Tue Jul 19 04:09:32 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Last tube fit in the matrix!!!
|
| The photo of great moment |
Tue Jul 19 04:34:57 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Photos of the electronics 9x
|
| Racks, crates, rear part of the preamps and matrix with all tubes. |
Tue Jul 19 11:54:03 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Photos of the AIDA insertion hole with the 3He tubes  
|
RIKEN tubes on the AIDA side with the SHV right angle connector will protrude
by ~95mm in the HYBRID configuration (with CLOVERS).
In the current AIDA DSSD configuration there are six detectors occupying 45-50mm
|
Thu Oct 6 02:03:32 2016, JL Tain, START 6x
|
We started the assembly of BRIKEN and AIDA detectors in their final position
on Tuesday October 4:
|
Sun Oct 22 10:26:44 2017, JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR, First Wasabi-YSO-BRIKEN correlation test 
|
60Co source between YSO and Wasabi in front of D4 Clover
Briken configuration file: 171022_1811_Conf_BrikenFullYSO.xlsx WRONG!!!
Start: 18:25
|
Sun Oct 22 11:14:35 2017, JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR, 252Cf source Wasabi-BrikenYSO
|
252Cf source in the middle of Wasabi and YSO in front of Clover D4
Start: 19:15
|
Sat Oct 21 17:05:21 2017, JA,ATD, JLT, New DACQ hardware configuration
|
Configuration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel
|
Sun Oct 22 11:32:59 2017, JA,ATD, JLT, New Gasific Configuration file
|
| |
Sat May 27 10:36:20 2017, JA,AT,JLT, BRIKEN DACQ 
|
Manuals for BRIKEN DACQ:
GasificShort.pdf including "Run protocol"
and Gasific70Manual.pdf (long) |
Thu Mar 30 20:13:11 2017, JA, GK, DK, 40Mg run25
|
Date: 31/03/2017
Start: 04:13
BRIKEN run: 25
|
Fri Oct 26 15:15:55 2018, JA, ATS, ATD, JLT, AA, Background measurements
|
No pulser (inhibit in clock)
DLT: 181026_2244_Bkg_NoPulser_114.dlt
|
Sat Oct 21 17:11:03 2017, JA, ATD, JLT, New Gasific configuration file
|
Configuration file saved on 22-Oct-2017 at 00:59
after increasing all the threshold in all 3He tubes to about 100keV.
Also the threshold of Clover detectors was slightly increased. |
Sat Oct 21 17:14:55 2017, JA, ATD, JLT, 252Cf efficiency calibration
|
Measurement of BRIKEN neutron counter efficiency
252Cf source in the (approximately) center
Wasabi and D4 clover inserted. G7 on the floor.
|
Sat Oct 21 17:30:23 2017, JA, ATD, JLT, Background measurement overnight  
|
22/10/2017
Start: 01:26
Run: 037
|
Sat Apr 1 13:15:37 2017, JA ID OH PV, Na37 Ne36 Run 064
|
Date: 1/04/2017
Start:21:13
BRIKEN run: 63
|
Thu Mar 30 21:01:54 2017, JA DK KG Liu, Run 27
|
Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
|
Thu Mar 30 06:30:06 2017, JA CG PV SN, Run 13
|
Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
|
Mon Jun 12 02:38:27 2017, JA AA AIM AT AT, VME crate & new configuration
|
Sun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
|
Wed Jul 20 11:40:00 2016, J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ..., 252Cf   
|
First measurement with full 140 tube version
of the BRIKEN neutron detector
|
Wed Jul 20 11:49:00 2016, J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ..., Background
|
18/07/2016
First background measurement overnight.
|