138
|
Sun Oct 31 13:55:13 2021 |
CB OH | Leak tests | Found CARME at 2E-7.
Closed valve on top of roughing
pump. Clamp was not tight. Pressure still |
|
|
137
|
Sun Oct 31 08:05:15 2021 |
CB OH + DR ML | CARME closed again + feedthroughs labeled | (Fri 29 October)
Cleaned wire seal recess and labeled
thermocouples and flanges to identify p-n |
11x |
|
136
|
Sun Oct 31 07:55:39 2021 |
CB JM + OH | Strain relief mounted | (Thu 28 October)
All strain relief extension plates
mounted behind the wires, using SS countersunk |
  |
|
135
|
Sun Oct 31 07:41:20 2021 |
CB JM + RSS | Wires plugged in DSSDs | (Wed 27 October)
Started with top-most flange. Attemptedto
plug in MACOR lead in DSSD plug in preparation |
8x |
|
134
|
Sun Oct 31 07:29:17 2021 |
CB JM + RSS OG | Detectors mounted on plate in CARME | (Wed 27 October)
Dismounted plate from rod. Dismounted
broken detectors from plate and placed back |
8x |
|
133
|
Sun Oct 31 07:21:09 2021 |
CB JM RSS | Detectors arrived in GSI | (Tue 26 October)
Two new CARME DSSD arrived in GSI
and collected. Visually inspected both sides. |
6x |
|
132
|
Fri Oct 29 15:09:27 2021 |
CB JM + RSS OG DR | Preparation to mount new DSSDs | (Mon 25 October - Tue 26 October)
Considered different strategies
to mount DSSDs inside CARME, while waiting |
6x |
|
131
|
Sat Oct 23 12:58:11 2021 |
JM | GSI vacuum and bakeout testing summary | Attachment 1 shows the pump-down of the
CARME chamber at GSI before installation
of kapton cabling inside the chamber and |
    |
|
130
|
Fri Oct 22 13:22:48 2021 |
TD | CARME FEE64 adaptor PCB | |
10x |
|
129
|
Fri Oct 22 13:11:26 2021 |
TD | MSL type TTT14 assembly drawings & pin assignments | |
 |
|
128
|
Thu Oct 21 20:26:44 2021 |
JM TD | Thermocouple and Connector cables | NEG pump electrical connections tested
- all connections sound.
Detector carriers have been redrilled |
10x |
|
127
|
Mon Oct 18 16:25:11 2021 |
JM RSS TD | NEG rotation + cable removals | Kapton cabling and the broken ceramic detector
holder have been separated. Required holding
jacking plate in a vice and using lots of |
  |
|
126
|
Sun Oct 17 11:48:48 2021 |
TD RSS | Sunday 17 October | Looking downstream the RHS motor assembly
has loose green/yellow (gnd?) see attachment
1
|
14x |
|
125
|
Sat Oct 16 17:25:47 2021 |
RSS TD | Broken detectors | One of the detectors was damaged while
mounting (see pictures 1-3).
Second detector was found already |
    |
|
124
|
Fri Oct 15 19:37:12 2021 |
RSS TD + DR | Friday 15 October | Ring seal is out. See picture 1.
Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some |
8x |
|
123
|
Thu Oct 14 15:54:47 2021 |
TD RSS | Thursday 14 October | Attachment 1 - what is function of the 4x
c/s holes indicated?
|
 |
|
122
|
Wed Oct 13 15:28:22 2021 |
RSS TD + OG | Split funnels | Split funnels installed on 4 (of 8) 2x78
way D connector feed-throughs. |
7x |
|
121
|
Wed Oct 13 15:16:12 2021 |
TD | Orientation of 2x 78 way D connector feedthroughs |
Looking downstream
|
   |
|
120
|
Wed Oct 13 12:06:09 2021 |
RSS TD | Flanges cleaned | RSS & TD had some success cleaning the COF600
flange surfaces of the staining and residues
observed when the downstream COF600 section |
12x |
|
119
|
Wed Oct 13 11:59:23 2021 |
TD | [How to] Open COF600 copper wire seals |
Use the M10 jacking points provided top/bottom
and
|
 |