AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 1 of 33  ELOG logo
ID Date Authordown Subject Text Attachments
  561   Thu May 30 07:25:53 2024 Yuri, Phil, NikosGas targetThe cave is closed and beam is back

The d intensity is about half of
the intensity before the break
  
  560   Thu May 30 06:00:51 2024 Yuri Nikos ...Open the caveNikos needs to enter the cave to work on
the target cooling.

 
  
  633   Fri Jun 14 19:59:14 2024 US, LC, CBNew run with name of 72 is started due to target issue21:00

Target is lost. Background run
is being collected.
 Screenshot_from_2024-06-14_21-08-22.pngScreenshot_from_2024-06-14_21-08-22.png 
  198   Wed Feb 16 08:27:27 2022 TP, RSSAlpha background run4009:15

Check Leakage current: (see attachment
1)
 11x 
  199   Wed Feb 16 12:43:05 2022 TP, RSSAlpha background run40 13:30

Check Leakage current: (see attachment
1)
 11x 
  609   Mon Jun 10 05:24:49 2024 TD, RSS, DBR5706:45 New data file G22-201/R57

      Right arm at 64.60 mm
 16x 
  38   Mon Aug 9 12:36:00 2021 TD, RSS, ABDMonday 9 August
Attachments 1-5 - CARME shipment in CRYRING
hall
 7x 
  399   Sat May 13 11:34:25 2023 TD, RSSSaturday 13 May
12.34 DSSSD#3 bias -149.95V leakage current
-6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
  
  424   Fri Jul 21 08:21:54 2023 TD, RSSBaking tent manual09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar

      Today - install TCs, connect to Pico
 CARME-baking-guide_(1).pdf 
  608   Sun Jun 9 22:14:23 2024 TD, PM, AGRun 56 - Data taking23:15 New run 56 with

      Right arm at 64.60 mm
 31x 
  172   Fri Jan 14 10:00:18 2022 TD, OH, JMFriday 14 January
11.00 Per https://elog.ph.ed.ac.uk/CARME/170
and https://elog.ph.ed.ac.uk/CARME/171 issues
  
  373   Wed Aug 10 10:33:03 2022 TD, ML, JM, NPMeeting at YR09 to discuss options for CARME operations to February 2022
Initial discussions of proposals to provide
open CARME chamber and provide access to
 20220810_111638.jpg20220810_095036.jpg20220810_095150.jpg20220810_095159.jpg 
  623   Thu Jun 13 06:21:53 2024 TD, LCSRun 64 - contd07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2

07.24 DSSSD bias & leakage current OK - attachment
 13x 
  624   Thu Jun 13 09:48:25 2024 TD, LCSRun 65 - beam on target10:47

The energy is changed to 247.4
V.
 14x 
  168   Tue Jan 11 12:45:15 2022 TD, JM, OHCoolant manifold installation + detector pin tests2x cooling water manifolds with 2x 8 ports
have been installed - see attachments 1 &
2
 20220111_113628.jpg20220111_113613.jpg20220111_111428.jpg 
  508   Mon Feb 12 01:40:48 2024 TD, JM, CB, AR, RSSRun17 - Run20
02.35 DAQ continues file G22-88/R17_30
 49x 
  554   Tue May 28 12:38:31 2024 TD, JM, CBRun 2 - Alpha background run
13.35 FEE64 temperatures OK - attachment
1
 Screenshot_from_2024-05-28_13-35-03.pngScreenshot_from_2024-05-28_13-34-30.pngScreenshot_from_2024-05-28_13-33-19.pngScreenshot_from_2024-05-28_13-36-30.pngScreenshot_from_2024-05-28_13-37-16.png 
  555   Tue May 28 15:25:21 2024 TD, JM, CBPulser testsR3 started

Pulser ON. Approx 2 kHZ.

1.8*w waveforms attachments 1+2
 Screenshot_from_2024-05-28_16-14-56.pngScreenshot_from_2024-05-28_16-15-43.pngScreenshot_from_2024-05-28_16-16-18.pngScreenshot_from_2024-05-28_16-20-05.pngScreenshot_from_2024-05-28_16-28-46.png 
  8   Thu Sep 10 11:34:30 2020 TD, JMThursday 10 September All neg feed-throughs have now been fully
installed, with ground tags 
and power wires crimped and attached to the
 20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip 
  187   Fri Feb 4 12:49:54 2022 TD, JMGrounding Tests and current status
JM plans to install new crimped, 3mm dia
copper drain wires (a la AIDA@DESPEC) this
 10x 
ELOG V3.1.4-unknown