  198   Wed Feb 16 08:27:27 2022 TP, RSSAlpha background run4009:15

Check Leakage current: (see attachment
1)
 11x 
  199   Wed Feb 16 12:43:05 2022 TP, RSSAlpha background run40 13:30

Check Leakage current: (see attachment
1)
 11x 
  38   Mon Aug 9 12:36:00 2021 TD, RSS, ABDMonday 9 August
Attachments 1-5 - CARME shipment in CRYRING
hall
 7x 
  399   Sat May 13 11:34:25 2023 TD, RSSSaturday 13 May
12.34 DSSSD#3 bias -149.95V leakage current
-6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
  
  424   Fri Jul 21 08:21:54 2023 TD, RSSBaking tent manual09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar

      Today - install TCs, connect to Pico
 CARME-baking-guide_(1).pdf 
  172   Fri Jan 14 10:00:18 2022 TD, OH, JMFriday 14 January
11.00 Per https://elog.ph.ed.ac.uk/CARME/170
and https://elog.ph.ed.ac.uk/CARME/171 issues
  
  373   Wed Aug 10 10:33:03 2022 TD, ML, JM, NPMeeting at YR09 to discuss options for CARME operations to February 2022
Initial discussions of proposals to provide
open CARME chamber and provide access to
 20220810_111638.jpg20220810_095036.jpg20220810_095150.jpg20220810_095159.jpg 
  168   Tue Jan 11 12:45:15 2022 TD, JM, OHCoolant manifold installation + detector pin tests2x cooling water manifolds with 2x 8 ports
have been installed - see attachments 1 &
2
 20220111_113628.jpg20220111_113613.jpg20220111_111428.jpg 
  508   Mon Feb 12 01:40:48 2024 TD, JM, CB, AR, RSSRun17 - Run20
02.35 DAQ continues file G22-88/R17_30
 49x 
  8   Thu Sep 10 11:34:30 2020 TD, JMThursday 10 September All neg feed-throughs have now been fully
installed, with ground tags 
and power wires crimped and attached to the
 20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip 
  187   Fri Feb 4 12:49:54 2022 TD, JMGrounding Tests and current status
JM plans to install new crimped, 3mm dia
copper drain wires (a la AIDA@DESPEC) this
 10x 
  370   Tue Aug 9 13:44:16 2022 TD, JMTuesday 9 August
14.00 CARME vacuum c. 1.8e-10 mbar - see
attachment 1
 Capture_1.PNG20220809_163450.jpg20220809_135840.jpg20220809_135833.jpg20220809_135801.jpg 
  372   Wed Aug 10 10:30:04 2022 TD, JMWednesday 10 August
09.45 Found CARME electrical power off
 4.PNG3.PNG2.png1.png 
  375   Fri Aug 12 09:06:57 2022 TD, JMNoise tests pt2
10.07 DSSSD bias -100V leakage current -8.65uA
 30x 
  378   Sun Aug 14 06:50:58 2022 TD, JMSunday 14 August
07.51 DAQ continues files 22Feb/R97
 10x 
  480   Mon Jan 29 15:32:08 2024 TD, JMMonday 29 January contd.
Test + and test - daisy chain cabling extended
from DSSSD #1 to #2 to DSSSD #1 to DSSSD
 16x 
  541   Thu Apr 18 13:34:06 2024 TD, JGThursday 18 April
14.30 
 13x 
  262   Wed Feb 23 21:27:29 2022 TD, CNcheck Motor position ok

Data rate: 1030kbytes/s

T ok
 11x 
  147   Wed Nov 10 14:41:12 2021 TD RSS + CB (remotely)Wrapping CARME in heating tapeML reports that baking of the upstream section
(gas jet interaction chamber plus e-target)
has commenced - initially to 50 deg C to
  
  39   Tue Aug 10 12:22:56 2021 TD RSSTuesday 10 August
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests
 20210810_115555.jpg20210810_115607.jpg20210810_115617.jpg 