  596   Fri Jun 7 14:09:04 2024 JM, CB, DR, CN, LBRun 44 - 15N Data Taking15:35

Electron cooler voltage set point
= 244.3 V
  
  202   Wed Feb 16 21:41:11 2022 JMRun 43 Alpha Background22:41

Check Leakage current: (see attachment
1) = 10.01 uA and falling
 8x 
  529   Mon Feb 19 05:10:48 2024 TDRun 42 night shift contd.06.03 DAQ continues file G22-86/R42_32

      DSSSD bias & leakage current - attachments
 6x 
  528   Sun Feb 18 22:03:56 2024 TDRun 42 night shift
23.03 DAQ continues file G22-86/R42_21
 47x 
  530   Mon Feb 19 06:01:17 2024 SHB, JM, JGRun 42 morning shift07:00

Observed reduction in YR09 presure
over last few hours in ML online plot. Beam
 6x 
  527   Sun Feb 18 13:58:33 2024 AR, OF, JMRun 42 - cooled beam on targetRun 42 - 15:00

Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary.
 27x 
  595   Fri Jun 7 10:05:40 2024 CBRun 41/42/43 - 15N data taking start11:05

Confirmed overlap is at 4 mm under
new settings.
 8x 
  200   Wed Feb 16 15:27:53 2022 EM, JMRun 41 Pulser tests16:30

NOTE: Pulser is ON!

Check Leakage current: (see attachment
 11x 
  525   Sun Feb 18 07:53:51 2024 HW AGRun 40 Morning Shift08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1

Tempritures of, attchment 2
 27x 
  524   Sun Feb 18 00:16:55 2024 JM CBRun 40 - night shift01:17

Run 40 continues.

Beam intensity looks OK. Oscillates
 15x 
  523   Sat Feb 17 14:29:03 2024 JM, CB, AR, ABRun 40 - cooled beam on target15:27

Run 40 started cooled beam on target

Detectors IN (left arm pot =36.5
 31x 
  594   Thu Jun 6 16:23:10 2024 LB CB JMRun 39 - Run 40 15NStarted run 39.

 

We have the 15N+ beam with 426
 15x 
  593   Thu Jun 6 05:44:45 2024 DR YL DB LB CB JMRun 38 - 15N Tests06:45

All system checks OK

Target density 3.4e11
 8x 
  592   Wed Jun 5 13:34:02 2024 JMRun 37 - Change in thresholds14:20

Target nozzle currently being replaced.
No beam
 Screenshot_from_2024-06-05_14-36-44.png 
  591   Wed Jun 5 13:21:45 2024 JM, CBRun 36 - pulser walkthrough14:00

Access to the cave as Nikos and
Andreas have begun work on the target.
 Screenshot_from_2024-06-05_14-20-18.pngScreenshot_from_2024-06-05_14-21-26.pngScreenshot_from_2024-06-05_14-27-43.pngScreenshot_from_2024-06-05_14-25-44.png 
  520   Fri Feb 16 22:03:27 2024 TDRun 35 - night shift
22.51 DAQ continues file G22-86/R35_36
 49x 
  519   Fri Feb 16 10:02:41 2024 JM, OF, CB, AR, EMRun 35 - cooled beam on target11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5
 27x 
  521   Sat Feb 17 06:19:27 2024 JM, CBRun 35 - contd07:10

FEE temperatures OK

System checks OK
 Screenshot_from_2024-02-17_07-20-01.pngScreenshot_from_2024-02-17_07-21-27.pngScreenshot_from_2024-02-17_09-09-35.pngScreenshot_from_2024-02-17_09-13-44.pngScreenshot_from_2024-02-17_09-14-35.png 
  588   Tue Jun 4 18:08:04 2024 Boudefla Dounia - CB - LB - SDRun 3419:08

Beam energy = 3 MeV.

Horizontal beam position = 4.0
 19x 
  587   Tue Jun 4 15:25:36 2024 BD US CBRun 3316:26

Merger OK, Tape server OK

ADC data item statistics looks
 Screenshot_from_2024-06-04_18-33-23.pngScreenshot_from_2024-06-04_18-33-38.pngScreenshot_from_2024-06-04_18-35-26.pngScreenshot_from_2024-06-04_18-36-55.png 