AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 6 of 21  ELOG logo
ID Date Author Subject Text Attachments
  Draft   Mon May 29 07:06:56 2017 K. MatsuiEnergy loss in Long Plastic ScintillatorAfter Al degrader with the optimized width
of 13 mm, the energy loss in Long Plastic
Scintillator is 546(2) MeV at F11.
  
  Draft   Mon May 29 05:40:49 2017 K. Matsuienergy loss at logn     
  317   Mon May 29 04:17:34 2017 YSClover EfficiencyClover gamma detection efficiency calculation
with 152Eu
Date of the measurement: 2017-05-26 10:15
 eff_crystal.pdfeff_total.pdfEURICA_efficiency.jpg 
  316   Sun May 28 11:41:24 2017 YSCLOVER energy calibrationClover calibration with 152Eu

Used peaks [keV]: 121.7817, 244.6975, 344.2785,
  
  315   Sat May 27 11:19:57 2017 AIM, ATAIDA+BRIKEN backgroundBackground measurement AIDA+BRIKEN
AIDA is inside BRIKEN
  
  314   Sat May 27 10:36:20 2017 JA,AT,JLTBRIKEN DACQManuals for BRIKEN DACQ: 
GasificShort.pdf including "Run protocol"
and Gasific70Manual.pdf (long)
 Gasific70Manual.pdfGasificShort.pdf 
  312   Sat May 27 04:46:55 2017 AIMsources infoHere is the sunflower webpage with information
on the calibration sources:
  
  311   Fri May 26 14:42:12 2017 JL, ATBackgroundBackground measurement (no AIDA)

  
  310   Fri May 26 14:27:08 2017 AIM, ATBRIKEN Configuration FileNew configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
 170526_Conf_BrikenFull.xlsx 
  308   Fri May 26 09:07:46 2017 J. AgramuntSynchronization MonitoringWe started the synchronization monitoring
programs to check that
it is OK as can be seen in the figure below
 synchroCheck.pngSynchronizationMonitoring.pdf 
  307   Fri May 26 04:20:54 2017 JLT,AA,ATCLOVER 60Co60Co No AIDA, Efficiency calibration

Start: 12:21
  
  306   Fri May 26 03:52:23 2017 AT,AA,JLTCLOVER, 137Cs137Cs, No AIDA, Efficiency calibration

Source ID: 393
  
  305   Fri May 26 03:24:38 2017 GK,VP, AT, AACLOVER, 133Ba133Ba source efficiency calibration, no AIDA

Start: 11:23
  
  304   Fri May 26 02:17:40 2017 AT, AIM, JLT,AA, PV, KM152EuCalibration with 152Eu source.

START time:10:15
  
  303   Thu May 25 14:31:46 2017 AT, JLT, AA, AIMBackground measurementBackground, No AIDA

Start:22:31
 7x 
  302   Thu May 25 13:56:00 2017 AT, JLT, AA252Cf252Cf source in Z=0cm position. 

Start:21:57
  
  301   Thu May 25 13:42:45 2017 AT, PC,KR,JLT,AA252Cf252Cf source in Z=0cm position. 

Start:21:41
  
  300   Thu May 25 13:38:11 2017 AT, PC, KR, JLT, AAClover, detectors in new positionBoth clover detectors were moved. They are
in a symmetrical position. The end on the
clover nose is of the order
 CLOVER-sketch.jpgD4-insertion.jpgG7-insertion.jpg 
  299   Thu May 25 13:24:02 2017 AT,PC,KR,JLT,AACLOVER, detector not in its rigth positionWe have noticed that D4 is not in its right
position. That explains the different number
of counts in the
  
  298   Thu May 25 12:53:47 2017 AT, PC, JLT, KR, AAClover, 60Co60Co source 

Source ID: CD395
  
ELOG V3.1.4-unknown