AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 17 of 21  ELOG logo
  ID Date Author Subject Text Attachments
  92   Mon Oct 17 05:21:46 2016 Phong, Liu J JdE detector position and output signal from preamplifierdE detector is mounted onto the back side
of the shielding (attached photo: dE_position.JPG)
 137CsTest_ac.JPGdE_position.JPGdc.JPG 
  91   Sun Oct 16 13:30:43 2016 AllEND... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO
 Sashimi.jpg 
  90   Sun Oct 16 12:58:34 2016 AllBRIKENInstallation of BRIKEN PE shielding for beam
related neutrons
 Shielding-BRIKEN-AIDA.jpgShielding-BRIKEN.jpgShieldingPlates.jpg 
  89   Fri Oct 14 14:06:38 2016 AllFirst measurement of BRIKEN and AIDAFriday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common
clock.
 161014Conf_BrikenFull.xlsx 
  88   Fri Oct 14 13:32:52 2016 NT BREWER, S Go, JM AllmondGe preamp power loss and solution. As previously recorded (81), on Thur Oct
13th, A NIM crate failure caused preamp power
loss to the HPGe's. While D4 recovered
  
  87   Fri Oct 14 04:42:40 2016 JL Tain et alElectronicsChange of main power line for MPOD and CLOVER
preamp
 D4All-CsCo-zoom-newlineCL.pdfBRIKEN-newlineCL.pdf 
  86   Fri Oct 14 04:12:50 2016 JL Tain et alCONFNew configuration file: 
161014Conf_BrikenFull.xlsx
  
  85   Thu Oct 13 23:42:27 2016 JL Tain et alBackgroundBackground measurement overnight

Start: 01:17
 Bckg-161014.pdf 
  84   Thu Oct 13 23:41:25 2016 JL Tain et al252CfNew BRIKEN energy calibration

 252Cf-161014.pdf 
  83   Thu Oct 13 23:39:58 2016 JL Tain et alVETO DetEnergy calibration of plastic and NaI detectors

 Plast-Cs.pdfNaI-Cs.pdfPlast-Co.pdfNaI-Co.pdfVETO-testarrangement.jpg 
  82   Thu Oct 13 23:38:26 2016 JL Tain et alCLOVEREnergy and efficiency calibration

We make calibrations for the remaining D4
 D4All-CsCo.pdfD4All-CsCo-zoom.pdfD4Sum-152Eu.pdf 
  81   Thu Oct 13 12:58:31 2016 JL Tain et alINCIDENTNIM Crate Failure. Lost of CLOVER G7

One of the 2 NIM crates, the one containing
  
  80   Thu Oct 13 04:36:58 2016 JL Tain et alCLOVERCLOVER energy calibration

Short run with 137Cs and 60Co sources at
 161013_1518_137Cs60Co.root 
  79   Wed Oct 12 11:30:53 2016 Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et alBRIKEN Z scanScanning of the BRIKEN detector with the 252Cf
source 
along the longitudinal axis (Z axis)
  
  78   Wed Oct 12 05:06:57 2016 JL Tain et alNoiseGamma source close to ORNL2 tube

In order to investigate the origin of the
 He136-nosource.pdfHe136-137Cs.pdf 
  77   Wed Oct 12 03:47:14 2016 JL Tain et alBackgroundBackground measurement over night with CLOVER
and VETO detectors
  
  76   Tue Oct 11 17:11:28 2016 A. Tarifeno-Saldivia et al...ROOT macro ROOT macro for calculation of neutron rates
in the BRIKEN detector
 BRIKEN_rates_v3.cc 
  75   Tue Oct 11 15:58:01 2016 JL Tain et alVETO DetCheck of Plastic and NaI veto detectors and
DACQ settings
 IMG_20161012_124010.jpgPlastic-137Cs.pdfNaI-137Cs.pdf 
  74   Tue Oct 11 15:47:45 2016 N Brewer, S Go et alCLOVERBoth COVER detectors are installed in place.
See photos.
 IMG_20161011_182318.jpgIMG_20161011_182258.jpgD4-1st.pdfG7-1st.pdf 
  73   Sun Oct 9 18:19:01 2016 JL Tain et alNoiseOptimization of ADC thresholds

In order to try to reduce the grass-like
 161007_1045_bck_lin.pdf161010_0712_bck_newthr.pdf 
ELOG V3.1.4-unknown