Sun Oct 21 08:58:23 2018, AT & AT, background, high threshold, NO pulser
|
18/10/21 START: 16:58
18/10/21 STOP: 19:09
Background measurements. Checking noise!
|
Sun Oct 21 03:19:54 2018, AT & AT, background, high threshold
|
18/10/20 START: 20:30 approx
18/10/21 STOP: 11:20
|
Sun Oct 21 06:04:43 2018, AT & AT, background, high threshold
|
18/10/21 START: 14:10
18/10/21 STOP: 16:41
Background measurements. Checking noise!
|
Fri Oct 19 00:28:48 2018, AT2, JLT, SN, background measurement, no clovers 
|
18/10/19 START: 08:31
18/10/19 STOP: 10:50
|
Fri Jul 29 09:52:28 2016, Keishi Matsui, accuracy of Cf-252's intensity in RIKEN
|
According to the reply from Japan Radioisotope Association, the accuracy of the Cf-252's intensity is +0%/-15%.
( "+0%" is important, because 3.7 MBq is a standard limit for radio-active sources in Japan.) |
Fri Dec 1 07:29:47 2017, Vi Ho Phong, [Hardware][Configuration] Return the PB-5 Pulse generator (Pulser 2) and the 428F Linear Fan in-out modules and replace with a new Linear Fan in-out module 7x
|
The PB-5 Pulse generator labeled "Pulser 2" and the 428F Linear Fan in-out labeled "Clover G7" from BRIKEN NIM crate have to be returned to the RIBF electronics
pool because the
borrowing time is expired.
|
Tue Feb 24 09:34:54 2015, J. Agramunt, H. Baba, A. Estrade, [DAQ] DAQ correlation test   
|
We have performed a successful test of the integration of independent DAQ systems based on a correlation
scalar counted from a common clock signal. The principles of the integration method are described in the
|
Thu Jun 15 03:40:17 2017, BRIKEN collaboration, Z-scaning 252Cf Jun17
|
A scaning with 252Cf along the Z-axis of the neutron detector is carried out. The setup is similar to the scaning carried out in October 2016.
Observations:
- Clovers are put inside the detector without voltage. |
Thu Nov 16 02:32:23 2017, BRIKEN collaboration, YSO thresholds
|
YSO Tests
Thresholds & calibrations
|
Mon Jun 12 02:38:27 2017, JA AA AIM AT AT, VME crate & new configuration
|
Sun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
|
Tue Oct 11 15:58:01 2016, JL Tain et al, VETO Det  
|
Check of Plastic and NaI veto detectors and DACQ settings
|
Thu Oct 13 23:39:58 2016, JL Tain et al, VETO Det    
|
Energy calibration of plastic and NaI detectors
|
Wed Feb 25 07:38:42 2015, A. Estrade J. Agramunt , Usage of synchronization test programs 
|
In order to access to the synchronization test, we prepare two programs in the PC briken1 ( 10.32.6.54).
To Launch the processes, in a terminal type: DataSink -i 3
In other terminal type SynCheck |
Mon Mar 27 11:53:15 2017, PV,Liu, Turn on dE detector   
|
We applied a bias voltage of 100 V to the dE detector
Current read = 0.660 uA
compare with https://elog.ph.ed.ac.uk/BRIKEN/190. it is slighly lower. |
Thu Nov 3 14:02:49 2016, Nepal, J Ha, PV, Liu J, The degrader system has been set 
|
We used the laser to align the degrader (see attached photos)
According to the LISE calculation, equivalent effective thickness for 6 mm of Carbon target is 4.5 mm thick Aluminum.
Therefore, we've set the degrader system as follow: |
Mon Jun 12 22:28:02 2017, Oscar, The SUSHIRO app guide
|
It's here...it's rough...but it hopefully gets the job done |
Tue May 5 02:19:58 2015, j.Agramunt J.L.Tain K.Gabor , The Lower polyethylene pieces was swamped
|
The Lower polyethylene pieces was swamped.
In the photo beam comes from the left.
|
Fri Oct 26 03:31:33 2018, AT2 & JA, Test pulser effect on baseline 6x
|
We have tested possible change of the baseline in the digitizer due to the pulser connection. NO EFFECT has been
found!
|
Wed Mar 29 03:02:02 2017, J. Agramunt, Synchronization test procedure (update)
|
To Launch the processes:
Open 4 terminals:
|
Fri May 26 09:07:46 2017, J. Agramunt, Synchronization Monitoring 
|
We started the synchronization monitoring programs to check that
it is OK as can be seen in the figure below
|