  146   Tue Nov 9 15:03:29 2021 RSS + OGBurnt cables issuesUpper part of the frame was mounted. In
order to do so, the valve was closed, turbo
wire and hose were disconnected and then
 7x 
  145   Mon Nov 8 17:19:02 2021 RSS + OGNeg and ion cables connectedNeg and ion pump cables were labeled and
connected.

Kapton tape wrapped around the
 IMG_5480.JPGIMG_5483.JPGIMG_5488.JPG 
  144   Sat Nov 6 14:21:10 2021 CB RSSPreparation for bakeout tent mounting + to do for next weekConnected pneumatic hoses prepared by Gleb.
Opened flow to pressure reducer set at 2
bar. Ok. Attempted to operate pneumatic motors.
  
  143   Fri Nov 5 12:27:11 2021 CB RSS + DR NP ML USFirst pump down of YR09Tightened all flanges.

Added Pirani gauge and third IE514
to interaction chamber.
 20211105_131748.jpg20211105_135918.jpg20211105_135929.jpg20211105_140451.jpg20211105_150616.jpg 
  142   Wed Nov 3 16:39:01 2021 CB RSS + NP DR NK MLInteraction chamber lifted in placePrepared to move interaction chamber in
place. Ok CARME side, flange has M10 bolts.
On interaction chamber side i.e. bellows
 20211103_161553.jpg20211103_161813.jpg20211103_175457.jpg 
  141   Wed Nov 3 11:18:11 2021 CB RSS + DR NK MLLeak closedFound CARME at 1.0E-6 mbar. Beginning leak
test.

 
 20211103_110244.jpg20211103_110414.jpg 
  140   Tue Nov 2 12:45:36 2021 CB + DR NKIssues with CARME feetAttempted to close CARME as carefully as
possible.

Swapped out one foot for another
 20211102_134446.jpg 
  139   Mon Nov 1 14:48:16 2021 CB + ML DRCARME openedConfirmed leak as per previous Elog.

Tightened to 100 Nm - no effects.

Tightened to 130 Nm - bottom leak
  
  138   Sun Oct 31 13:55:13 2021 CB OHLeak testsFound CARME at 2E-7.

Closed valve on top of roughing
pump. Clamp was not tight. Pressure still
 20211031_155820.jpg 
  137   Sun Oct 31 08:05:15 2021 CB OH + DR MLCARME closed again + feedthroughs labeled(Fri 29 October)

Cleaned wire seal recess and labeled
thermocouples and flanges to identify p-n
 11x 
  136   Sun Oct 31 07:55:39 2021 CB JM + OHStrain relief mounted(Thu 28 October)

All strain relief extension plates
mounted behind the wires, using SS countersunk
 20211028_190026.jpg20211028_192251.jpg20211028_192210.jpg 
  135   Sun Oct 31 07:41:20 2021 CB JM + RSSWires plugged in DSSDs (Wed 27 October)

Started with top-most flange. Attemptedto
plug in MACOR lead in DSSD plug in preparation
 8x 
  134   Sun Oct 31 07:29:17 2021 CB JM + RSS OGDetectors mounted on plate in CARME(Wed 27 October)

Dismounted plate from rod. Dismounted
broken detectors from plate and placed back
 8x 
  133   Sun Oct 31 07:21:09 2021 CB JM RSSDetectors arrived in GSI(Tue 26 October)

Two new CARME DSSD arrived in GSI
and collected. Visually inspected both sides.
 6x 
  132   Fri Oct 29 15:09:27 2021 CB JM + RSS OG DRPreparation to mount new DSSDs(Mon 25 October - Tue 26 October)

Considered different strategies
to mount DSSDs inside CARME, while waiting
 6x 
  131   Sat Oct 23 12:58:11 2021 JMGSI vacuum and bakeout testing summaryAttachment 1 shows the pump-down of the
CARME chamber at GSI before installation
of kapton cabling inside the chamber and
 GSI_fullpumpdown.pngGSI_pumping.pngBakeout-elog.pngfit-elog.pngActivation-elog.png 
  130   Fri Oct 22 13:22:48 2021 TDCARME FEE64 adaptor PCB   10x 
  129   Fri Oct 22 13:11:26 2021 TDMSL type TTT14 assembly drawings & pin assignments   C-3434.pdfC-3517.pdf 
  128   Thu Oct 21 20:26:44 2021 JM TDThermocouple and Connector cablesNEG pump electrical connections tested
- all connections sound. 

Detector carriers have been redrilled
 10x 
  127   Mon Oct 18 16:25:11 2021 JM RSS TDNEG rotation + cable removalsKapton cabling and the broken ceramic detector
holder have been separated. Required holding
jacking plate in a vice and using lots of
 Screenshot_20211018-174141_Signal.jpg20211018_111130.jpg20211018_100015.jpg 