ID |
Date |
Author |
Subject |
Text |
|
340
|
Sun Oct 22 05:15:26 2017 |
RG,RY,MS,ATD,JA,JLT | Check of YSO | We start a systematic check of YSO in BRIKEN
DACQ
|
12x |
347
|
Tue Oct 24 13:14:47 2017 |
RY | Calibration data for clovers | for energy calibration with 152Eu source
171024_1858_152Eu_G7.root
171024_2112_152Eu_D4.root |
|
3
|
Fri Oct 31 12:58:49 2014 |
Robert Grzywacz | Entry test - preamps | Here is a picture of one of our Mesytec preamplifiers.
We have located all seven of them.
They have 16 input channels and a common |
|
97
|
Tue Nov 1 13:00:55 2016 |
Roger Caballero | Eff callibration parameters for G7-Clover | Efficiency calibration for the G7 clover (data
acquired in July).
The attached plots show the parameters for |
|
99
|
Wed Nov 2 01:19:46 2016 |
Roger Caballero | Eff callibration parameters for D4-Clover | Efficiency calibration for the D4 clover (data
acquired in October).
The attached plots show the parameters for |
|
100
|
Wed Nov 2 02:26:22 2016 |
Roger Caballero | Efficiency callibration calculator (Excel file) | Attached the updated excel file. In the first
sheet there is the calculator to calculate
the efficiency from an given energy.
|
|
108
|
Fri Nov 4 03:37:27 2016 |
Roger Caballero | Energy calibration for Ge clovers | Energy Calibration: See attached pdf
Detector Slope Offset
|
|
52
|
Wed Jul 20 16:12:58 2016 |
S. Go, ... | CLOVER | Mounting of the CLOVER detectors in position
CLOVER G7: right of beam
|
|
53
|
Wed Jul 20 16:40:57 2016 |
S. Go, J.Agramunt, A.Tolosa, J.L. Tain,... | CLOVER | Calibration and resolution check
CLOVER detectors were calibrated in energy |
|
112
|
Sat Nov 5 03:18:13 2016 |
SG BCR RCF NTB | Gamma peaks in the overnight run, related to neutron inelastic scattering | We looked at the overnight background run
(161105_0935_BackgroundOvernight.root), There
are gamma-peaks that could be related |
|
353
|
Fri Oct 27 10:04:31 2017 |
SG, RY | LISE++ file for BRIKEN1 | Here attached the lise file for BRIKEN1 |
|
226
|
Thu Mar 30 07:31:09 2017 |
SN PV CG RCF JA | Run 14 | Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
|
|
233
|
Thu Mar 30 16:15:24 2017 |
SN, JLT, GK, DK, JLiu | 40Mg run 21 | Date: 31/03/2017
Start: 00:12
BRIKEN run: 21
|
|
38
|
Mon Jul 18 09:32:50 2016 |
Shintaro Go | HV controls | You can start applying HVs on the detectors
using macro on the control-computer.
If you have already signed in the |
|
17
|
Mon May 4 03:20:00 2015 |
Shunji Nishimura | RNC New Rule | We have some new rule about the data taken
at RNC from this year.
Shunji |
|
350
|
Wed Oct 25 18:12:43 2017 |
Sunflower collaboration | Gamma sources web page | http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html |
|
135
|
Tue Nov 8 06:13:11 2016 |
Tain et al | New plastic detector in F11 | There is a new plastic scintillator
after the MUSIC chambers
|
|
110
|
Sat Nov 5 01:25:24 2016 |
Tain et al | End of Beam Line Setup | Some photos of the elements in the last part
of the beam line
during Takechi run.
|
9x |
113
|
Sat Nov 5 03:36:34 2016 |
Tain et al | Ancillary detectors | Some info on ancillary detector signals
Plastic veto detectors (Top and Botomm):
|
|
137
|
Tue Nov 8 08:31:52 2016 |
Tain et al | 424344Ca run | Sequence of settings:
1) No target at F7 and Empty target at F11
(up to t=1E6ms)
|
|