AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 2 of 21  ELOG logo
Entry  Sun Oct 21 08:58:23 2018, AT & AT, background, high threshold, NO pulser 
18/10/21 START: 16:58
18/10/21 STOP: 19:09
Background measurements. Checking noise!
Entry  Sun Oct 21 03:19:54 2018, AT & AT, background, high threshold 

18/10/20 START: 20:30 approx 
18/10/21 STOP: 11:20
Entry  Sun Oct 21 06:04:43 2018, AT & AT, background, high threshold 181021_1410_bckgn_pulser_highThr.png
18/10/21 START: 14:10
18/10/21 STOP: 16:41
Background measurements. Checking noise!
Entry  Fri Oct 19 00:28:48 2018, AT2, JLT, SN, background measurement, no clovers Screenshot_from_2018-10-19_10-47-54.pngScreenshot_from_2018-10-19_10-55-30.png

18/10/19 START: 08:31
18/10/19 STOP: 10:50
Entry  Fri Jul 29 09:52:28 2016, Keishi Matsui, accuracy of Cf-252's intensity in RIKEN IMG_9350.JPG
 According to the reply from Japan Radioisotope Association, the accuracy of the Cf-252's intensity is +0%/-15%.
( "+0%" is important, because 3.7 MBq is a standard limit for radio-active sources  in Japan.)
Entry  Fri Dec 1 07:29:47 2017, Vi Ho Phong, [Hardware][Configuration] Return the PB-5 Pulse generator (Pulser 2) and the 428F Linear Fan in-out modules and replace with a new Linear Fan in-out module  7x
The PB-5 Pulse generator labeled "Pulser 2" and the 428F Linear Fan in-out labeled "Clover G7" from BRIKEN NIM crate have to be returned to the RIBF electronics
pool because the 
borrowing time is expired.
Entry  Tue Feb 24 09:34:54 2015, J. Agramunt, H. Baba, A. Estrade, [DAQ] DAQ correlation test  DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png

We have performed a successful test of the integration of independent DAQ systems based on a correlation 
scalar counted from a common clock signal. The principles of the integration method are described in the 
Entry  Thu Jun 15 03:40:17 2017, BRIKEN collaboration, Z-scaning 252Cf Jun17 WhatsApp_Image_2017-06-15_at_18.11.52.jpeg
A scaning with 252Cf along the Z-axis of the neutron detector is carried out. The setup is similar to the scaning carried out in October 2016.

Observations:

- Clovers are put inside the detector without voltage.
Entry  Thu Nov 16 02:32:23 2017, BRIKEN collaboration, YSO thresholds dynVSdynGated.png
YSO Tests 
Thresholds & calibrations
Entry  Mon Jun 12 02:38:27 2017, JA AA AIM AT AT, VME crate & new configuration 170603_Conf_BrikenFull.xlsx
Sun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
Entry  Tue Oct 11 15:58:01 2016, JL Tain et al, VETO Det IMG_20161012_124010.jpgPlastic-137Cs.pdfNaI-137Cs.pdf
Check of Plastic and NaI veto detectors and DACQ settings

Entry  Thu Oct 13 23:39:58 2016, JL Tain et al, VETO Det Plast-Cs.pdfNaI-Cs.pdfPlast-Co.pdfNaI-Co.pdfVETO-testarrangement.jpg
Energy calibration of plastic and NaI detectors

Entry  Wed Feb 25 07:38:42 2015, A. Estrade J. Agramunt , Usage of synchronization test programs 15.pngDataRelayFilter_terminal.png
In order to access to the synchronization test, we prepare two programs in the PC  briken1 ( 10.32.6.54).
To Launch the processes, in a terminal type: DataSink -i 3
In other terminal type SynCheck
Entry  Mon Mar 27 11:53:15 2017, PV,Liu, Turn on dE detector 1_top_60co.png2_top_noiselvl.png3_bottom_60co.png4_bottom_noiselvl.png
We applied a bias voltage of 100 V to the dE detector

Current read = 0.660 uA

compare with https://elog.ph.ed.ac.uk/BRIKEN/190.  it is slighly lower.
Entry  Thu Nov 3 14:02:49 2016, Nepal, J Ha, PV, Liu J, The degrader system has been set IMG_1318.JPGIMG_1317.JPG
We used the laser to align the degrader (see attached photos)

According to the LISE calculation, equivalent effective thickness for 6 mm of Carbon target is 4.5 mm thick Aluminum.

Therefore, we've set the degrader system as follow:
Entry  Mon Jun 12 22:28:02 2017, Oscar, The SUSHIRO app guide SUSHIRO_For_Dummies_V001.pdf
It's here...it's rough...but it hopefully gets the job done
Entry  Tue May 5 02:19:58 2015, j.Agramunt J.L.Tain K.Gabor , The Lower polyethylene pieces was swamped photo-4.JPG
The Lower polyethylene pieces was swamped.
In the photo beam comes from the left.
 
Entry  Fri Oct 26 03:31:33 2018, AT2 & JA, Test pulser effect on baseline 6x
We have tested possible change of the baseline in the digitizer due to the pulser connection. NO EFFECT has been
found!
Entry  Wed Mar 29 03:02:02 2017, J. Agramunt, Synchronization test procedure (update)  
To Launch the processes:

Open 4 terminals:
Entry  Fri May 26 09:07:46 2017, J. Agramunt, Synchronization Monitoring synchroCheck.pngSynchronizationMonitoring.pdf
We started the synchronization monitoring programs to check that
it is OK as can be seen in the figure below
ELOG V3.1.4-unknown