Wed Mar 29 18:16:58 2017, RCF, 40Mg Run 002
|
Date: 30/03/2017
|
Wed Mar 29 17:15:21 2017, JLT, New Config file
|
New configuration file:
170330_Conf_BrikenFull.xlsx
|
Wed Mar 29 15:16:17 2017, Many, 40Mg Run 001
|
Date: 29/03/2017
Start: 23:13
|
Wed Mar 29 14:14:58 2017, Many, 40Mg RUN 000
|
Date: 29/03/2017
Start: 22:13
|
Wed Mar 29 13:31:37 2017, J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL Tain, Start of parasitic
|
Start of parasitic Ca beam
(main experiment "New isotope search", Ahn et al.)
|
Wed Mar 29 11:02:40 2017, PV, Liu, JA, JLT, F11 plastic
|
New calibration of F11 plastic
We decided to have both a low gain and a high gain
|
Wed Mar 29 07:34:16 2017, J. Agramunt, BrikenTools repository installed at d05
|
The last version of Briken tools repository has ben installed at d05, this repository includes the Merger and the BrikenOffline codes, as well as a CommonTools
folder to share scripts and code.
For update versions, just type in the desired directory "svn update". |
Wed Mar 29 03:02:02 2017, J. Agramunt, Synchronization test procedure (update)
|
To Launch the processes:
Open 4 terminals:
|
Tue Mar 28 17:02:19 2017, DK, Applying Biases
|
Today, Gabor and I discussed with Nathan from ORNL about the biasing system used for Ge, 3He, Plastic, and others. Phong is also a bit familiar with the
system (edit also
Shintaro
|
Tue Mar 28 09:10:09 2017, Many, 152Eu 
|
152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration with 60Co source.
|
Tue Mar 28 06:56:15 2017, PV, Liu, JA, JLT, F11 Plastic  
|
Calibration of new F11 plastic
(see photo)
|
Mon Mar 27 11:53:15 2017, PV,Liu, Turn on dE detector   
|
We applied a bias voltage of 100 V to the dE detector
Current read = 0.660 uA
compare with https://elog.ph.ed.ac.uk/BRIKEN/190. it is slighly lower. |
Mon Mar 27 09:32:55 2017, JLT JA CG OH DK TD RC VP GK LJ SN, 252Cf  
|
252Cf at the center for BRIKEN calibration
|
Mon Mar 27 03:50:13 2017, JLT JA CG OH DK TD RC VP SN, Background
|
Background measurement while they play with the beam.
Start: 11:40
|
Sat Mar 25 13:42:23 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero, Background
|
BRIKEN system powered and DACQ started after movement.
All looks fine.
|
Sat Mar 25 13:33:12 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero, BRIKEN+AIDA relocated 
|
We moved AIDA+BRIKEN by 107cm upstream.
See attached photos.
|
Fri Mar 24 03:28:39 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Background
|
Background measurement overnight
Start: 19:45
|
Thu Mar 23 10:03:51 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, 252Cf
|
252Cf source at the center for calibration
23/03/2017
|
Thu Mar 23 09:30:58 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Power-up and 1st spectrum
|
Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
|
Thu Mar 23 09:04:38 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Remove EURICA rails  
|
We remove partially the floor rails of EURICA
to proof that it is possible to move BRIKEN + AIDA.
|