok (attachment 1)
Entry  Mon May 13 10:13:26 2019, TD, AIDA with 25MHz external clock does not work ... ! 2.png

OH setup AIDA external clock using  Tektronix AFG3102 - settings as follows
Entry  Mon May 13 10:00:01 2019, TD, Report - low - SETUP/Perform Timestamp Resync produces error message 1.png

AIDA@RIKEN
Entry  Mon May 13 03:43:08 2019, CA, TD, OH, Sunday 12 May 14x

19.12 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Mon May 13 03:23:58 2019, CA, TD, OH, Monday 13 May 18x

09.55 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sat May 11 02:50:14 2019, CA, OH, TD, Saturday 11th May 2019 190511_1053_stats.png190511_1053_temp.png190511_1054_bias.png
10:52 system wide checks ok, except naida07 fails ADC calibration
      good event statistics, rates in naida19,20,23,24 high (attachment 1)
      FEE temperatures ok (attachment 2)
Entry  Fri May 10 05:58:01 2019, CA, OH, TD, Friday 10 May 2019 12x
11.00 - chiller refilled and switched on
        set to 20 degrees celsius
Entry  Tue Mar 26 14:02:59 2019, OH, Inventory to be shipped back 
Inventory is currently packaged up under the AIDA desk in B3F

Entry  Sun Nov 18 02:02:48 2018, TD, Latest detector bias & leakage current spreadsheet (URL and csv & xlsx files) AIDA_leakage_current(17).xlsxAIDA_leakage_current_-_Sep2018.csv
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1347508769
Entry  Fri Nov 16 06:01:47 2018, CA, High Energy Channel Ex vs Ey for different degrader thicknesses 2_3HECexey.png2_8HECexey.png3_0HECexey.png3_3HECexey.png
15.04 Plots of X Energy vs Y Energy for each detector, and for 4 different Al degrader thicknesses, as indicated
on each graph. (Attachments 1-4)
Entry  Fri Nov 16 04:47:39 2018, CA, TD, OH, Correlation analysis at different degrader Al thickness 3mmcorr.png181116_1350_det12.png181116_1351_det34.png181116_1352_det56.png
13.53 Correlation analysis plot of all detectors with 3.3mm Al degrader thickness (attachment 1)
 
13.54 Correlation analysis plot of detectors 1 and 2 with 3mm, 2.3mm and 2.8mm degrader thickness (attachment 2)
Entry  Thu Nov 15 22:55:38 2018, CA, TD, OH, LS, Friday 16th November 08.00 - 16.00 42x
07.56 DAQ continues - AIDA file RIBF148/R5_822
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Thu Nov 15 15:05:33 2018, LS, Friday 16 November 00.00 to 08.00 9x

00.25 System wide checks ok * except nnaida 7 fails adc*
      FEE Temps ok - attachment 1
Entry  Thu Nov 15 06:52:09 2018, OH, Thursday 15th November 16:00 - 24:00 11x
15:51 DAQ continues - AIDA file RIBF148/R5_664
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Wed Nov 14 22:54:11 2018, LS, Thursday 15th November 08:00 - 16:00 10x

08.10 BRIKEN stop
      AIDA file RIBF148/R5_587
Entry  Wed Nov 14 14:46:47 2018, CA, Thursday 15th November 00:00 - 08:00 25x
23.58 DAQ continues ok (RIBF148/R5_505)

00.09 system wide checks ok, except nnaida7 ADC calibration failure
Entry  Wed Nov 14 07:43:35 2018, TD, Wednesday 14 November 16:00 - 00:00 21x
16.44 DAQ continues OK - AIDA file RIBF148/R5_432
      165Pm BigRIPS setting + 2.8mm Al degrader
ELOG V3.1.4-unknown