ID |
Date |
Author |
Subject |
130
|
Fri Oct 22 13:22:48 2021 |
TD | CARME FEE64 adaptor PCB |
|
Attachment 1: 3D.pdf
|
|
Attachment 2: Bottom_Ground_Pad.pdf
|
|
Attachment 3: Flex_Layer_1.pdf
|
|
Attachment 4: Flex_Layer_2.pdf
|
|
Attachment 5: Flex_Layer_3.pdf
|
|
Attachment 6: Flex_Layer_4_(1).pdf
|
|
Attachment 7: PCB_Bottom.pdf
|
|
Attachment 8: PCB_Top.pdf
|
|
Attachment 9: Silkscreen_Top.pdf
|
|
Attachment 10: Top_Ground_Pad.pdf
|
|
332
|
Mon Feb 28 14:38:15 2022 |
TD | NewMerger statistics |
Screenshots of all NewMerger statistics |
Attachment 1: Screenshot_from_2022-02-28_15-38-04.png
|
|
Attachment 2: Screenshot_from_2022-02-28_15-37-57.png
|
|
Attachment 3: Screenshot_from_2022-02-28_15-37-52.png
|
|
Attachment 4: Screenshot_from_2022-02-28_15-37-44.png
|
|
Attachment 5: Screenshot_from_2022-02-28_15-37-32.png
|
|
Attachment 6: Screenshot_from_2022-02-28_15-37-24.png
|
|
Attachment 7: Screenshot_from_2022-02-28_15-37-10.png
|
|
Attachment 8: Screenshot_from_2022-02-28_15-37-03.png
|
|
Attachment 9: Screenshot_from_2022-02-28_15-36-55.png
|
|
Attachment 10: Screenshot_from_2022-02-28_15-36-48.png
|
|
Attachment 11: Screenshot_from_2022-02-28_15-36-39.png
|
|
Attachment 12: Screenshot_from_2022-02-28_15-36-31.png
|
|
Attachment 13: Screenshot_from_2022-02-28_15-36-23.png
|
|
Attachment 14: Screenshot_from_2022-02-28_15-36-16.png
|
|
Attachment 15: Screenshot_from_2022-02-28_15-36-07.png
|
|
Attachment 16: Screenshot_from_2022-02-28_15-35-59.png
|
|
Attachment 17: Screenshot_from_2022-02-28_15-35-51.png
|
|
Attachment 18: Screenshot_from_2022-02-28_15-35-42.png
|
|
Attachment 19: Screenshot_from_2022-02-28_15-35-36.png
|
|
Attachment 20: Screenshot_from_2022-02-28_15-35-26.png
|
|
Attachment 21: Screenshot_from_2022-02-28_15-35-14.png
|
|
Attachment 22: Screenshot_from_2022-02-28_15-35-09.png
|
|
Attachment 23: Screenshot_from_2022-02-28_15-34-52.png
|
|
Attachment 24: Screenshot_from_2022-02-28_15-34-47.png
|
|
Attachment 25: Screenshot_from_2022-02-28_15-34-42.png
|
|
Attachment 26: Screenshot_from_2022-02-28_15-34-35.png
|
|
Attachment 27: Screenshot_from_2022-02-28_15-34-28.png
|
|
Attachment 28: Screenshot_from_2022-02-28_15-34-20.png
|
|
Attachment 29: Screenshot_from_2022-02-28_15-34-12.png
|
|
Attachment 30: Screenshot_from_2022-02-28_15-34-03.png
|
|
Attachment 31: Screenshot_from_2022-02-28_15-33-50.png
|
|
Attachment 32: Screenshot_from_2022-02-28_15-33-45.png
|
|
Attachment 33: Screenshot_from_2022-02-28_15-33-39.png
|
|
Attachment 34: Screenshot_from_2022-02-28_15-33-31.png
|
|
Attachment 35: Screenshot_from_2022-02-28_15-33-24.png
|
|
Attachment 36: Screenshot_from_2022-02-28_15-33-15.png
|
|
Attachment 37: Screenshot_from_2022-02-28_15-33-07.png
|
|
386
|
Wed Mar 22 16:33:32 2023 |
TD | NIM WR source |
Test of NIM WR source at Edinburgh
Attachment 1 - NIM WR source
NIM module upper SMA - DSO ch 1
NIM module lower SMA - DSO ch 2
Attachment 2
NO SYNC or CLK signals observed.
Noise observed with NIM bin power ON *and* OFF
Attachment 3
NIM WR source in EG&G Ortec NIM bin
... and with the Digilent Zybo board switched ON!
Attacments 4-7
Trigger ch 2
4, 40, 400 & 4000ns/div
Attachment 8
Trigger ch 1
4ns/div |
Attachment 1: 20230322_155735.jpg
|
|
Attachment 2: 20230322_160448.jpg
|
|
Attachment 3: 20230322_160453.jpg
|
|
Attachment 4: 20230322_181015.jpg
|
|
Attachment 5: 20230322_181027.jpg
|
|
Attachment 6: 20230322_181045.jpg
|
|
Attachment 7: 20230322_181054.jpg
|
|
Attachment 8: 20230322_180945.jpg
|
|
400
|
Sun May 14 11:55:12 2023 |
TD | Sunday 14 May |
12.44 DSSSD#3 bias -149.95V leakage current -6.448uA temperature +19.7 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
CRYRING cave lights ON - leakage current measurements @ 60s intervals
6.448
6.449
6.448
6.448
6.449
6.448
6.448
6.448
6.449
6.448
18.24 DSSSD#3 bias -149.95V leakage current -6.442uA temperature + 21.0 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
CRYRING cave lights ON - leakage current measurements @ 60s intervals
6.441
6.441
6.441
6.441
6.441
6.442
6.442
6.442
6.440
6.441 |
401
|
Mon May 15 07:34:22 2023 |
TD | Monday 15 May |
08.35 DSSSD#3 bias -149.95V leakage current -6.418uA temperature +19.6 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
DSSSD#3 bias OFF |
418
|
Thu Jul 13 08:46:44 2023 |
TD | Replacing wire seal |
09.30 CARME chamber status
Edwards scroll pump ON
Edwards Speedivac valves #1 & #2 OPEN
VAT gate valves OPEN
Re-connect Leybold Pirani gauge to local display/control
CARME chamber pressure 2.4mbar
Scroll pump should be able to achieve < 0.1mbar - indicates significant leak
Davide will first check bolt torques for all flanges opened during most recent vacuum cycle
12.05 Additional torque did not resolve problems
ML test COF600 seal with isopropanol and observed increased chamber pressure
Will open COF600 seal after lunch
13.55 COF600 seal removed - one section marked by Kapton tape shows some distortion and a burr on the inner diameter - see attachments 1 & 2.
ML speculated that perhaps the seal was lightly too long and a section of circumference was forced outwards?
Vacuum surfaces cleaned with isopropanol and tissues - red/brown discoloration probably indicating copper observed
14.30 New COF600 seal installed, flanges closed, bolts finger tight, bolts then systematically torqued in small increments
COF600 torques finger tight, 10, 20, 30, 40, 60, 80, 100, 120, 140, 160Nm x2
DN100 flanges doenstream finger tight, 8, 16, 24Nm
16.40 Start scroll pump and slowly rough chamber
18.00 Roughing CARME chamber pressure flatlines c. 30mbar indicating a large leak.
ML ran some isopropanol around COF600 flange and observed response in roughing pressure of c. 0.2-0.3mbar at c. 30mbar which appears to confirm COF600 is leaking.
|
Attachment 1: 20230713_135351.jpg
|
|
Attachment 2: 20230713_135416.jpg
|
|
419
|
Fri Jul 14 08:27:17 2023 |
TD | CARME open - inspecting seal |
09.20 CARME chamber at atmospheric pressure as expected.
Will open CARME chamber and inspect COF600 wire seal for similar (or other) issues to the seal removed yesterday. One possibility is that the COF600 flange
surfaces/structures are misaligned and part of seal is 'escaping' the seal zone. Given the flanges close easily the misalignment would have to be small.
13.30 Observations
The bolts on the upstream feet of the far detector chamber are all loose and have probably been so for some time
Based on measurements with calipers and the insertion of shims into the *radial* gap between COF600 flange surfaces the COF600 flanges may be misaligned and rotated
transversely by a fraction of a millimeter. The challenge is that the chamber is not designed for fine transverse adjustments and it is not easy to measure the changes.
The Pfeiffer recommended procedure for closing COF seals is to start tightening bolts *diametrically* and then to tighten sequentially
https://www.pfeiffer-vacuum.com/en/know-how/mechanical-components-in-vacuum/connections/detachable-flange-connections/cof-flanges/
The plan
Adjust position of far detector chamber and secure upstream feet bolts
Close COF600 flange using Pfeiffer recommended procedure
Today is Friday so it will probably be Monday before we can pump the CARME chamber
13.50 Another view
Grosmontage also inspected the COF600 seal this afternoon. They said that it was important that the seal should be installed under tension to ensure that it remained
in position as the flanges were closed and the bolts begin to be tightened. They think the seals are a little too large in circumference but that they can shorten one on
Monday morning. |
420
|
Mon Jul 17 08:45:11 2023 |
TD | Closing CARME again |
Grosmantage are scheduled to arrive 10.00 to inspect COF600 seals and their fit to the COF600 flange. They may decide to adjust the seals so that they fit the flange
under
tension.
Once Grosmontage are satisfied with the seal and its fit we can close the CARME chamber and start pumping down.
Attachment 1 - photo of bakeout tent parts including those adapted/modified by Davide.
18.40 Grosmontage were re-tasked this morning.
Davide, Omer, Cosmas checked alignment of COF600 male and female flanges.
4x COF600 seals were checked - for some seals we observed wave over a ~ 10cm section of the circumference and/or surface scratches/roughness.
Also observed that COF600 seals appeared to be too large - consequently the wire seal would be seated well ( i.e. in contact with the flange surface )
for the majority of the circumference but would lift from flange surface for part(s) of the circumference.
The fourth COF600 seal seated well over all of the circumference and we decided to proceed with closing the chamber.
COF600 flange bolts tightened sequentially 5, 10, 20, 30, 40, 60, 80, 100, 120, 140, 160Nm.
ML roughed CARME chamber slowly ( < 1mbar/s ) to protect Be window. Turbo started at 1.3mbar. Pirani gauge indicated e-3 mbar range when turbo at speed.
18.53 IE514 gauge ON pressure 4.05e-5mbar.
19.10 Pirani 1.42e-3 mbar IE514 3.02e-5 mbar |
Attachment 1: 20230717_093106.jpg
|
|
421
|
Tue Jul 18 08:16:28 2023 |
TD | Pumping down. Issues found with one detector. |
09.15 Following overnight pumping of CARME chamber by Leybold turbo
Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
The Leybold IE514 gauge currently in use is the CARME unit ( serial # 1054 ). The calibration data can be found at https://elog.ph.ed.ac.uk/CARME/56
09.44 Pirani 1.00e-3 mbar IE514 2.71e-7 mbar
10.10 Leak tester attached to backing line
Valves to leak tester and turbo (connection to Edwards scroll pump in between) closed.
Stop Edwards scroll pump with magnetic valve 'red' button - magnetic valves closes and Edwards scroll pump is switched off.
Open valves to leak tester and then (slowly) turbo.
Wait for leak tester to settle in e-12 mbar.l/s range. Leak tester pressure 3.6e-3 mbar. IE514 2.69e-7 mbar.
11.00 Pirani 1.00e-3 mbar IE514 2.42e-7 mbar
Leak tester 1.8e-10 mbar.l/s
13.04 Pirani 1.00e-3 mbar IE514 2.06e-7 mbar
Leak testing.
Downstream DN100 flanges from CARME to dipole OK
Lower NEG power connector feedhtrough (downstream chamber) OK
Left hand side (looking downstream) bellows OK
c. few e-9 mbar.l/s leak bottom left (lookimg downstream) of COF600 wire seal
Additional torque to M16 bolts bottom left - c. 10 bolts -> 220Nm+
c. 0.1-0.3e-11 mbar.l/s
Further checks around circumference of COF600 seal reveal some small leaks c. e-11-12 mbar.l/s.? However background rate
in leak tester too high for sensitive test - will await recovery to resume checking.
14.00 Pirani 9.8e-4 mbar IE514 1.96e-7 mbar
Leak tester 4.9e-10 mbar.l/s
14.35 DSSSD test
IE514 OFF
Ambient temperature 21.5 deg C
Top right
-10V -4uA
-20V 10uA
c. -30V > -20uA trip
Top left
-150V -5.15uA
Bottom left
-150V -4.97uA
Bottom right
-150V -6.33uA
Top right (repeat)
-20V -10uA
-25V -14uA
15.28 IE514 ON
Pirani 9.8e-4 mbar IE514 1.87e-7 mbar
15.40 c. few e-9 mbar.l/s leak around magnetic valve - probably not an issue in terms of backing performance but may interfere with/confuse leak testing
16.05 Pirani 9.8e-4 mbar IE514 1.74e-7 mbar
Leak tester 1.2e-9 mbar.l/s
Will leave CARME pumping with leak tester on roughing line and see whether leak rate recovers. If so, will continue leak tests tomorrow.
18.50 Pirani 1.00e-3 mbar IE514 1.48e-7 mbar
Leak tester < 1e-12 mbar.l/s (leak tester valved off) |
422
|
Wed Jul 19 08:17:26 2023 |
TD | Leak testing |
09.16 Pirani 1.00e-3 mbar IE514 8.77e-8 mbar
Leak tester c. 5e-12 mbar.l/s (leak tester valved off)
09.48 Pirani 1.00e-3 mbar IE514 8.67e-8 mbar
Leak tester c. 3.5e-12 mbar.l/s (leak tester valved off)
10.33 Pirani 1.00e-3 mbar IE514 8.55e-8 mbar
Leak tester c. 4e-10 mbar.l/s (leak tester connected to CARME roughing line)
10.55 Leak tester remains at few e-10 mbar.l/s - we do not understand why
With leak tester in differential mode the highest reading around the COF600 seal is c. 3.5e-12 mbar.l/s
Following checks elsewhere on the chamber we observe c. 6e-12 mbar.l/s which presumably reflects accumulation of He around the chamber
Dispersing He with compressed air reduces diff mode reading to c. 2e-12 mbar.l/s
11.00 Pirani 9.80e-4 mbar IE514 8.47e-8 mbar
14.49 Pirani 1.00e-3 mbar IE514 7.71e-8 mbar
Leak tester isolated from CARME backing line - CARME Edwards scroll pump now backing turbo. |
423
|
Thu Jul 20 08:29:26 2023 |
TD | Installing tent. Two NEG power cable broken. |
09.28 Pirani 1.00e-3 mbar IE514 5.45e-8 mbar
12.10 Bakeout tent frame installed
SAES UHV1400 NEG pump power cables #1-6 installed
See attachments 1 & 2
16.35 Attachments 3-6
upstream baseplate
3x sets of heaters beneath CARME chamber connected to CRYRING heater/TC manifold - attachments 7-8
16.45 Pirani 1.00e-3 mbar IE514 4.80e-8 mbar
17.10 SAES D-2000 #1 downstream, outside NEG power + HV ( attachment 9 - OK cable connector )
SAES D-2000 #3 downstream, inside NEG power + HV
SAES D-2000 #4 upstream, inside HV
SAES D-2000 #2 upstream, outside HV
2x ( of 4x ) SAES D-2000 neg power cables were broken - forward-shell detached (unscrewed ) from back-shell remaining attached to D-2000 neg power connector.
Re-assembly is straightforward but it is unclear how the 6x female sockets are aligned with the connector keys of the forward-shell (attachments 10-11 cf. attachment 9).
Until this is understood these 2x SAES D-2000 neg power cables should not be used. |
Attachment 1: 20230720_120957.jpg
|
|
Attachment 2: 20230720_121016.jpg
|
|
Attachment 3: 20230720_162938.jpg
|
|
Attachment 4: 20230720_163700.jpg
|
|
Attachment 5: 20230720_163651.jpg
|
|
Attachment 6: 20230720_163655.jpg
|
|
Attachment 7: 20230721_093447.jpg
|
|
Attachment 8: 20230721_093452.jpg
|
|
Attachment 9: 20230721_092923.jpg
|
|
Attachment 10: 20230721_094608.jpg
|
|
Attachment 11: 20230721_094642.jpg
|
|
443
|
Mon Sep 25 16:33:32 2023 |
TD | Removed tape from heaters TC |
17.33 IE514 pressure 6.4e-11 mbar, ambient temperature +20.8 deg C
The thermocouples on the 3x groups of heater elements have been detached from direct contact with the heating element and now float abpove the heating element by 2-
3cm - see attachments 1 & 2
The vacuum group IE514 and Ametek RGA are still attached to CARME - see attachment 3. Have requested vacuum group remove them.
The 'air side' of the Be window on the interaction chamber is under vacuum provided by small Agilent scroll pump.
|
Attachment 1: 1000007072.jpg
|
|
Attachment 2: 1000007067.jpg
|
|
Attachment 3: 1000007070.jpg
|
|
444
|
Tue Sep 26 08:08:42 2023 |
TD | Tuesday 26 September |
09.07 IE514 pressure 6.4e-11 mbar, ambient temperature +20.3 deg C
Using appc218 ( account carme ) workstation by the CARME 19" rack
ssh pi@carmebakingpi
Re-connect to bakeout monitor app
screen -dR
See attcahment 1
12.02 Vacuum group ion pump disconnected and RGA removed from CARME chamber - outside of CARME bakeout tent 'closed' - see attachments 2-4
Vacuum group IE514 to be disconnected
14.45 Vacuum group disconnect their IE514
Inside of CARME bakeout tent closed
Photos of the CARME bakeout tent inside and outside CRYRING - see attachments 5-7 |
Attachment 1: 1000007087.jpg
|
|
Attachment 2: 1000007090.jpg
|
|
Attachment 3: 1000007091.jpg
|
|
Attachment 4: 1000007089.jpg
|
|
Attachment 5: 1000007096.jpg
|
|
Attachment 6: 1000007095.jpg
|
|
Attachment 7: 1000007094.jpg
|
|
445
|
Tue Sep 26 10:13:14 2023 |
TD | ELOTECH PID Temperature Controller R4000 manual ( German and English ) |
|
Attachment 1: BA-Isoheat_R4000-XX-X-000-X-X_DE_V1.03.pdf
|
|
Attachment 2: R4000-XX-X-000-X-X_EN_V1.30.pdf
|
|
446
|
Wed Sep 27 15:56:41 2023 |
TD | Wednesday 27 September |
16.55 CARME IE514 8.2e-11 mbar
Vacuum pressure increased slowly overnight from c. 6e-11 mbar yesterday to c. 8e-11 mbar today following low power startup tests of the bakeout controller heating
the CARME interaction and detector chambers yesterday and today.
Attachment 1 - bakeout controller config courtesy Anton Kalinin
Attachments 2 & 3 - bakeout controller summary displays and CARME bakeout monitor display c. 17.00 today
The 3x CARME heaters are connected to controller #4 zones # 1-3, i.e. lower right display, zones 1-3, mains fuses F9-F11
17.30 3x ( of 4x ) SAES D-2000 ion pump controllers ( SIP modules ) switched off. Fourth controller was already switched off and SHV cable disconnected from rear panel of
SIP module. |
Attachment 1: 1000007129.jpg
|
|
Attachment 2: 1000007127.jpg
|
|
Attachment 3: 1000007128.jpg
|
|
447
|
Thu Sep 28 09:19:50 2023 |
TD | Thursday 28 September |
10.20 CARME IE514 8.6e-11 mbar
CARME bakeout monitor and ELOTECH bakeout controller status - see attachments 1 & 2
The CARME bakeout monitor shows recovery from test yesterday evening. The ELOTECH controller was switched to manual mode for the 3x CARME zones and 5% power selected
for 45 minutes. CARME TCs increased from mid-20s to high 20s/low 30s over a period of 45 minutes. At the conclusion of the test power was set to 0% for all 3x CARME zones
and the mode changed from manual to controlled. |
Attachment 1: 1000007142.jpg
|
|
Attachment 2: 1000007143.jpg
|
|
448
|
Fri Sep 29 08:54:29 2023 |
TD | Friday 29 September |
09.50 CARME IE514 9.0e-11 mbar, ambient temperature 21.3 deg C
CARME bakeout monitor and ELOTECH temperature controller - attachments 1 & 2
10.15 Commence bakeout ramp
Set all ELOTECH PID temperature controller zones ( channels ) to 50 deg C
Expect all non-CARME zones to reach temperature set point quickly. There will be a delay for the TCs corresponding to the CARME heaters but the internal CAME TCs
will respond more slowly- will observe response of CARME TCs over time.
10.35 ELOTECH temperature controller - attachment 3
11.10 CARME TCs change from c. 25-28 deg C to 28-35 deg C
11.15 Set all ELOTECH PID temperature controller zones ( channels ) to 100 deg C
12.15 CARME IE514 1.39e-10 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor and ELOTECH temperature controller - attachments 4 & 5
14.20 CARME IE514 3.62e-10 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH temperature controller front panel and Grafana bakeout dashboard- attachments 6-8
15.20 Whilst all of the ELOTECH temperature controller TCs are at their current set point ( 100 deg C ), the CARME TCs are not yet at equilibrium. Plan to leave system
in current state until tomorrow morning. Assuming CARME is at equilibrium will then increment ELOTECH temperature controller TC set points.
17.50 CARME IE514 6.59e-10 mbar, ambient temperature 20.6 deg C
CARME bakeout monitor, ELOTECH temperature controller front panel and Grafana bakeout dashboard- attachments 9-11 |
Attachment 1: 1000007175.jpg
|
|
Attachment 2: 1000007174.jpg
|
|
Attachment 3: 1000007176.jpg
|
|
Attachment 4: 1000007178.jpg
|
|
Attachment 5: 1000007177.jpg
|
|
Attachment 6: 1000007189.jpg
|
|
Attachment 7: 1000007190.jpg
|
|
Attachment 8: 1000007188.jpg
|
|
Attachment 9: 1000007227.jpg
|
|
Attachment 10: 1000007228.jpg
|
|
Attachment 11: 1000007229.jpg
|
|
449
|
Sat Sep 30 10:58:14 2023 |
TD | Saturday 30 September |
10.50 CARME IE514 7.14e-10 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
Change ELOTECH R4000 set points for CARME heaters #1 and #3 to 125 deg C
14.20 CARME IE514 8.25e-10 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 4-6
Change ELOTECH R4000 set points for CARME heaters #1 and #3 to 150 deg C
18.30 CARME IE514 1.29e-9 mbar, ambient temperature 20.7 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 7-9
Change ELOTECH R4000 set points for CARME heaters #1 and #3 to 175 deg C and heater #2 to 125 deg C |
Attachment 1: 1000007236.jpg
|
|
Attachment 2: 1000007239.jpg
|
|
Attachment 3: 1000007237.jpg
|
|
Attachment 4: 1000007251.jpg
|
|
Attachment 5: 1000007250.jpg
|
|
Attachment 6: 1000007252.jpg
|
|
Attachment 7: 1000007256.jpg
|
|
Attachment 8: 1000007257.jpg
|
|
Attachment 9: 1000007255.jpg
|
|
450
|
Sun Oct 1 10:24:50 2023 |
TD | Sunday 1 October |
11.20 CARME IE514 3.53e-9 mbar, ambient temperature 20.6 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
Change ELOTECH R4000 set points for CARME heaters #1 and #3 to 200 deg C, heater #2 to 150 deg C
14.10 CARME IE514 6.12e-9 mbar, ambient temperature 20.7 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 4-6
Change ELOTECH R4000 set points for CARME heaters #1, #2 and #3 to 225, 175 and 225 deg C respectively.
18.10 CARME IE514 1.92e-8 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 7-9
Change ELOTECH R4000 set points for CARME heaters #1, #2 and #3 to 250, 150 and 225 deg C respectively.
All other ( active ) ELOTECH R4000 set points ( interaction chamber etc ) to 130 deg C.
20.25 CARME IE514 2.14e-8 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 10-12
No change to ELOTECH R4000 set points |
Attachment 1: 1000007352.jpg
|
|
Attachment 2: 1000007354.jpg
|
|
Attachment 3: 1000007353.jpg
|
|
Attachment 4: 1000007360.jpg
|
|
Attachment 5: 1000007358.jpg
|
|
Attachment 6: 1000007361.jpg
|
|
Attachment 7: 1000007368.jpg
|
|
Attachment 8: 1000007369.jpg
|
|
Attachment 9: 1000007370.jpg
|
|
Attachment 10: 1000007377.jpg
|
|
Attachment 11: 1000007375.jpg
|
|
Attachment 12: 1000007374.jpg
|
|
451
|
Mon Oct 2 08:41:43 2023 |
TD | Monday 2 October |
09.35 CARME IE514 1.95e-8 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
No change to ELOTECH R4000 set point
17.45 CARME IE514 1.91e-8 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 4-6
No change to ELOTECH R4000 set point |
Attachment 1: 1000007409.jpg
|
|
Attachment 2: 1000007408.jpg
|
|
Attachment 3: 1000007407.jpg
|
|
Attachment 4: 1000007416.jpg
|
|
Attachment 5: 1000007415.jpg
|
|
Attachment 6: 1000007413.jpg
|
|