AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 2 of 21  ELOG logo
ID Date Authordown Subject Text Attachments
  136   Tue Nov 8 06:39:25 2016 Tain. IrisDrawing of present setup

Attached is the present setup including all
 Full_BRIKEN_Setup-includingTakechi.pdf 
  115   Sat Nov 5 16:27:13 2016 Tain,Ale,Jorge,Alvaro62Ni beam in F11 empty targetEmpty position of the target ladder at F11
(hole is smaller than beam size)
  
  116   Sat Nov 5 17:07:27 2016 Tain, Alvaro, Jorge62Ni in F762Ni beam in F7 ON CH2 target

Strat with C target ladder in F11 in empty
 161106_0232_62Ni_F7_empty_Rates.pdf161106_0232_62Ni_F7_empty_F11.pdf161106_0232_62Ni_F7_empty_CorrBRF11R.pdf161106_0232_62Ni_F7_empty_VPL.pdf161106_0232_62Ni_F7_empty_CorrBRVPL.pdf 
  140   Tue Nov 8 12:30:33 2016 Tain, Ale (who are not on shift)71,72,73Ni run71,72,73Ni  run

We started at approximately 21:00, only online,
  
  114   Sat Nov 5 15:07:11 2016 Tain, Ale62Ni beam on F11 C-6mm62Ni on 6 mm C target between MUSICs

The background before was 0.36 neutrons/s
 161106_0117_62Ni_F11_C6mm_Rates.pdf161106_0117_62Ni_F11_C6mm_F11.pdf161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf161106_0117_62Ni_F11_C6mm_VPL.pdf161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf 
  124   Mon Nov 7 04:49:57 2016 Tain, AleAIDA plastic (veto) and Si de calibrationAIDA plastic (veto) and Si de calibration

For the calibration the Compton edge of the
  
  118   Sun Nov 6 06:27:49 2016 Tain et al.58Ni on F11 C-6mm inNew calibration in V_PL_T and V_PL_R (Energyx1/2)

Start: 15:15
  
  119   Sun Nov 6 06:39:23 2016 Tain et al.58Ni on F11 C-6mm58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to
 161106_1609_58Ni_F11_empty_Rates.pdf 
  120   Sun Nov 6 07:16:59 2016 Tain et al.58Ni on F7 CH2 F11 empty/C6mmCH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
 161106_1725_58Ni_F7CH2_Rates.pdf161106_1725_58Ni_F7CH2_RatesRings.pdf 
  121   Sun Nov 6 23:35:42 2016 Tain et al.Overnight measurement: Ca isotopesFirst 50,49,48Ca beam and then 47,46,45Ca
beam
C-6mm IN and OUT
 161107_0833_Overnight_Rates.pdf161107_0833_Overnight_F11.pdf161107_0833_Overnight_CorrBRF11R.pdf 
  110   Sat Nov 5 01:25:24 2016 Tain et alEnd of Beam Line SetupSome photos of the elements in the last part
of the beam line
during Takechi run.
 9x 
  113   Sat Nov 5 03:36:34 2016 Tain et alAncillary detectorsSome info on ancillary detector signals

Plastic veto detectors (Top and Botomm):
 VetoBottomPlastic.JPGVetoTopPlastic.JPGAIDAPlasticShaped.JPG 
  137   Tue Nov 8 08:31:52 2016 Tain et al424344Ca runSequence of settings:
1) No target at F7 and Empty target at F11
(up to t=1E6ms)
  
  138   Tue Nov 8 08:49:51 2016 Tain et alMove ELOGWe will start to use the internal RIKEN ELOG
It is not clear that we can keep the present
ELOG also updated
  
  135   Tue Nov 8 06:13:11 2016 Tain et alNew plastic detector in F11There is a new plastic scintillator
after the MUSIC chambers
 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg 
  350   Wed Oct 25 18:12:43 2017 Sunflower collaborationGamma sources web pagehttp://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html   
  17   Mon May 4 03:20:00 2015 Shunji NishimuraRNC New RuleWe have some new rule about the data taken
at RNC from this year. 
Shunji
 kanri_e.pdf 
  38   Mon Jul 18 09:32:50 2016 Shintaro GoHV controlsYou can start applying HVs on the detectors
using macro on the control-computer.
If you have already signed in the
  
  233   Thu Mar 30 16:15:24 2017 SN, JLT, GK, DK, JLiu40Mg run 21Date: 31/03/2017
Start: 00:12
BRIKEN run: 21
  
  226   Thu Mar 30 07:31:09 2017 SN PV CG RCF JARun 14Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
  
ELOG V3.1.4-unknown