AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 27 of 34
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
666 Entries
Goto page
Previous
1
,
2
,
3
...
26
, 27,
28
...
32
,
33
,
34
Next
Selected entries:
ID
Date
Author
Subject
Text
146
Tue Nov 9 15:03:29 2021
RSS + OG
Burnt cables issues
Upper part of the frame was mounted. In
order to do so, the valve was closed, turbo
wire and hose were disconnected and then
7x
145
Mon Nov 8 17:19:02 2021
RSS + OG
Neg and ion cables connected
Neg and ion pump cables were labeled and
connected.
Kapton tape wrapped around the
144
Sat Nov 6 14:21:10 2021
CB RSS
Preparation for bakeout tent mounting + to do for next week
Connected pneumatic hoses prepared by Gleb.
Opened flow to pressure reducer set at 2
bar. Ok. Attempted to operate pneumatic motors.
143
Fri Nov 5 12:27:11 2021
CB RSS + DR NP ML US
First pump down of YR09
Tightened all flanges.
Added Pirani gauge and third IE514
to interaction chamber.
142
Wed Nov 3 16:39:01 2021
CB RSS + NP DR NK ML
Interaction chamber lifted in place
Prepared to move interaction chamber in
place. Ok CARME side, flange has M10 bolts.
On interaction chamber side i.e. bellows
141
Wed Nov 3 11:18:11 2021
CB RSS + DR NK ML
Leak closed
Found CARME at 1.0E-6 mbar. Beginning leak
test.
140
Tue Nov 2 12:45:36 2021
CB + DR NK
Issues with CARME feet
Attempted to close CARME as carefully as
possible.
Swapped out one foot for another
139
Mon Nov 1 14:48:16 2021
CB + ML DR
CARME opened
Confirmed leak as per previous Elog.
Tightened to 100 Nm - no effects.
Tightened to 130 Nm - bottom leak
138
Sun Oct 31 13:55:13 2021
CB OH
Leak tests
Found CARME at 2E-7.
Closed valve on top of roughing
pump. Clamp was not tight. Pressure still
137
Sun Oct 31 08:05:15 2021
CB OH + DR ML
CARME closed again + feedthroughs labeled
(Fri 29 October)
Cleaned wire seal recess and labeled
thermocouples and flanges to identify p-n
11x
136
Sun Oct 31 07:55:39 2021
CB JM + OH
Strain relief mounted
(Thu 28 October)
All strain relief extension plates
mounted behind the wires, using SS countersunk
135
Sun Oct 31 07:41:20 2021
CB JM + RSS
Wires plugged in DSSDs
(Wed 27 October)
Started with top-most flange. Attemptedto
plug in MACOR lead in DSSD plug in preparation
8x
134
Sun Oct 31 07:29:17 2021
CB JM + RSS OG
Detectors mounted on plate in CARME
(Wed 27 October)
Dismounted plate from rod. Dismounted
broken detectors from plate and placed back
8x
133
Sun Oct 31 07:21:09 2021
CB JM RSS
Detectors arrived in GSI
(Tue 26 October)
Two new CARME DSSD arrived in GSI
and collected. Visually inspected both sides.
6x
132
Fri Oct 29 15:09:27 2021
CB JM + RSS OG DR
Preparation to mount new DSSDs
(Mon 25 October - Tue 26 October)
Considered different strategies
to mount DSSDs inside CARME, while waiting
6x
131
Sat Oct 23 12:58:11 2021
JM
GSI vacuum and bakeout testing summary
Attachment 1 shows the pump-down of the
CARME chamber at GSI before installation
of kapton cabling inside the chamber and
130
Fri Oct 22 13:22:48 2021
TD
CARME FEE64 adaptor PCB
10x
129
Fri Oct 22 13:11:26 2021
TD
MSL type TTT14 assembly drawings & pin assignments
128
Thu Oct 21 20:26:44 2021
JM TD
Thermocouple and Connector cables
NEG pump electrical connections tested
- all connections sound.
Detector carriers have been redrilled
10x
127
Mon Oct 18 16:25:11 2021
JM RSS TD
NEG rotation + cable removals
Kapton cabling and the broken ceramic detector
holder have been separated. Required holding
jacking plate in a vice and using lots of