  330   Mon Oct 16 05:52:14 2017 BRIKEN collaborationSTART preparationWe start to check every thing for the coming
run
 171016_Conf_BrikenFull.xlsx 
  171   Sat Nov 26 06:30:30 2016 ATSetupSetup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u
  
  321   Mon Jun 12 02:45:44 2017 Iris Dillmann ATSetup detectors. Id of Ancillary@BRIKENAttachment 1: Setup detectors 
Attachment 2: example of configuration file
(valid only for RIBF127). The Id of the ancillary
 Setup-26May2017.pngOfflineConf_Signals.csv 
  145   Tue Nov 8 17:00:27 2016 NTB, CG, ATSi Delta EAt least during the timeframe in between
~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root)
we see that the silicon dE have a very low
  
  123   Mon Nov 7 04:37:33 2016 Phong,Liu,...Si de and AIDA plastic calibration60Co source placed close to the detectors:

ROOT files: 
  
  190   Tue Nov 29 00:30:42 2016 PV,SNSillicon dE bias voltage increasedWe increase the bias voltage of the dE
detector from 20 V to 100 V

Leakage current:
  
  134   Tue Nov 8 02:49:19 2016 PV, LiuSpecification of the dE silicon detectorThe specification and picture of the dE silicon
detector is shown in the attached photos.
The detector  has an effective area of 134
 spec_de_1.jpgspec_de_2.jpgIMG_1340.JPG 
  358   Tue Oct 16 03:15:03 2018 ATD & JLTStart of REP run preparation (RIBF148)16-Oct-2018

- Start DACQ computer: OK!
 Screenshot_from_2018-10-16_14-57-33.png 
  210   Wed Mar 29 13:31:37 2017 J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL TainStart of parasiticStart of parasitic Ca beam
(main experiment "New isotope search", Ahn
et al.)
 170329_Conf_BrikenFull.xlsx 
  348   Wed Oct 25 01:02:14 2017 RGStatus of the YSO arrayThe presently used detector has 48x48x5
mm3 YSO array with 1x1mm2 segments. They
are separated with ESR.  We use H8500
  
  12   Sun May 3 09:04:07 2015 J.L. Tain, J. Agramunt, G. KissSummary of neutron measurements
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
  
  308   Fri May 26 09:07:46 2017 J. AgramuntSynchronization MonitoringWe started the synchronization monitoring
programs to check that
it is OK as can be seen in the figure below
 synchroCheck.pngSynchronizationMonitoring.pdf 
  207   Wed Mar 29 03:02:02 2017 J. AgramuntSynchronization test procedure (update) To Launch the processes:

Open 4 terminals:
  
  396   Fri Oct 26 03:31:33 2018 AT2 & JATest pulser effect on baselineWe have tested possible change of the baseline
in the digitizer due to the pulser connection.
NO EFFECT has been
 6x 
  20   Tue May 5 02:19:58 2015 j.Agramunt J.L.Tain K.Gabor The Lower polyethylene pieces was swampedThe Lower polyethylene pieces was swamped.
In the photo beam comes from the
left.
 photo-4.JPG 
  322   Mon Jun 12 22:28:02 2017 OscarThe SUSHIRO app guideIt's here...it's rough...but it hopefully
gets the job done
 SUSHIRO_For_Dummies_V001.pdf 
  105   Thu Nov 3 14:02:49 2016 Nepal, J Ha, PV, Liu JThe degrader system has been setWe used the laser to align the degrader
(see attached photos)

According to the LISE calculation,
 IMG_1318.JPGIMG_1317.JPG 
  203   Mon Mar 27 11:53:15 2017 PV,LiuTurn on dE detectorWe applied a bias voltage of 100 V to the
dE detector

Current read = 0.660 uA
 1_top_60co.png2_top_noiselvl.png3_bottom_60co.png4_bottom_noiselvl.png 
  6   Wed Feb 25 07:38:42 2015 A. Estrade J. Agramunt Usage of synchronization test programsIn order to access to the synchronization
test, we prepare two programs in the PC 
briken1 ( 10.32.6.54).
 15.pngDataRelayFilter_terminal.png 
  75   Tue Oct 11 15:58:01 2016 JL Tain et alVETO DetCheck of Plastic and NaI veto detectors and
DACQ settings
 IMG_20161012_124010.jpgPlastic-137Cs.pdfNaI-137Cs.pdf 