Entry  Wed Oct 24 16:11:32 2018, AT & AT, Low threshold, 252Cf, z=-25cm 
252Cf at z=-25cm,ie 25 cm downstream the beam, source axis parallel.
Low threshold.
Entry  Thu Oct 25 16:08:53 2018, ATS & JLT, Lead bricks 
Lead bricks in BRIKEN hole to protect AIDA
Entry  Tue Jul 19 04:09:32 2016, JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt , Last tube fit in the matrix!!! DSC_2478.JPG
The photo of great moment
Entry  Fri Oct 27 10:04:31 2017, SG, RY, LISE++ file for BRIKEN1 Cu82_Be5mm_Brho7.7000Tm_F1deg8mm_F5deg8mm_F7_D80mod_F11nuclei.png
Here attached the lise file for BRIKEN1
Entry  Thu Dec 8 04:17:49 2016, PV, Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer Screenshot_from_2016-12-08_13-30-16.png
All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:

https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing

To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro)
Entry  Thu Oct 13 12:58:31 2016, JL Tain et al, INCIDENT 
NIM Crate Failure. Lost of CLOVER G7

One of the 2 NIM crates, the one containing the power for CLOVER
Entry  Tue Jun 13 05:18:07 2017, PV, How to install ELOG for BRIKEN campaign 2017a  
Get ELOG software including entries for BRIKEN campaign 2017a from mars computer:

briken@mars:/data01/2017data/briken/ur17a/elogBRIKEN2017a.tar.gz
Entry  Thu Nov 10 05:05:54 2016, KM, How to convert ridf-file to root-file 
1. Login to briken@ribfana03.riken.jp

2. Check if the ridf-file you want to convert is in the directory; /home/briken16/rawdata/bigrips/

3. Login to anaroot; type "anarootlogin"
Entry  Sat Jul 9 21:00:54 2016, J.L. Tain, Hardware Hardware.xlsxHardware.pdf
A list of the available hardware
Entry  Wed Jun 14 06:22:21 2017, Ariel, Liu, Go, Nishinmura, HV is off 
To protect HPGe and 3He tubes from high intentsity primary beam, HV of these detector are off and the HPGe will be dismounted.
Entry  Mon Jul 18 09:32:50 2016, Shintaro Go, HV controls 
You can start applying HVs on the detectors using macro on the control-computer.
If you have already signed in the computer that controls mpod,
1. Type http://192.168.13.239/  to monitor the status of HV.
Entry  Mon Nov 7 06:55:01 2016, NTB, SG, HPGe Fill line to D4 replaced 
HPGe fill line to D4 replaced only small leak (overflow) once Ge is full.

Solenoid was also wrapped to no effect. AIDA DAQ still stops writing.

Boron sheet and extra polyethylene were placed back on top.
Entry  Fri Oct 14 13:32:52 2016, NT BREWER, S Go, JM Allmond, Ge preamp power loss and solution.  
As previously recorded (81), on Thur Oct 13th, A NIM crate failure caused preamp power loss to the HPGe's. While D4 recovered with nominally the
same resolution as before. G7 would not recieve power to the preamps without an alarm from the NIM crate.

It was determined that there was a short along the lines of +12V and Ground , -12V and Ground, and between +-12V.
Entry  Wed Oct 25 18:12:43 2017, Sunflower collaboration, Gamma sources web page 
http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html
Entry  Sat Nov 5 03:18:13 2016, SG BCR RCF NTB, Gamma peaks in the overnight run, related to neutron inelastic scattering 08.png06.png
We looked at the overnight background run (161105_0935_BackgroundOvernight.root), There are gamma-peaks that could be related to neutron inerastic
scattering. We identified 565, 596, 608 and 69 keV. They might be related to the effect of neutrons. If this is the correct assignment, this would mean
at least some of the neutrons are not thermal when they interact with the germanium. 
Entry  Thu Jun 15 10:07:56 2017, BRIKEN collaboration, Gamma calibrations WhatsApp_Image_2017-06-15_at_18.00.36.jpegWhatsApp_Image_2017-06-15_at_18.00.51.jpegWhatsApp_Image_2017-06-15_at_18.37.12.jpeg
Clover calibrations. 

- Datafiles are located in the dac computer, path:

/data/1706FinalCalibrations/GammaCalibration
Entry  Wed Oct 25 19:14:09 2017, NB, First pass efficiency for current experiment 
I roughly (~10%) checked the efficiency for 4 of the peaks from  171025_1222_1355_152EuCloverCal.root.

I checked the peaks at 122, 245, 344, and 1408. The indication is an efficiency of 6.9,  9,   9,8, and 2.6 % for these gamma rays
repectively.
Entry  Wed May 6 11:41:24 2015, J. Agramunt, A. Estrade, First online combined analysis Screenshot_from_2015-05-06_19_12_29.png
Screen shot of the rudimentary on-line
analysis of the combined data:
BRIKEN-AIDA-BigRIPS
Entry  Fri Oct 14 14:06:38 2016, All, First measurement of BRIKEN and AIDA 161014Conf_BrikenFull.xlsx
Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common clock.
Entry  Sun Oct 22 10:26:44 2017, JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR, First Wasabi-YSO-BRIKEN correlation test 171022_1846_Conf_BrikenFullYSO.xlsx171022_1846_60Co_WasabiBrikenYSO.png
60Co source between YSO and Wasabi in front of D4 Clover
Briken configuration file: 171022_1811_Conf_BrikenFullYSO.xlsx WRONG!!!
Start: 18:25