Sun Sep 26 17:20:13 2021, RSS JM CB (remotely), CARME baking status -5 
|
Current temperature ~105 C
See plot and screen attached.
Current pressure 6.08E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Sat Oct 2 08:26:49 2021, RSS JM CB (remotely), CARME baking status -17 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure 1.73E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Sat Oct 2 22:14:14 2021, RSS JM CB (remotely), CARME baking status -18 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure 1.60E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Sun Oct 3 08:36:01 2021, RSS JM CB (remotely), CARME baking status -19 
|
08:36
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure 1.41E-7
19:42
Temperature
is being slowly reduced (<10C/h) to ~100C in order to activate NEG pumps Monday morning.
Current pressure ~1.2E-7 and will begin to drop.
23:20
Temperature
set point 110C.
Current pressure ~5E-8
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
|
Mon Oct 4 06:34:58 2021, RSS JM CB (remotely), CARME baking status -20 
|
Current temperature ~110 C (on manual mode)
See plot and screen attached.
Current pressure 3.20E-8
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Mon Oct 4 20:30:46 2021, RSS JM CB (remotely), CARME baking status -21 
|
Current temperature ~95 C (on manual mode)
See plot and screen attached.
Current pressure 2.86E-10
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Fri Sep 24 07:04:57 2021, RSS JM, IE 514 pin arrangement and degas instructions 
|
Fabre (German) Color (English)
grau
grey |
Mon Sep 27 06:42:45 2021, RSS JM, CARME baking status -6 
|
Current temperature ~102 C. Was set in the manual mode since last evening 18:54.
See plot and screen attached.
Current pressure
3.62E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Tue Sep 28 06:40:22 2021, RSS JM, CARME baking status -8 
|
Current temperature ~120 C, increasing
See plot and screen attached.
Current pressure ~1.07E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Tue Sep 28 12:18:54 2021, RSS JM, CARME baking status -9 
|
Current temperature ~130 C, was set to 130 C on manual mode around 10:00 am
See plot and screen attached.
Current pressure ~1.37E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Tue Sep 28 18:53:13 2021, RSS JM, CARME baking status -10 
|
Current temperature ~130 C (on manual mode)
See plot and screen attached.
Current pressure ~9.98E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Wed Sep 29 06:49:41 2021, RSS JM, CARME baking status -11 
|
Current temperature ~130 C (on manual mode)
See plot and screen attached.
Current pressure ~6.08E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Wed Sep 29 15:34:07 2021, RSS JM, CARME baking status -12 
|
Current temperature ~130 C (on manual mode)
See plot and screen attached.
Current pressure ~4.51E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Thu Sep 30 06:29:39 2021, RSS JM, CARME baking status -13 
|
Current temperature ~130 C (on manual mode)
See plot and screen attached.
Current pressure ~4.07E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Thu Sep 30 18:16:52 2021, RSS JM, CARME baking status -14 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure ~3.30E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Fri Oct 1 07:17:46 2021, RSS JM, CARME baking status -15 
|
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Current pressure ~2.30E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php |
Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
|
CARME baking with heating tape continues
Left overnight at -
Ch1-3: 140 degrees |
Mon Nov 22 08:06:01 2021, RSS CB + ML, NEG activation starts  
|
08:20 Temperature of channels 1-3 and 5-6 were reduced to 120 degrees. Immediately after, the conditioning of the NEGs was stopped and D2000s ion pumps
were flashed 5 times. The temperature of the gas jet target and the electron target channels was reduced to 120 degrees.
11:00 Started activation of D2000 following procedure in ... at T=400 C for trise 30 min + thold 90 minute. After activation, NEG elements are |
Sun Jun 16 13:29:05 2024, RSS CB, Run 78
|
Target clogged? |
Mon Nov 8 17:19:02 2021, RSS + OG, Neg and ion cables connected  
|
Neg and ion pump cables were labeled and connected.
Kapton tape wrapped around the neg cable connectors for the strain support.
Lower frame mounted. |