  739   Thu Jun 12 06:20:50 2025 JMRun 68,69 - background

07:20

Started a background run while the cave is open.

All ASIC settings remain unchanged, we just have no beam.

We see obvious difference in the rate plots for DSSD2 from the monitoring code. Attachment 1 - beam on, Attachment 2- beam off.

Data rate ~1.6 MB.sec

Checks OK.

10:30

Lost DSSD4 again. Writing a lot of junk to disk.

Switched to MEC channels. Still writing lots of data. Stopped the run.

Required ASIC check load on aida13,14,15,16 in order to bring rates back down.

Slowly re-biasing detector. At 35V

Moved detectors fully out for safety. Left potentiometer = 18.86 mm and right potentiometer = 19.8 mm. No effect on leakage currents.

Past 40V we large increases in leakage current. Only went up to 10uA and didn't trip. Set to 40V, current back down to normal levels.

 

Note we have turned the target compressor off to heat up before cooling later to try and get higher densities. This follows a drop in E1 yesterday reducing the target density.

10:45

Started new background run - Run 69.

DSSD4 set to MEC.

Thresholds still as in previous runs (120, 80, 80 keV).

  628   Fri Jun 14 10:21:24 2024 JS, TDRun 68

Frank has been tuning the beam since 08:00

detectors moved fully out

11:20

New run (R68) started at 11:20. Put into no storage mode as rates are high during beam tuning. Cut off the end of last nights run when analysing

System checks OK

 

13.20 DSSSD bias & leakage current OK - attachment 1

FEE64 temperatures OK - attachment 2

ADC data item stats - attachment 3

per FEE64 1.8.W spectra - attachments 4-5

per FEE64 Rate spectra - attachment 6

 aida16 producing HEC data - Chck ASIC load to fix

TapeServer - no storage mode

 

13.35 aida01-aida04 c. 250k ADC data items/s - will await completion of current beam/target scan to fix by cycing Left DSSSD motion

 

14.00 CB cycles Left DSSSD motion to fix aida01-aida04 rate issue

 

CRYRING vacuum & hall temprature - attachments 7-8

 

14.28 New run data file G22-201/R69

Beam/target overlap optimised - details to follow

  626   Thu Jun 13 21:07:30 2024 LCS, USRun 67- beam on target

22:05

The energy is changed to 247.4 V.

Read back value is 246.849 V.

Right arm at 64.60 mm

Left arm IN at 36.54 mm

horizontal beam position 8.75 mm

vertical beam position  -5mm

Beam intensity 4.0e+7 particles.

Run is R67. Target temperature is 36..6 K.

Values of E1 is 820 Hz, 2.4A, 8.69e-2 mbar,  2.55e+11/cm2. The pressure is slowly increasing since this afternoon. The recent value is E1 is 820 Hz, 2.4A, 9.0e-2 mbar,  3.28e+11/cm2

 

Systen checks all OK

Attachments

13.39 DSSSD bias & leakage current OK

FEE64 temps OK

ADC data item stats OK

per FEE64 Rate spectra

Merger, TapeServer et

 data file R65_11

DSSSD bias & leakge current log

CARME DSSSD motion control

 

 

 

  627   Thu Jun 13 23:01:07 2024 RSS, JS, EHRun 67 - Night shift

Run 67

00:01

      DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats OK - attachment 3

      per FEE64 Rate spectra OK - attachment 4

           Beam intensity 5.7E7 particles

           Target density - 4.98E11 atoms/cm2

 

02:01

      DSSSD bias & leakage current OK - attachment 5

      FEE64 temperatures OK - attachment 6

      ADC data item stats OK - attachment 7

      per FEE64 Rate spectra OK - attachment 8

           Beam intensity 5.8E7 particles

           Target density - 4.39E11 atoms/cm2

 

04:00

      DSSSD bias & leakage current OK - attachment 9

      FEE64 temperatures OK - attachment 10

      ADC data item stats OK - attachment 11

      per FEE64 Rate spectra OK - attachment 12

           Beam intensity 4.1E7 particles

           Target density - 3.57E11 atoms/cm2

 

06:00

      DSSSD bias & leakage current OK - attachment 13

      FEE64 temperatures OK - attachment 14

      ADC data item stats OK - attachment 15

      per FEE64 Rate spectra OK - attachment 16

           Beam intensity 3.7E7 particles

           Target density - 3.89E11 atoms/cm2

08:00

          The orbit adjustments started. The detectors moved out. One of these showed rates of about 20kHz. but after moving it in and out again it returned to normal.

11:00

      DSSSD bias & leakage current OK - attachment 17

      FEE64 temperatures OK - attachment 18

      ADC data item stats OK - attachment 19

      per FEE64 Rate spectra OK - attachment 20

           Beam intensity 4.9E7 particles

           Target density - 5.27E11 atoms/cm2

  738   Wed Jun 11 10:13:42 2025 EW, CB, PJW, AR, JMRun 67

As run 66, optimisation of beam completed

DSSD4 now working and thresholds to 0x30 (480keV), switched to LEC

Tape service at 1.7MB/s

Did NOT reset the root histograms!!

 

11:30 All checks OK

13:48 All checks OK

15:15, fULL CHECK, STATUS - Okay. Target density ~2E12

16:15 All Checks OK. Target 2.9e12

17:30, Full check! status - okay. target 2.3e12

18:30 All Checks Ok

19:30 All Checks OK

21:30: All System Checks OK but targte density started dropping around 8:20. Tried to move the nozel but any x direction made it drop alot and y did nothing. Values hovering steadily between 1.1e12 to 1.4e12. Will try and move nozel again in 1 hour.

22:40: Full check, Status -okay! thickness 1.4E12. For more details look at the attchments

00:55: Full check. All looks okay!

03:55: Full check. All looks good!

06:28 Checks OK. Target density has dropped and is ~9e11 at/cm2. It will require some attention this afternoon

07:00 Run stopped. Final histogram attached. Number of counts somewhat obscured by background level.

  736   Wed Jun 11 08:37:48 2025 CB, PJWRun 66

09:38

As Run 65, no changes, CRYRING operators attempting to improve beam intensity.

We should be able to keep running while they do, but there is a chance of some missed injections or other oddities.

Checks OK

Root histograms NOT zeroed.

 

10:20

Checks OK

  624   Thu Jun 13 09:48:25 2024 TD, LCSRun 65 - beam on target

10:47

The energy is changed to 247.4 V.

Read back value is 246.849 V.

Right arm at 64.60 mm

Left arm IN at 36.54 mm

MBS working - hopefully

horizontal beam position 8.75 mm

vertical beam position  -5mm

Beam intensity 3.0e+7 particles.

e-cooler export controls before/after energy change - attachments 1 & 2

New run is R65. Target temperature is 37.6 K.

Values of E1 is 820 Hz, 2.12A, 6.01e-2 mbar,  2.8e+11/cm2

12:34

Systen checks all OK

Target density stable at ~1.5e11 at/cm2

E1 = 6e-2 mbar, turbo is fine

 

 

13,38 CB reboots RHS CRYRING control computer (atppc017) - appears to be a now unavoidable system update/reboot

13.39 DSSSD bias & leakage current OK - attachment 3

FEE64 temps OK - attachment 4

ADC data item stats OK - attachment 5

per FEE64 Rate spectra - attachment 6

Merger, TapeServer etc - attachments 7-8

 data file R65_11

DSSSD bias & leakge current log - attachment 12

CARME DSSSD motion control - attachment 13

 

13.42 E1 turbo 820Hz 2.2A 5.2e-2mbar

Target 3.45e+11/cm2 T1 36.6K

Beam c. 3e+7

 

15:20

Stats OK. Temps OK.

Merger OK. Write to disk OK.

 

  735   Tue Jun 10 22:38:59 2025 JM, CB, PJWRun 65

23:40

Offline anlaysis shows two clear peaks for DSSD1 and 2 at very low energies close to the threshold. One must be elastics and the other a noise peak.

For DSSD3 the noise level is so exceptionally high due to the low threshold that nothing can be discerned from background.

Therefore I decided to stop the previous run and increase the slow comparator threshold for DSSD3 from 50 keV to 80 keV (same as DSSD2).

Run 65 started.

150 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam.

Detectors in with servos only. Both arms are IN and stationary.

Left potentiometer = 36.54 mm

Right potentiometer = 37.96 mm

Data rate has dropped to 1.5 MB/sec and merger is between 600k and 900k.

Stats attached at new thresholds.

Stats zero'd to see number of pause and resume overnight.

02:30

Some reaction counts visible on monitoring histograms (rate v low)

Checks OK, same fee (aida16 fails clock and adc as before)

pause info items after a few hours attached

05:00

We see the peaks much more clearly now. Rate is low but they are there. Target density looks like it has been fluctuating in the low 10^12 region. 

Note for this energy with 1e8 pps, 1e12 target density I estimate ~2 counts/h per detector for the 3He peak.from our spreadsheet calculator. After 6 hours of this run I saw about 10-15 counts in the peak of DSSD2, perhaps the same in DSSD3. DSSD1 has missing strips so is harder to see. This rate is about 48 hours for 5% (if we had 4 dssds).   

Checks OK

Leakage current of dssd4 has been stable at 40V for a while now. Pushed voltage up to 75V with leakage current stable. At 80V it started to go over current

Turned bias to 60V and have left on at this level. It looks stable. Perhaps in the morning it can be pushed to close to 100V.

 

07:15

Temps OK

System wide checks: 16 fails ADC calibration, 14 fails WR decoder

Rates OK, some Pause/resume statementes overnight. See attached x2

Merger OK. 1.5 Mb/s

Peaks clearly visible in two detectors.

 

08:25 All checks OK. DSSD 4 to 75V - OK.

09:10 All checks OK. DSSD 4 to 80V. Trying to improve target (2-4E12).

  623   Thu Jun 13 06:21:53 2024 TD, LCSRun 64 - contd
07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2

07.24 DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats OK - attachment 3

      per FEE64 Rate spectra - attachment 4

      per FEE64 1.8.L spectra - attachments 5-6

      per FEE64 1.8.W spectra - 20us FSR - attachments 7-8

      Merger, TapeServer etc - attachments 9-10
       data file G22-201/R64_11

      DSSSD bias & leakage current log - attachment 11

      CRYRING hall temperature log - attachment 12

      CARME DSSSD position controller - attachment 13

07.57 all histograms zero'd


07.58 E1 pump 794Hz, 2.8A, 2.6e-1 mbar, 3.1e+11/cm2
08.55 E1 pump 785Hz, 2.8A, 2.74e-1 mbar, 4.8e+11/cm2. Therefore, the temperature is changed from 38.8 K to 38.4 K. Values of E1 is changed to E1 pump 782Hz, 2.7A, 2.95e-1 mbar, 6e+11/cm2
09.15 The temperature is further changed from 38.4 K to 38.0 K.  
09.25 Values of E1 is changed to E1 pump  780 Hz,  2.79 A,  3.0 e-1 mbar,  5.87 e+11/cm2
09.35 Values of E1 is changed to E1 pump  779 Hz,  2.79 A,  3.1 e-1 mbar,  2.07 e+11/cm2
09.45 Values of E1 is changed to E1 pump  778 Hz,  2.75 A,  3.0 e-1 mbar,  4.6 e+11/cm2
10.00 Values of E1 is changed to E1 pump   776 Hz,   2.78 A,  3.05 e-1 mbar,  5 e+11/cm2

Intervention by Uli. Reduced H2 regulator to c. 12 bar. Briefly opened exhaust to hasten recovery.

10.13 E1 820Hz 2.3A 7.7e-2mbar c. 2e+11/cm2
10.34 E1 820Hz 2.1A 6.2e-2mbar c. 1.2e+11/cm2 38K
      Beam c. 4e+7. Cooler set 247.3V, read 246.751V.
  622   Thu Jun 13 00:50:33 2024 JM, JSRun 64 - beam on target

01:50

Right arm at 64.60 mm

Left arm IN at 36.54 mm

MBS working - hopefully

Target ~3E11

Injection ca. 3E7

horizontal beam position 8.75 mm

vertical beam position  -5mm

Changed electron cooler set point to 247.3 V

Read value 246.75 V

Collector current 4.3A

Histograms and statistics zero'd. Code reset

Rates OK. Temps OK.

 

NOTE. Between 23:45 and 12:45 the electron cooler was off? We called HKR and they turned it back on. Are we using the same cooler settings? Is the cooler still definitely working properly? Ask Claude in the morning

02:30

The target density started to oscillate between 2e+10 and 3.5e+10. However, the pump speed seems to be stable.

03:50

The oscillations seems to deepend between 1e+10 and 6e+10. Additionally the E1 pump slowed down to 815. As Nikos suggested during the tuning, I tried to lower the temperature from 41K to 40.8K.

04:00 - 04:30

No major change was observed, thus I increased the temperature to 42.2K in order to try to get the pump to the nominal rotation. After 10 minutes, the pump slowed down to 810 and the pressure in E1 reached 2.2e-1. Since increasing the temperature seemed to have a negative effect, I slowly decresed the temperature with steps of 0.2 K, until reaching 40K. At this point, the E1 pump returned to 819/820, the pressure of E1 lowered to 1.6e-1 and the target density seems to be more stable with a value of 2.8e+11.

05:00

The target density started decreasing to 1.5e+10 and the pump speed slowed to 815. I've tried to lower the temperature to 39.8K, but the target density started to decrease. Thus I've set the temperature to 40.2K. The pump speed raised to 818 but the target density remaind at 1e+11 level with oscillations between 8.5e+10 and 1.5e+11. After some minutes, it started slowly increasing towards the 2e+11 region. The E1 pumping speed is stable at 818 and the pressure of E1 is 2.02e-1.

05:10

Electron cooler off, restarted 10 minutes after by calling HKK.

05:30

Target density at 1.5e+11, however, the E1 raised to 2.3e-1 and the pump speed decreased to 810. Since going down seemed to solve it, I decreased the temperature to 39.6K. After 5 minutes the E1 lowered to 1.9e-1 and the pump speed is going up (currently at 814). The target density is at the same level of 1.5e+11.

06:00

Again the target density started to go down, as well the speed of the E1 pump and the E1 pressure reached 2.3e-1. I lowered the temperature to 39.2K: the target density raised to approximately 3.8e+11 (and keeps going up), the E1 pressure lowered to 1.9e-1 and the E1 pump speed started increasing from 810 to 815.

06:30

The target density starting going down again, the E1 started increasing to 2.3e-1 and the E1 pump speed decreased to 810. I lowered the temperature to 38.8K, the density raised to 3.5e+11, the E1 pressure lowered to 1.9e-1 and the pumping speed starting increasing.

  620   Tue Jun 11 21:16:50 2024 TDRun 63 continued
Run 63 continued

22.06 DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats - attachment 3

      per FEE64 Rate spectra - attachments 4-5
       aida16 producing HEC data, ASIC check load to clear


23.56 DSSSD bias & leakage current OK - attachment 6

      FEE64 temperatures OK - attachment 7

      ADC data item stats - attachment 8

      per FEE64 Rate spectra - attachments 9

       aida01-aida04 high ADC data item rates - left DSSSD motion cycle required to reset


03.28 DSSSD bias & leakage current OK - attachment 10

      FEE64 temperatures OK - attachment 11

      ADC data item stats - attachment 12

      per FEE64 Rate spectra - attachments 13

       aida01-aida04 high ADC data item rates - left DSSSD motion cycle required to reset


07.50 DSSSD bias & leakage current OK - attachment 14

      FEE64 temperatures OK - attachment 15

      ADC data item stats - attachment 16

      per FEE64 Rate spectra - attachments 17

       aida01-aida04 high ADC data item rates (see above) appears to have resolved itself or has been resolved (but not logged)
  619   Tue Jun 11 20:10:25 2024 JMRun 63 - Beam only background

21:00

Claude has achieved optimal cooling parameters for the beam

No target and internal work inside the cave tomorrow is required

Run 63 going - beam only background

Right arm at 64.60 mm

Left arm IN at 36.54 mm

MBS fakemotion script running

High rates on top left dssd again. Cycle left servo motor two times resolved issue

Rates OK. Temps OK.

  617   Tue Jun 11 12:26:07 2024 RSS, JS, JM, CBRun 62 - Beam optimization + Target change

Beam optimization and target change

  732   Tue Jun 10 09:57:50 2025 CB, JM, PJW, YuL, JGRun 62

10:58

As Run 61, no target for background.

200 keV/A

Saved the ASIC settings for currently running. I made a mistake and overwrote the 2025APR08 settings.

Current settings have aida13-16 set to MEC channel and slow comparator set to 0x64.

All ither channels set to 0xc slow comparator.

 

Energy changed to 150 keV/A a few minutes before the end of this run. No storage. Waiting for the new beam.

  616   Tue Jun 11 08:34:50 2024 JM, RSS, JSRun 61 - beam on target

New run 61

Right arm at 64.60 mm

Left arm IN at 36.54 mm

MBS working - hopefully

Target 4E11

Injection ca. 3E7

horizontal beam position 8.75 mm

vertical beam position  -5mm

Changed electron cooler set point to 244.95 V

Read value 244.4 V

Collector current 4.31A

Histograms and statistics zero'd. Code reset

Rates OK. Temps OK.

10:24

We lost the beam for 5 minutes. No counting spike observed when we got it back.

1L10

We lost the beam again for 5 minutes, but no counting spike obsevered when we got it back.

 

11:50


      DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats - attachment 3

      per FEE64 Rate spectra - attachment 4
      
      Beam intensity - ~ 3.3E7 pps

      Target density - 5.14E11 atoms/cm2

 

12:00 - 12:40

Large fluctuations in the target pressure, going down to 1e-9. We increased the temperature a little but it did not solve the problem.

Increased pressure 0.5 K more. Seems more stable

 

13:09

FEEs on det 2 stopped working. Checkloaded. Fixed.

No beam.

  615   Tue Jun 11 04:36:17 2024 CB, RSS, JSRun 60 - as 59, left servo in

05:36

Run started.

Conditions as before, except left servo now really in.

 

06:24

Run continues OK, file R60_9

Temps OK. Stats OK. Merger OK. Write to disk OK.

System wide checks as usual.

 

07:30


      DSSSD bias & leakage current OK - attachment 4

      FEE64 temperatures OK - attachment 5

      ADC data item stats - attachment 6

      per FEE64 Rate spectra - attachment 7
      
      Beam intensity - ~ 4.8E7 pps

      Target density - 7.25E11 atoms/cm2
      

 

9:20


      DSSSD bias & leakage current OK - attachment 8

      FEE64 temperatures OK - attachment 9

      ADC data item stats - attachment 10

      per FEE64 Rate spectra - attachment 11
      
      Beam intensity - ~ 4E7 pps

      Target density - 7E11 atoms/cm2
      

 

  614   Mon Jun 10 20:31:12 2024 JM, AK, EH, CBRun 59 Beam on target

21:32

New run 59

Right arm at 64.60 mm

Left arm IN at 36.54 mm

MBS working - hopefully

Target 4.7E11

Injection ca. 4E7

horizontal beam position 8.75 mm

vertical beam position  -5mm

Changed electron cooler set point to 244.85 V

Read value 244.3 V

Collector current 4.31A

Histograms and statistics zero'd. Code reset

Rates OK. Temps OK.

22:44

Screenshots of the above

 

23:00

Detector 0 shows usual strong noise. Shook twice. Fixed it. Beam loss in correspondence with this event.

Beam mostly recovered a few minutes later.

23:28

Detector 0 shows noise. Shook twice with servo. No result. Shook with pneumatic. Fixed. Some beam instabilities again.

01:00

Temps OK. Rates OK.

Merger OK. Write to disk OK (file 59_13)

01:36

Detector 0 shows usual strong noise. Shook it. Fixed it.

01:46

Detector 0 shows noise. Shook twice with servo. No result. Shook with pneumatic. Fixed.

The noise increase is definitely correlated with spikes in YRT1DT1MK current reading. Unclear what the reading is.

02:36

Target density has been consistentyl above 1E12 recently, very unstable and trending forward. Increased Lakeshore setpoint by 0.5 K.

Density decreases to high 1E11, and appear significantly more stable. E1 pressure reading also decreasing to 1E-1 mbar.

Temps OK. Stats OK. Merger OK. Write to disk OK.

03:58

Temps OK. Stats OK. Merger OK. Write to disk OK.

Target still unstable and now a bit too low density. Trying to slowly lower the temperature in 0.1 K steps.

04:55

Temps OK. Stats OK. Merger OK. Write to disk OK.

Target around 6E11 atoms/cm2, with Lakeshore temperature at 30.8 K. Waiting for it to stabilise.

05:34

Detector 0 noisy. Shook. Fixed it.

Realised I had not moved the detector back at 01:46 after shaking it. Most of this run has been taken with detector 0 fully out, i.e. 18.86 mm.

Moving in and moving to a new run.

  728   Sun Jun 8 11:55:00 2025 EM, PC, JM, CB, EW, AY, CB, PJW, YuLRun 58,59,60, 61

12:52

Started Run 58 - Beam energy 200 keV/u.

Slow comparator threshold set to 0xc (130 keV) for all channels. Fast discriminators turned OFF for all channels by setting enable mask in discrinator control to 0xfffff. See attachments. 

D+ beam deuterium target. D+ beam energy is now 0.2 MeV/u. (beam calc calculation is 0.2037 MeV/u).

All four detectors positioned fully out and stationary.

Ring cycle time is 5 seconds.

Cooler read value = 117.58 V, 0.00178 mA

Target around 8.9E12 atoms/cm2

All checks ok!

Beam on ionisation profile monitor is lost quite rapidly and looks to increase in size quite a lot due to target interactions. We may have to look at lowering target density

Attachment 25 shows IPM with no target and attachment 26 shows IPM with the target 8e12 at/cm2. Compare also to attachment 12 (IPM with target at 2.6e12).  

14:20

Checks are ok!

15:25

Fees 13-16 switched to MEC and bias on DSSD4 switched off

All other checks ok

17:00

Target dropped to 1-2E12 atoms/cm2

All checks okay- 17:25

17:45

Moved nozzle from x=-1500 to x=-2000, density went from 1E12 to 3E12

Moved nozzle again at 18:00 from x=-2000 to x=-3000 in steps of 500, density at 4E12

18:45

Turned bias ON for dssd4 stable at V=10 but unstable at V=20 so bias turned back OFF

19:30

All checks ok!

IPM attached, target density 2.6 atoms/cm2 (attachment 12)

20:00

Tried moving the nozzle more as target density dropped to 2-3E12 again

Moved in 500 steps either side of x=-2500 but didn't improve, then moved in 100 steps from y=1600 to y=2300 and target density now 6E12 at x=-2500 and y=2300

Tried dssd4 again but only stable to V=20 so bias OFF 

21:50- All checks good, target density stable at 8E12

22:50- All checks fine (see attachments), target density at 6E12

00:10

Checks OK. Have zero'd statistics to see pause and resume statements over an hour.

Rates looks OK. ~140 c/h 3He, and ~80 c/h for 3H and 1H each.

Target has been stable at 7e12 at/cm2 for the last hour. 

02:10

Checks OK. See pause statements after 2 hours - attachment 27, very few overall.

03:07

Checks OK. Target (9-11)E12

 

04:06

Checks OK. Target (9-11)E12

 

07:00

Checks OK. Target 9.8E12

page AIDA/Check/Check.tml.  failed

ptoblem fixed

 

09:00

Checks OK. Target 8.9E12

 

10:32

No target data displayed for 10 minutes, but jet density unchanged. Restored display from remote access by M.L.

 

11:22

Storage data stopped and Faraday cup inserted to check the leakage current of Detector #4. Not good, current increases above 10 uA already at 40 V. 

11:29

HV Detector #4 swithced off, Faraday cup removed, data stored again.

 

11:35

Check OK. Target 8.6E12

 

13:06

Check OK. Target 7.5E12

 

15:00

Temperature check - aida03 returns "No response". No response for rates either. Merger looks fine for 3? Likely just happened.

Attempted to STOP the DAQ. All FEEs still going (refused to stop) and 3 in error. Decided to just turn all FEEs off.

Restored DAQ with no issues. 3 is working. Temperatures fine. Rates fine. Unclear what had happened.

Run59 is EMPTY. New run = run 60.

16:00, Full check, everything working after the restart

17:35  Full check, everything is working smoothly!

18:35: Full check, status -Okay.  thickness 5.7E12,

19:35: full ckeck! Status - OKAY, target theckness ~5E12

20:50 : Full check! status - okay

22:00 : Full check, status -okay. Target thickness 6.4E12

22:55 : Full check, status -okay! ------ target thickness 5.8E12

01:00 : Full check, all okay! 

04:00 : Full check, all okay! 

07:00 : Full check, all okay!

 

10:00

Attempted to change cooling to improve the beam. Changed cooling by 0.5V. Significant improvement in the IPM, but Rutherford goes down. Target missed?

Changed orbit bumps. Increased Rutherford. IPM is back to how it was. Rates are possibly slightly higher? Will attempt more systematically in the afternoon, when we change beam energy again.

Attempted to delay target on by 1 second. No significant changes in beam lifetime or rates. Can try systematically again in the afternoon.

Restored settings to how they were. Started new run 61.

Temps OK

Rates OK

Merger OK

Online histos look OK (did not reset)

 

Checks

Clock status

FEE64 module aida16 global clocks failed, 6
 Clock status test result: Passed 15, Failed 1

ADC calibration

FEE64 module aida16 failed
Calibration test result: Passed 15, Failed 1

White Rabbit decoder

   
         Base         Current     Difference
aida14 fault      0xbf08 :      0xbf08 :      0  
aida14 : WR status 0x10
 White Rabbit error counter test result: Passed 15, Failed 1

Understand the status reports as follows:-
Status bit 3 : White Rabbit decoder detected an error in the received data
Status bit 2 : Firmware registered WR error, no reload of Timestamp
Status bit 0 : White Rabbit decoder reports uncertain of Timestamp information from WR

FPGA Timestamp error counter test result: Passed 16, Failed 0

 

 

  612   Mon Jun 10 14:26:52 2024 EH, AKRun 58

15:30

Merger OK, Tape server OK

ADC data item statistics OK

FEE temperatures look OK

System checks OK

20:20

Merger OK, Tape server OK

ADC data item statistics OK

FEE temperatures look OK

System checks OK

  608   Sun Jun 9 22:14:23 2024 TD, PM, AGRun 56 - Data taking
23:15 New run 56 with

      Right arm at 64.60 mm

      Left arm IN at 36.54 mm

      MBS working - hopefully

      Target 4E11

      Injection ca. 4E7

      horizontal beam position 8.75 mm

      vertical beam position  -5mm
   
      Changed electron cooler set point to 244.3 V

      Read value 243.757 V

      Collector current 4.31A

      Rates OK. Temps OK

00.30 DAQ continues file G22-201/R56_9

      DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats - attachment 3

      per FEE64 Rate spectra - attachment 4

      Merger etc - attachment 5

      DSSSD bias & leakage current log, CRYRING hall ambient temperature log - attachments 6-7

01.30 Photographs of current CRYRING controls - attachments 8-14


01.30 DAQ continues file G22-201/R56_14

      DSSSD bias & leakage current OK - attachment 15

      FEE64 temperatures OK - attachment 16

      ADC data item stats - attachment 17

      per FEE64 Rate spectra
       aida16 asics # 1 & # 2 HEC data - attachment 18
       aida16 ASIC load check x2 restores normal operation - attachment 19

      target 5e+11 stable, beam 4e+7 stable 

02.45 beam off - reported to HKR

      DAQ continues file G22-201/R56_16

03.00 beam back

      beam 4e+7 stable, target 5e+11 stable

      DSSSD bias & leakage current OK - attachment 20

      FEE64 temperatures OK - attachment 21

      ADC data item stats - attachment 22

      per FEE64 Rate spectra - attachment 23


04.20 DAQ continues file G22-201/R56_21

      DSSSD bias & leakage current OK - attachment 24

      FEE64 temperatures OK - attachment 25

      ADC data item stats - attachment 26

      per FEE64 Rate spectra - attachments 27

      Cycle L DSSSDs per https://elog.ph.ed.ac.uk/CARME/603


06.04 DAQ continues file G22-201/R56_21

      DSSSD bias & leakage current OK - attachment 28

      FEE64 temperatures OK - attachment 29

      ADC data item stats - attachment 30

      per FEE64 Rate spectra - attachments 31

      beam 4e+7 stable, target 4e+11 stable