|
ID |
Date |
Author |
Subject |
|
387
|
Wed Oct 24 16:11:32 2018 |
AT & AT | Low threshold, 252Cf, z=-25cm |
252Cf at z=-25cm,ie 25 cm downstream the beam, source axis parallel.
Low threshold.
18/10/24 START: 00:12
18/10/25 STOP: 08:42
** Configuration file:
181016_Conf_BrikenFull_2153_test_thr.xlsx
ROOT file:
181025_0012_252Cf_zm25cm_0842.root
DLT files:
181025_0012_252Cf_zm25cm_096.dlt
181025_0012_252Cf_zm25cm_097.dlt
181025_0012_252Cf_zm25cm_098.dlt
181025_0012_252Cf_zm25cm_099.dlt
181025_0012_252Cf_zm25cm_100.dlt
181025_0012_252Cf_zm25cm_101.dlt
181025_0012_252Cf_zm25cm_102.dlt
Comment:
- Clovers were placed outside the moderator
- AIDA not inside the moderator.
- Without In beam PE shielding. |
|
394
|
Thu Oct 25 16:08:53 2018 |
ATS & JLT | Lead bricks |
Lead bricks in BRIKEN hole to protect AIDA |
|
42
|
Tue Jul 19 04:09:32 2016 |
JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt | Last tube fit in the matrix!!! |
The photo of great moment |
|
353
|
Fri Oct 27 10:04:31 2017 |
SG, RY | LISE++ file for BRIKEN1 |
Here attached the lise file for BRIKEN1 |
|
191
|
Thu Dec 8 04:17:49 2016 |
PV | Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer |
All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:
https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing
To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro)
- Extract the downloaded file:
tar -xvzf elogBRIKEN2016.tar.gz
- Go to the extracted directory and execute make
cd elogBRIKEN2016
make
- Run elogd service:
./elogd start
then it will display:
elogd 3.1.2 built Dec 8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ...
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
- Go to your web browser, enter
http://localhost:3333
- It will ask you to register a new elog account, fill in your prefered information
Login name: |
|
(name may not contain blanks) |
Full name: |
|
Email: |
|
Password: |
|
Retype password: |
and press Save button
- Next, it will ask you to choose which logbook you want to subcribe, in this case we should choose: RIBF123, then press Save buttom at the top left connner (see attached photo)
- The experimental log should be displayed then. Select RIBF123.
Ubuntu 16
Please, update/install the following packages:
sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev
|
|
81
|
Thu Oct 13 12:58:31 2016 |
JL Tain et al | INCIDENT |
NIM Crate Failure. Lost of CLOVER G7
One of the 2 NIM crates, the one containing the power for CLOVER
preamps went kaputt.
As a consequence the preamp of CLOVER detector G7 was damaged:
G7 was removed |
|
323
|
Tue Jun 13 05:18:07 2017 |
PV | How to install ELOG for BRIKEN campaign 2017a |
Get ELOG software including entries for BRIKEN campaign 2017a from mars computer:
briken@mars:/data01/2017data/briken/ur17a/elogBRIKEN2017a.tar.gz
To run and view the Elog website in your local computer
For Ubuntu 16
Please, update/install the following packages:
sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev
- Extract the file:
tar -xvzf elogBRIKEN2017a.tar.gz
- Go to the extracted directory and execute make
cd elogBRIKEN2017a
make
- Run elogd service from that directory:
./elogd start
then it will display:
elogd 3.1.2 built Dec 8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ...
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
- Go to your web browser, enter
http://localhost:3333
- It will ask you to register a new elog account, fill in your preferred information
Login name: (name without space)
Full name:
Email:
Password:
Retype password:
and press Save button
- Next, it will ask you to choose which logbook you want to subscribe. Choose "BRIKEN2017-June" if you like, then press Save button at the top left corner
- The experimental log should be displayed then. Select BRIKEN > BRIKEN2017-June. |
|
Draft
|
Thu Nov 10 05:05:54 2016 |
KM | How to convert ridf-file to root-file |
1. Login to briken@ribfana03.riken.jp
2. Check if the ridf-file you want to convert is in the directory; /home/briken16/rawdata/bigrips/
3. Login to anaroot; type "anarootlogin"
4. Make your account as your name, and create your directory.
5. login to root; "root -l"
6. root[ ] .L MakeFullBigRIPSTree_BRIKEN.C+
7. root[ ] MakeFullBigRIPSTree_BRIKEN(" full name of ridf-file ", Brho34 , Brho56 ," full name of output file ")
You can check Brho34 and Brho56 in ---> http://bripscnt01.rarfadv.riken.jp/runsum/index.php
Find the link to the summary page in the "file" column.
For example: MakeFullBigRIPSTree_BRIKEN("radiioff0371.ridf", 7.176, 6.905, "test.root")
|
|
31
|
Sat Jul 9 21:00:54 2016 |
J.L. Tain | Hardware |
A list of the available hardware |
|
327
|
Wed Jun 14 06:22:21 2017 |
Ariel, Liu, Go, Nishinmura | HV is off |
To protect HPGe and 3He tubes from high intentsity primary beam, HV of these detector are off and the HPGe will be dismounted. |
|
38
|
Mon Jul 18 09:32:50 2016 |
Shintaro Go | HV controls |
You can start applying HVs on the detectors using macro on the control-computer.
If you have already signed in the computer that controls mpod,
1. Type http://192.168.13.239/ to monitor the status of HV.
2. Go to the directory : /home/pixie16/DAQ_1/include and open the config file : hvmon.conf
Type IP address channel slot name voltage Current RampUp RampDn Switch On/Off/RESET
V A V/s V/s 1 / 0 / 10
------ --------------- --------- ----- ---- ------- ------- ------ ------ -------------
0 192.168.13.239 0 0 PA1 1450 0.0001 50 10 0
0 192.168.13.239 1 0 PA2 1450 0.0001 50 10 0
0 192.168.13.239 2 0 PA3 1550 0.0001 50 10 0
0 192.168.13.239 3 0 PA4 1550 0.0001 50 10 0
0 192.168.13.239 4 0 PA5 1550 0.0001 50 10 0
0 192.168.13.239 5 0 OFF 0 0.0001 50 10 10
0 192.168.13.239 6 0 OFF 0 0.0001 50 10 10
0 192.168.13.239 7 0 OFF 0 0.0001 50 10 10
0 192.168.13.239 0 1 PA6 1200 0.0001 50 10 0
0 192.168.13.239 1 1 PA7 1750 0.0001 50 10 0
0 192.168.13.239 2 1 PA8 1750 0.0001 50 10 0
0 192.168.13.239 3 1 PA9 1750 0.0001 50 10 0
0 192.168.13.239 4 1 PA10 1750 0.0001 50 10 0
0 192.168.13.239 5 1 OFF 0 0.0001 50 10 10
0 192.168.13.239 6 1 OFF 0 0.0001 50 10 10
0 192.168.13.239 7 1 OFF 0 0.0001 50 10 10
0 192.168.13.239 0 3 D40 3000 0.0001 2 5 0
0 192.168.13.239 1 3 D41 3000 0.0001 2 5 0
0 192.168.13.239 2 3 D42 3000 0.0001 2 5 0
0 192.168.13.239 3 3 D43 3000 0.0001 2 5 0
0 192.168.13.239 4 3 G70 2500 0.0001 2 5 0
0 192.168.13.239 5 3 G71 3000 0.0001 2 5 0
0 192.168.13.239 6 3 G72 2500 0.0001 2 5 0
0 192.168.13.239 7 3 G73 2500 0.0001 2 5 0
When you want to start HVs, you may have to change the last bit to be 1.
Then go to the following path /home/pixie16//DAQ_1/hv-mpod and execute the command ./hvmon (The process should start),
When you want to down HVs, you may have to change the last bit to be 1.
Sometime you may get error messages colored red on the status monitor when you down the HVs, then you have to change the config file (hvmon.conf) and set the last bit to be 10 to clear the error messages.
--------------------------------------
The IP adress of the computer is currently 192.168.13.250. The user name : pixie16, password: ask Nathan or Shintaro
For now, slot names PA should be He3 and DXX and GXX should be clovers.
You can also change the HV values by changing hvmon.conf
|
|
126
|
Mon Nov 7 06:55:01 2016 |
NTB, SG | HPGe Fill line to D4 replaced |
HPGe fill line to D4 replaced only small leak (overflow) once Ge is full.
Solenoid was also wrapped to no effect. AIDA DAQ still stops writing.
Boron sheet and extra polyethylene were placed back on top.
|
|
88
|
Fri Oct 14 13:32:52 2016 |
NT BREWER, S Go, JM Allmond | Ge preamp power loss and solution. |
As previously recorded (81), on Thur Oct 13th, A NIM crate failure caused preamp power loss to the HPGe's. While D4 recovered with nominally the same resolution as before. G7 would not recieve power to the preamps without an alarm from the NIM crate.
It was determined that there was a short along the lines of +12V and Ground , -12V and Ground, and between +-12V.
After removing the Red preamp ribbon cable, the remaining channels (K,G,B) were able to be powered on and found to have a nice resolution of near ~2.3 keV for 661 (137Cs).
During the course of testing, the preamp power distribution box (supplied from ORNL) was seen to have a fault in the +12V light and supply. This was seen by placing this supply in a new NIM bin and seeing that it would also not properly supply preamp power to clover D4 (which had recovered fully).
The consistency in this fault is seen as cause to be suspicious of this preamp power supply. It has been replaced by putting two ORTEC TSA's into a seperate NIM bin and using the standard power supply for D4 and G7.
There was no appreciable effect on noise in any other detector.
|
|
350
|
Wed Oct 25 18:12:43 2017 |
Sunflower collaboration | Gamma sources web page |
http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html |
|
112
|
Sat Nov 5 03:18:13 2016 |
SG BCR RCF NTB | Gamma peaks in the overnight run, related to neutron inelastic scattering |
We looked at the overnight background run (161105_0935_BackgroundOvernight.root), There are gamma-peaks that could be related to neutron inerastic scattering. We identified 565, 596, 608 and 69 keV. They might be related to the effect of neutrons. If this is the correct assignment, this would mean at least some of the neutrons are not thermal when they interact with the germanium.
There was also significant drift in the Ge gain (seen on the pulser) this may effect the shape of these peaks.
Some gain drift was also seen on He preamps during this run. The cause is yet to be determined. It is also yet to be determined if these gain shifts are correlated. |
|
329
|
Thu Jun 15 10:07:56 2017 |
BRIKEN collaboration | Gamma calibrations |
Clover calibrations.
- Datafiles are located in the dac computer, path:
/data/1706FinalCalibrations/GammaCalibration
MEASUREMENTS
Configuration file: 170615_Conf_BrikenFull_AfterCrisis.xlsx
1) 152Eu. Source at the center of the moderator (0,0,0)
Source ID: 09 7011
Files: 170615_1805_152Eu_SourceNum272_000.dlt 170615_1805_1818_152Eu_SourceNum272.root
2) 137Cs. Source at the center of the moderator (0,0,0)
Source ID: 4763
Files: 170615_1837_137Cs_SourceNum4763_001.dlt 170615_1837_1846_137Cs_SourceNum4763.root
3) 152Eu. Source at the center of the moderator (0,0,0)????
Measurement over night.
Source ID: 09 7011
Files: 170615_1805_1850_152Eu_SourceNum272_002.dlt |
|
351
|
Wed Oct 25 19:14:09 2017 |
NB | First pass efficiency for current experiment |
I roughly (~10%) checked the efficiency for 4 of the peaks from 171025_1222_1355_152EuCloverCal.root.
I checked the peaks at 122, 245, 344, and 1408. The indication is an efficiency of 6.9, 9, 9,8, and 2.6 % for these gamma rays repectively.
Previously the efficiency was 11.1, 7.1, 5.3, and 1.6% . This indicates a reduction in efficiency below ~200 keV (because of YSO) and otherwise there is an increase in efficiency from 40% at 245 keV and up to 65% at 1480 keV.
A more complete analysis will come later.
|
|
26
|
Wed May 6 11:41:24 2015 |
J. Agramunt, A. Estrade | First online combined analysis |
Screen shot of the rudimentary on-line
analysis of the combined data:
BRIKEN-AIDA-BigRIPS
Top Left: dE (from MUSIC) vs. ToF (F11-F7)
Top Right: X-position (at F9) vs ToF
Middle Left: Amplitude spectrum of RIKEN tubes
Bottom Left: Energy spectrum from AIDA marked as beta-decays
Middle Right: Time correlations between betas (AIDA) and neutrons (BRIKEN)
Bottom Right: Time correlations between implants (AIDA) and neutrons (BRIKEN)
(the range of time correlated data [-1ms,+1ms]) |
|
89
|
Fri Oct 14 14:06:38 2016 |
All | First measurement of BRIKEN and AIDA |
Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common clock.
After installing the shielding and checking electronics
(See next entry)
252Cf source 7.5cm from the center.
AIDA nose aligned with the edge of the clovers hole.
start: 21:50 run number: BRIKEN:15 AIDA:0
stop : 22:18 run number: BRIKEN:16 AIDA:9
BRIKEN dlt file:252CfWithAida75mmcenter_15 to _16
AIDA file: aidas1:/TapeDate/Sept2016/R41_0 to _9
Online analyzed data around 30%
Online spec: 252CfWithAida75mmcenter_15_16.root
Configuration file attached. |
|
342
|
Sun Oct 22 10:26:44 2017 |
JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR | First Wasabi-YSO-BRIKEN correlation test |
60Co source between YSO and Wasabi in front of D4 Clover
Briken configuration file: 171022_1811_Conf_BrikenFullYSO.xlsx WRONG!!!
Start: 18:25
BRIKEN File: 171022_1825_60Co_BrikenYSO_040.dlt
Wasabi File: prerun0007.evt
Stop: 18:37
BRIKEN File: 171022_1825_60Co_BrikenYSO_066.dlt
Wasabi File:prerun0007.evt
Hughe amount of data!?:
Ch1-4 have 100 samples/event
Ch1 Samples MAW was activated
Ch5-8 have TriggerGateLength=10000samples & 10000 samples/event
We make a new measurement:
New Configuration file: 171022_1846_Conf_BrikenFullYSO.xlsx
Start: 18:57
Briken file: 171022_1856_60Co_BrikenYSO_067.dlt
Wasabi File: prerun0022.evt
Stop:19:06
Briken file: 171022_1856_60Co_BrikenYSO_067.dlt
Wasabi File: prerun0027.evt
Root file: 171022_1857_1906_60Co_BikenYSO.root |