ID |
Date |
Author |
Subject |
Text |
|
561
|
Thu May 30 07:25:53 2024 |
Yuri, Phil, Nikos | Gas target | The cave is closed and beam is back
The d intensity is about half of
the intensity before the break |
|
560
|
Thu May 30 06:00:51 2024 |
Yuri Nikos ... | Open the cave | Nikos needs to enter the cave to work on
the target cooling.
|
|
633
|
Fri Jun 14 19:59:14 2024 |
US, LC, CB | New run with name of 72 is started due to target issue | 21:00
Target is lost. Background run
is being collected. |
|
198
|
Wed Feb 16 08:27:27 2022 |
TP, RSS | Alpha background run40 | 09:15
Check Leakage current: (see attachment
1) |
11x |
199
|
Wed Feb 16 12:43:05 2022 |
TP, RSS | Alpha background run40 | 13:30
Check Leakage current: (see attachment
1) |
11x |
609
|
Mon Jun 10 05:24:49 2024 |
TD, RSS, DB | R57 | 06:45 New data file G22-201/R57
Right arm at 64.60 mm
|
16x |
38
|
Mon Aug 9 12:36:00 2021 |
TD, RSS, ABD | Monday 9 August |
Attachments 1-5 - CARME shipment in CRYRING
hall
|
7x |
399
|
Sat May 13 11:34:25 2023 |
TD, RSS | Saturday 13 May |
12.34 DSSSD#3 bias -149.95V leakage current
-6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php |
|
424
|
Fri Jul 21 08:21:54 2023 |
TD, RSS | Baking tent manual | 09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar
Today - install TCs, connect to Pico |
|
608
|
Sun Jun 9 22:14:23 2024 |
TD, PM, AG | Run 56 - Data taking | 23:15 New run 56 with
Right arm at 64.60 mm
|
31x |
172
|
Fri Jan 14 10:00:18 2022 |
TD, OH, JM | Friday 14 January |
11.00 Per https://elog.ph.ed.ac.uk/CARME/170
and https://elog.ph.ed.ac.uk/CARME/171 issues |
|
373
|
Wed Aug 10 10:33:03 2022 |
TD, ML, JM, NP | Meeting at YR09 to discuss options for CARME operations to February 2022 |
Initial discussions of proposals to provide
open CARME chamber and provide access to |
|
623
|
Thu Jun 13 06:21:53 2024 |
TD, LCS | Run 64 - contd | 07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment |
13x |
624
|
Thu Jun 13 09:48:25 2024 |
TD, LCS | Run 65 - beam on target | 10:47
The energy is changed to 247.4
V. |
14x |
168
|
Tue Jan 11 12:45:15 2022 |
TD, JM, OH | Coolant manifold installation + detector pin tests | 2x cooling water manifolds with 2x 8 ports
have been installed - see attachments 1 &
2
|
|
508
|
Mon Feb 12 01:40:48 2024 |
TD, JM, CB, AR, RSS | Run17 - Run20 |
02.35 DAQ continues file G22-88/R17_30
|
49x |
554
|
Tue May 28 12:38:31 2024 |
TD, JM, CB | Run 2 - Alpha background run |
13.35 FEE64 temperatures OK - attachment
1
|
|
555
|
Tue May 28 15:25:21 2024 |
TD, JM, CB | Pulser tests | R3 started
Pulser ON. Approx 2 kHZ.
1.8*w waveforms attachments 1+2 |
|
8
|
Thu Sep 10 11:34:30 2020 |
TD, JM | Thursday 10 September | All neg feed-throughs have now been fully
installed, with ground tags
and power wires crimped and attached to the |
|
187
|
Fri Feb 4 12:49:54 2022 |
TD, JM | Grounding Tests and current status |
JM plans to install new crimped, 3mm dia
copper drain wires (a la AIDA@DESPEC) this |
10x |
|