AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 10 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  42   Tue Jul 19 04:09:32 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Last tube fit in the matrix!!!The photo of great moment  DSC_2478.JPG 
  43   Tue Jul 19 04:34:57 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Photos of the electronicsRacks, crates, rear part of the preamps and
matrix with all tubes.
 9x 
  44   Tue Jul 19 11:54:03 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Photos of the AIDA insertion hole with the 3He tubesRIKEN tubes on the AIDA side with the SHV
right angle connector will protrude
by ~95mm in the HYBRID configuration (with
 DSC_2520.JPGDSC_2517.JPGDSC_2515.JPG 
  63   Thu Oct 6 02:03:32 2016 JL TainSTARTWe started the assembly of BRIKEN and AIDA
detectors in their final position
on Tuesday October 4:
 6x 
  342   Sun Oct 22 10:26:44 2017 JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KRFirst Wasabi-YSO-BRIKEN correlation test60Co source between YSO and Wasabi in front
of D4 Clover
Briken configuration file: 171022_1811_Conf_BrikenFullYSO.xlsx
 171022_1846_Conf_BrikenFullYSO.xlsx171022_1846_60Co_WasabiBrikenYSO.png 
  343   Sun Oct 22 11:14:35 2017 JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR252Cf source Wasabi-BrikenYSO252Cf source in the middle of Wasabi and YSO
in front of Clover D4
  
  336   Sat Oct 21 17:05:21 2017 JA,ATD, JLTNew DACQ hardware configurationConfiguration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel
 TubeAncillaryDACQDistribution-October2017.xlsx 
  344   Sun Oct 22 11:32:59 2017 JA,ATD, JLTNew Gasific Configuration file   171022_1846_Conf_BrikenFullYSO.xlsx 
  314   Sat May 27 10:36:20 2017 JA,AT,JLTBRIKEN DACQManuals for BRIKEN DACQ: 
GasificShort.pdf including "Run protocol"
and Gasific70Manual.pdf (long)
 Gasific70Manual.pdfGasificShort.pdf 
  237   Thu Mar 30 20:13:11 2017 JA, GK, DK40Mg run25Date: 31/03/2017
Start: 04:13
BRIKEN run: 25
  
  398   Fri Oct 26 15:15:55 2018 JA, ATS, ATD, JLT, AABackground measurements
No pulser (inhibit in clock)
DLT: 181026_2244_Bkg_NoPulser_114.dlt
  
  337   Sat Oct 21 17:11:03 2017 JA, ATD, JLTNew Gasific configuration fileConfiguration file saved on 22-Oct-2017 at
00:59
after increasing all the threshold in all
 171022_Conf_BrikenFullYSO.xlsx 
  338   Sat Oct 21 17:14:55 2017 JA, ATD, JLT252Cf efficiency calibrationMeasurement of BRIKEN neutron counter efficiency
252Cf source in the (approximately) center
Wasabi and D4 clover inserted. G7 on the
 Screenshot_from_2017-10-22_01-21-51.png 
  339   Sat Oct 21 17:30:23 2017 JA, ATD, JLTBackground measurement overnight22/10/2017
Start: 01:26
Run: 037
 Screenshot_from_2017-10-22_11-26-49.pngScreenshot_from_2017-10-22_11-26-10.pngScreenshot_from_2017-10-22_11-26-28.png 
  279   Sat Apr 1 13:15:37 2017 JA ID OH PVNa37 Ne36 Run 064Date: 1/04/2017 
Start:21:13
BRIKEN run: 63 
  
  238   Thu Mar 30 21:01:54 2017 JA DK KG LiuRun 27Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
  
  225   Thu Mar 30 06:30:06 2017 JA CG PV SNRun 13Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
  
  320   Mon Jun 12 02:38:27 2017 JA AA AIM AT ATVME crate & new configurationSun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
 170603_Conf_BrikenFull.xlsx 
  48   Wed Jul 20 11:40:00 2016 J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ...252CfFirst measurement with full 140 tube version

of the BRIKEN neutron detector
 RIKEN-252Cf-V1A1.pngUPC-252Cf-V1A3.pngORNL1-252Cf-V1A5.pngORNL2-252Cf-V1A6.png 
  49   Wed Jul 20 11:49:00 2016 J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ...Background18/07/2016 
First background measurement overnight.
 160718_FullBrikenFirstData_bkg.zip 
ELOG V3.1.3-7933898