Entry  Fri May 10 21:23:35 2024, TD, CB, JM, 20Ne7+ test beam 18x
22.00

Carsten Brandau stopping e-target experiment Unattended beam overnight. No operators watching.

10^5 (nominal) 20Ne7+ at 380keV/u beam available
Entry  Sun Apr 28 23:12:11 2024, TD, Monday 28 April 21x
00.09 DAQ continues data file R3_21

      DSSSD bias & leakage current OK - attachment 1
Entry  Sat Apr 27 23:16:02 2024, TD, Sunday 28 April 37x

00.12 DAQ continues data file R3_15
Entry  Fri Apr 26 23:41:16 2024, TD, Saturday 27 April 37x

00.34 DAQ continues data file R3_9
Entry  Fri Apr 26 07:05:01 2024, TD, Friday 26 April 19x

08.02 DAQ continues data file R1_14
Entry  Thu Apr 25 02:31:25 2024, TD, Thursday 25 April 39x

03.27 DAQ continues - file APR24/R1_7
Entry  Wed Apr 24 13:18:09 2024, TD, Examples of poor CARME cable management/routing 20240424_125858.jpg20240424_125929.jpg

Have observed some instances of poor CARME cable management/routing
Attachment 1 - SAES D-2000 ion pump HV cable (netal braid) transiting FEE64 cabling
Entry  Wed Apr 24 12:48:35 2024, TD, Wednesday 24 April 21x

      Replace AIDA ASIC mezzanine of aida01
Entry  Tue Apr 23 17:44:41 2024, TD, Tuesday 23 April 12x

18.43 ASIC settings 2024Feb08-15.59.09
Entry  Fri Apr 19 02:47:59 2024, TD, Friday 19 April 12x

03.45
Entry  Thu Apr 18 13:34:06 2024, TD, JG, Thursday 18 April 13x

14.30 
Entry  Wed Mar 6 10:47:11 2024, JG, TD, Wednesday 6 March - PEXARIA5 WR test temps.PNGstats_1.PNGstats_2.PNGwr_0949.PNG

Courtesy Nik Kurz, JG has installed a PEXARIA5 PCIe card adjacent to CARME - BuTIS single-mode fibre input
and HDMI output to root MACB input for distribution to the other MACBs and FEE64s.
Entry  Wed Feb 21 07:38:32 2024, TD, Wedneday 21 February 24x

10.54 23.2.24 Bias OFF
Entry  Tue Feb 20 14:12:32 2024, JM, Shutdown Screenshot_from_2024-02-20_15-11-40.png
CARME DAQ shutdown. FEEs turned OFF and all MIDAS server windows closed.

Detector bias turned OFF.

Final leakage current plot - attachment 1
Entry  Tue Feb 20 13:20:44 2024, OF, AG, JG, ML, R48 status check Screenshot_from_2024-02-20_14-22-05.pngScreenshot_from_2024-02-20_14-22-49.pngScreenshot_from_2024-02-20_14-29-39.pngScreenshot_from_2024-02-20_14-34-55.png
Doing afternoon check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.
Entry  Tue Feb 20 09:57:57 2024, OF, AG, ML, Run 48 status check Screenshot_from_2024-02-20_11-06-48.pngScreenshot_from_2024-02-20_11-08-05.pngScreenshot_from_2024-02-20_11-12-26.pngScreenshot_from_2024-02-20_11-13-58.png2024-02-20_11-37-46-304.png
Doing morning check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.
Entry  Tue Feb 20 09:51:37 2024, JM, Run 48 beam on target 
Run 48 started
Entry  Tue Feb 20 08:41:08 2024, OF, AG, still no beam CRYRING 
We have mosty empty injections into CRYRING. Only sporadically the beam with good intensity is injected.

Michael Lestinsky is currently working on the problem.
Entry  Tue Feb 20 07:50:10 2024, JM, DAQ restart 
DAQ restarted. Run46. All appears OK, aida01 shows high rates across ASIC 4 even with no beam which could not be resolved via ASIC control. May suggest
some damge.

Merger is running and tape server is writing data to disk. Data rate is about 1300 kB/sec from 800 kb/sec due to increase in aida01 rate.
Entry  Mon Feb 19 21:46:32 2024, EH, EM, CB, Run 45 + end of late shift 14x
22:54
We have moved the gas jet target out (y=4000), the density has dropped to zero.
Started a new run (Run45) for background measurement.