ID |
Date |
Author |
Subject |
Text |
 |
619
|
Tue Jun 11 20:10:25 2024 |
JM | Run 63 - Beam only background | 21:00
Claude has achieved optimal cooling
parameters for the beam |
|
617
|
Tue Jun 11 12:26:07 2024 |
RSS, JS, JM, CB | Run 62 - Beam optimization + Target change | Beam optimization and target change |
|
616
|
Tue Jun 11 08:34:50 2024 |
JM, RSS, JS | Run 61 - beam on target | New run 61
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
   |
615
|
Tue Jun 11 04:36:17 2024 |
CB, RSS, JS | Run 60 - as 59, left servo in | 05:36
Run started.
Conditions as before, except left |
11x |
614
|
Mon Jun 10 20:31:12 2024 |
JM, AK, EH, CB | Run 59 Beam on target | 21:32
New run 59
Right arm at 64.60 mm |
18x |
612
|
Mon Jun 10 14:26:52 2024 |
EH, AK | Run 58 | 15:30
Merger OK, Tape server OK
ADC data item statistics OK |
8x |
608
|
Sun Jun 9 22:14:23 2024 |
TD, PM, AG | Run 56 - Data taking | 23:15 New run 56 with
Right arm at 64.60 mm
|
31x |
283
|
Fri Feb 25 15:38:40 2022 |
JM, CB, PJW | Run 55, 56, 59 root histograms | Run55 - detector out, start 22/2/22 13:20,
end 23/2/22 10:49
Run 56 - detector moved in, start |
6x |
607
|
Sun Jun 9 13:45:24 2024 |
CB PMH AG | Run 55 - Data taking | 14:45
New run 55 with:
Right arm at 64.60 mm |
18x |
605
|
Sun Jun 9 08:30:49 2024 |
JM, CB | Run 54 - beam on target | 09:30
New run 54 with:
Electron cooler setpoint |
7x |
604
|
Sat Jun 8 20:32:17 2024 |
LB, JM | Run 52 - beam on target | New run 52 with:
Electron cooler setpoint
244.2 V |
    |
601
|
Sat Jun 8 10:13:52 2024 |
CB, JM, TD | Run 50/51 - data taking | 11:13
ML enabled ring signals remotely.
Used FakeMotion.dat (read FakeMotion.dat |
8x |
536
|
Tue Feb 20 09:57:57 2024 |
OF, AG, ML | Run 48 status check | Doing morning check. Checked the leakage
currents, all ok. Attachment 1
Temperatures ok, attchment 2 |
    |
535
|
Tue Feb 20 09:51:37 2024 |
JM | Run 48 beam on target | Run 48 started |
|
600
|
Sat Jun 8 06:13:21 2024 |
CB | Run 47/48/49 - target issues & tests | 07:00
After putting the target back,
we observe strong periodic (5 s) fluctuations |
    |
599
|
Sat Jun 8 00:14:39 2024 |
LB | Run 46 - background with beam | RUN 46- started at 00:50
Horizontal beam position = 4.0
mm, vertical beam position = -5.0 mm. |
22x |
598
|
Fri Jun 7 22:33:13 2024 |
LB | Run 45 - tests on beam-target overlap | Tried to double check beam-target overlap
by changing beam horizontal coordinate.
In the tablethe counts in the 4000-5200 |
    |
532
|
Mon Feb 19 21:46:32 2024 |
EH, EM, CB | Run 45 + end of late shift | 22:54
We have moved the gas jet target out (y=4000),
the density has dropped to zero.
|
14x |
531
|
Mon Feb 19 08:45:22 2024 |
JM, JG, SHB, EM, EH | Run 44 - cooled beam on target | 09:43
Run 44 started cooled beam
on target |
35x |
596
|
Fri Jun 7 14:09:04 2024 |
JM, CB, DR, CN, LB | Run 44 - 15N Data Taking | 15:35
Electron cooler voltage set point
= 244.3 V |
|
|