AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 19 of 21  ELOG logo
ID Date Authorup Subject Text Attachments
  340   Sun Oct 22 05:15:26 2017 RG,RY,MS,ATD,JA,JLTCheck of YSOWe start a systematic check of YSO in BRIKEN
DACQ
 12x 
  347   Tue Oct 24 13:14:47 2017 RYCalibration data for cloversfor energy calibration with 152Eu source

171024_1858_152Eu_G7.root
171024_2112_152Eu_D4.root
 171024_1858_152Eu_G7.root171024_2112_152Eu_D4.root 
  3   Fri Oct 31 12:58:49 2014 Robert GrzywaczEntry test - preamps Here is a picture of one of our Mesytec preamplifiers.
We have  located all seven of them. 
They  have 16 input channels and a common
 24.png 
  97   Tue Nov 1 13:00:55 2016 Roger CaballeroEff callibration parameters for G7-CloverEfficiency calibration for the G7 clover (data
acquired in July).
The attached plots show the parameters for
 G7-Blue.pdfG7-Green.pdfG7-Red.pdfG7-Black.pdf 
  99   Wed Nov 2 01:19:46 2016 Roger CaballeroEff callibration parameters for D4-CloverEfficiency calibration for the D4 clover (data
acquired in October).
The attached plots show the parameters for
 D4-Black.pdfD4-Red.pdfD4-Green.pdfD4-Blue.pdf 
  100   Wed Nov 2 02:26:22 2016 Roger CaballeroEfficiency callibration calculator (Excel file)Attached the updated excel file. In the first
sheet there is the calculator to calculate
the efficiency from an given energy.
 cloversEff.xls 
  108   Fri Nov 4 03:37:27 2016 Roger CaballeroEnergy calibration for Ge cloversEnergy Calibration: See attached pdf

Detector Slope Offset
 20161104-HpGe-EnergyCal.pdf 
  52   Wed Jul 20 16:12:58 2016 S. Go, ...CLOVERMounting of the CLOVER detectors in position

CLOVER G7: right of beam
 DSC_2522.JPGDSC_2523.JPGDSC_2524.JPG 
  53   Wed Jul 20 16:40:57 2016 S. Go, J.Agramunt, A.Tolosa, J.L. Tain,...CLOVERCalibration and resolution check

CLOVER detectors were calibrated in energy
 152Eu.png 
  112   Sat Nov 5 03:18:13 2016 SG BCR RCF NTBGamma peaks in the overnight run, related to neutron inelastic scatteringWe looked at the overnight background run
(161105_0935_BackgroundOvernight.root), There
are gamma-peaks that could be related
 08.png06.png 
  353   Fri Oct 27 10:04:31 2017 SG, RYLISE++ file for BRIKEN1Here attached the lise file for BRIKEN1  Cu82_Be5mm_Brho7.7000Tm_F1deg8mm_F5deg8mm_F7_D80mod_F11nuclei.png 
  226   Thu Mar 30 07:31:09 2017 SN PV CG RCF JARun 14Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
  
  233   Thu Mar 30 16:15:24 2017 SN, JLT, GK, DK, JLiu40Mg run 21Date: 31/03/2017
Start: 00:12
BRIKEN run: 21
  
  38   Mon Jul 18 09:32:50 2016 Shintaro GoHV controlsYou can start applying HVs on the detectors
using macro on the control-computer.
If you have already signed in the
  
  17   Mon May 4 03:20:00 2015 Shunji NishimuraRNC New RuleWe have some new rule about the data taken
at RNC from this year. 
Shunji
 kanri_e.pdf 
  350   Wed Oct 25 18:12:43 2017 Sunflower collaborationGamma sources web pagehttp://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html   
  135   Tue Nov 8 06:13:11 2016 Tain et alNew plastic detector in F11There is a new plastic scintillator
after the MUSIC chambers
 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg 
  110   Sat Nov 5 01:25:24 2016 Tain et alEnd of Beam Line SetupSome photos of the elements in the last part
of the beam line
during Takechi run.
 9x 
  113   Sat Nov 5 03:36:34 2016 Tain et alAncillary detectorsSome info on ancillary detector signals

Plastic veto detectors (Top and Botomm):
 VetoBottomPlastic.JPGVetoTopPlastic.JPGAIDAPlasticShaped.JPG 
  137   Tue Nov 8 08:31:52 2016 Tain et al424344Ca runSequence of settings:
1) No target at F7 and Empty target at F11
(up to t=1E6ms)
  
ELOG V3.1.4-unknown