AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 2 of 21  ELOG logo
ID Date Authorup Subject Text Attachments
  160   Fri Nov 25 03:15:46 2016 AT Background Beam ON16/11/24 19h38min:  
Background measurement during tunning of
BigRips from 27-29F to 22C is started.
  
  161   Fri Nov 25 03:37:23 2016 ATBackground Beam OFF/ON16/11/24 21h06min: Background measurement
Beam OFF + Beam ON tunning and 22C
 161124_2106_013_BRIKEN.svg161124_2106_013_Rings.svg161124_2106_013_RateBRIKEN.svg 
  162   Fri Nov 25 03:41:40 2016 ATRun setupsRun setups during preparation of Fallon Parasitic
experiments (Kanungo experiment beam time)
can be found on 
 RUNsum_kanagoda.pdf 
  163   Fri Nov 25 03:49:44 2016 ATBackground Beam ON16/11/25 12h28min: Background measurement
beam ON 19B
  
  164   Fri Nov 25 21:47:05 2016 ATBackground Beam OFF16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after
 161125_1617_017_BRIKEN.svg161125_1617_017_RateBRIKEN.svg 
  165   Fri Nov 25 21:48:49 2016 ATDACQ19:00  Test calibration    
  166   Fri Nov 25 21:49:36 2016 ATBackground Beam OFF21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
  
  167   Fri Nov 25 21:50:42 2016 ATNew Conf File161125Conf_BrikenFull.xlsx   
  169   Sat Nov 26 00:04:15 2016 ATElogRIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
  
  170   Sat Nov 26 00:15:12 2016 AT41Al run008:15    BigRips tunning for centering 41Al.
Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
 161126_0815_000_RateBRIKEN.svg 
  171   Sat Nov 26 06:30:30 2016 ATSetupSetup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u
  
  172   Sat Nov 26 06:37:37 2016 AT41Al run 111:07  New acquisition is started for tungsten
degraders 
1mm W + 1mm Al
  
  356   Fri Nov 24 00:45:36 2017 ATur17b BRIKEN filesList of files in BRIKEN DAQ PC:

Experiment DA1702 (including the test with
  
  419   Thu Nov 22 07:01:36 2018 ATPID high mass seting (165Pm) - RIBF148PID plot for the high mass setting (165Pm),
run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification
 F7pid_RIBF148_165PmSetting_labels.png 
  175   Sat Nov 26 16:54:17 2016 AT & ATCloversCalibration of clovers   
  361   Wed Oct 17 09:20:20 2018 AT & AT252Cf long measure18/10/17 START: 18:16
18/10/17 STOP: 22:00
  
  362   Wed Oct 17 14:11:18 2018 AT & AT252Cf long measure, z=0cm, threshold 5% lower
18/10/17 START: 22:04
18/10/17 STOP: 08:18
  
  363   Thu Oct 18 00:31:55 2018 AT & AT252Cf long measure, z=0cm, threshold 5% lower18/10/18 START: 08:31
18/10/18 STOP: 10:50
  
  364   Thu Oct 18 03:11:56 2018 AT & ATbck meas18/10/18 START: 10:54
18/10/1X STOP: 14:02
  
  369   Fri Oct 19 04:02:36 2018 AT & AT252Cf, z=0cm, no clovers (***** CHECK DATA)
18/10/19 START: 12:05
18/10/19 STOP: 16:44
  
ELOG V3.1.4-unknown