|
ID |
Date |
Author |
Subject |
Text |
 |
|
113
|
Sat Nov 5 03:36:34 2016 |
Tain et al | Ancillary detectors | Some info on ancillary detector signals
Plastic veto detectors (Top and Botomm):
|
  |
|
112
|
Sat Nov 5 03:18:13 2016 |
SG BCR RCF NTB | Gamma peaks in the overnight run, related to neutron inelastic scattering | We looked at the overnight background run
(161105_0935_BackgroundOvernight.root), There
are gamma-peaks that could be related |
 |
|
111
|
Sat Nov 5 01:26:46 2016 |
Jose,Iris,Alvaro, Alejandro, Krzysztof | Background measurement | Measurement overnight
Start: around 1:00
|
7x |
|
110
|
Sat Nov 5 01:25:24 2016 |
Tain et al | End of Beam Line Setup | Some photos of the elements in the last part
of the beam line
during Takechi run.
|
9x |
|
109
|
Fri Nov 4 13:16:42 2016 |
JLTain,ATolosa,JAgramunt | Neutron Background | Beam tuning in BigRIPS
At 19:00 access to Exp. Area was closed and |
   |
|
108
|
Fri Nov 4 03:37:27 2016 |
Roger Caballero | Energy calibration for Ge clovers | Energy Calibration: See attached pdf
Detector Slope Offset
|
|
|
107
|
Thu Nov 3 23:28:01 2016 |
A. Tolosa | BRIKEN Bkg + 152Eu | Measurement over night with a 152Eu source
inside
|
 |
|
106
|
Thu Nov 3 15:09:52 2016 |
A. Tarifeno-Saldivia, C. Domingo-Pardo, J.L. Tain | BRIKEN neutron efficiency | Geant4 BRIKEN Neutron efficiency calculations
as a function of neutron energy and for some
spectra: Ga84-vandle, Br88-endf71, Rb94-endf71, |
  |
|
105
|
Thu Nov 3 14:02:49 2016 |
Nepal, J Ha, PV, Liu J | The degrader system has been set | We used the laser to align the degrader
(see attached photos)
According to the LISE calculation, |
 |
|
104
|
Thu Nov 3 05:46:48 2016 |
Iris, Ale | Background measurement | Background measurement for threshold determination
|
|
|
103
|
Thu Nov 3 05:27:48 2016 |
Alvaro, Tain, Gabor, Ale | 152Eu | Energy calibration for clovers, 152Eu
|
|
|
102
|
Thu Nov 3 04:46:24 2016 |
Alvaro Tolosa | 252Cf | Check of BRIKEN calibration and thresholds
Source more or less at the center
|
|
|
101
|
Thu Nov 3 04:40:02 2016 |
All | START | Start of commissioning preparation
|
|
|
100
|
Wed Nov 2 02:26:22 2016 |
Roger Caballero | Efficiency callibration calculator (Excel file) | Attached the updated excel file. In the first
sheet there is the calculator to calculate
the efficiency from an given energy.
|
|
|
99
|
Wed Nov 2 01:19:46 2016 |
Roger Caballero | Eff callibration parameters for D4-Clover | Efficiency calibration for the D4 clover (data
acquired in October).
The attached plots show the parameters for |
   |
|
97
|
Tue Nov 1 13:00:55 2016 |
Roger Caballero | Eff callibration parameters for G7-Clover | Efficiency calibration for the G7 clover (data
acquired in July).
The attached plots show the parameters for |
   |
|
96
|
Tue Nov 1 09:27:02 2016 |
Alvaro Tolosa | CLOVER | Efficiency calibration
File "cloversEff.ods" and "cloversEff.xls" |
 |
|
95
|
Mon Oct 31 23:56:37 2016 |
J. Agramunt | First AIDA BRIKEN correlation plot | From the 252Cf data. |
|
|
94
|
Tue Oct 18 09:41:43 2016 |
Alvaro Tolosa | 2016 - July, Logbook | Paper logbook for July-2016
For correct visualization,
please download it. |
|
|
93
|
Tue Oct 18 09:36:07 2016 |
Alvaro Tolosa | 2016-Oct, Logbook | Paper logbook for October-2016
For correct visualization,
please download it. |
|