  ID Date Author Subjectdown Text Attachments
  376   Sun Oct 21 08:58:23 2018 AT & ATbackground, high threshold, NO pulser18/10/21 START: 16:58
18/10/21 STOP: 19:09
Background measurements. Checking noise!
  
  374   Sun Oct 21 03:19:54 2018 AT & ATbackground, high threshold
18/10/20 START: 20:30 approx 
18/10/21 STOP: 11:20
  
  375   Sun Oct 21 06:04:43 2018 AT & ATbackground, high threshold18/10/21 START: 14:10
18/10/21 STOP: 16:41
Background measurements. Checking noise!
 181021_1410_bckgn_pulser_highThr.png 
  368   Fri Oct 19 00:28:48 2018 AT2, JLT, SNbackground measurement, no clovers
18/10/19 START: 08:31
18/10/19 STOP: 10:50
 Screenshot_from_2018-10-19_10-47-54.pngScreenshot_from_2018-10-19_10-55-30.png 
  60   Fri Jul 29 09:52:28 2016 Keishi Matsuiaccuracy of Cf-252's intensity in RIKEN According to the reply from Japan
Radioisotope Association, the accuracy of
the Cf-252's intensity is +0%/-15%.
 IMG_9350.JPG 
  357   Fri Dec 1 07:29:47 2017 Vi Ho Phong[Hardware][Configuration] Return the PB-5 Pulse generator (Pulser 2) and the 428F Linear Fan in-out modules and replace with a new Linear Fan in-out module The PB-5 Pulse generator labeled "Pulser 2"
and the 428F Linear Fan in-out labeled "Clover
G7" from BRIKEN NIM crate have to be returned
 7x 
  5   Tue Feb 24 09:34:54 2015 J. Agramunt, H. Baba, A. Estrade[DAQ] DAQ correlation test
We have performed a successful test of the
integration of independent DAQ systems based
 DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png 
  328   Thu Jun 15 03:40:17 2017 BRIKEN collaborationZ-scaning 252Cf Jun17A scaning with 252Cf along the Z-axis of
the neutron detector is carried out. The
setup is similar to the scaning carried out
 WhatsApp_Image_2017-06-15_at_18.11.52.jpeg 
  355   Thu Nov 16 02:32:23 2017 BRIKEN collaborationYSO thresholdsYSO Tests 
Thresholds & calibrations
 dynVSdynGated.png 
  320   Mon Jun 12 02:38:27 2017 JA AA AIM AT ATVME crate & new configurationSun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
 170603_Conf_BrikenFull.xlsx 
  75   Tue Oct 11 15:58:01 2016 JL Tain et alVETO DetCheck of Plastic and NaI veto detectors and
DACQ settings
 IMG_20161012_124010.jpgPlastic-137Cs.pdfNaI-137Cs.pdf 
  83   Thu Oct 13 23:39:58 2016 JL Tain et alVETO DetEnergy calibration of plastic and NaI detectors

 Plast-Cs.pdfNaI-Cs.pdfPlast-Co.pdfNaI-Co.pdfVETO-testarrangement.jpg 
  6   Wed Feb 25 07:38:42 2015 A. Estrade J. Agramunt Usage of synchronization test programsIn order to access to the synchronization
test, we prepare two programs in the PC 
briken1 ( 10.32.6.54).
 15.pngDataRelayFilter_terminal.png 
  203   Mon Mar 27 11:53:15 2017 PV,LiuTurn on dE detectorWe applied a bias voltage of 100 V to the
dE detector

Current read = 0.660 uA
 1_top_60co.png2_top_noiselvl.png3_bottom_60co.png4_bottom_noiselvl.png 
  105   Thu Nov 3 14:02:49 2016 Nepal, J Ha, PV, Liu JThe degrader system has been setWe used the laser to align the degrader
(see attached photos)

According to the LISE calculation,
 IMG_1318.JPGIMG_1317.JPG 
  322   Mon Jun 12 22:28:02 2017 OscarThe SUSHIRO app guideIt's here...it's rough...but it hopefully
gets the job done
 SUSHIRO_For_Dummies_V001.pdf 
  20   Tue May 5 02:19:58 2015 j.Agramunt J.L.Tain K.Gabor The Lower polyethylene pieces was swampedThe Lower polyethylene pieces was swamped.
In the photo beam comes from the
left.
 photo-4.JPG 
  396   Fri Oct 26 03:31:33 2018 AT2 & JATest pulser effect on baselineWe have tested possible change of the baseline
in the digitizer due to the pulser connection.
NO EFFECT has been
 6x 
  207   Wed Mar 29 03:02:02 2017 J. AgramuntSynchronization test procedure (update) To Launch the processes:

Open 4 terminals:
  
  308   Fri May 26 09:07:46 2017 J. AgramuntSynchronization MonitoringWe started the synchronization monitoring
programs to check that
it is OK as can be seen in the figure below
 synchroCheck.pngSynchronizationMonitoring.pdf 