Fri Jun 14 13:45:21 2024, JM, JS, CB, TD, EH, Run 70 - beam on target 7x
|
14:45
New run 70 - beam on target with definite target overlap
Cooler voltage setpoint 247.3 V. |
Thu Jun 12 06:20:50 2025, JM, Run 68,69 - background 
|
07:20
Started a background run while the cave is open.
All ASIC settings remain unchanged, we just have no beam. |
Fri Jun 14 10:21:24 2024, JS, TD, Run 68 9x
|
Frank has been tuning the beam since 08:00
detectors moved fully out
11:20 |
Thu Jun 13 21:07:30 2024, LCS, US, Run 67- beam on target 7x
|
22:05
The energy is changed to 247.4 V.
Read back value is 246.849 V. |
Thu Jun 13 23:01:07 2024, RSS, JS, EH, Run 67 - Night shift 20x
|
Run 67
00:01
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats OK - |
Wed Jun 11 10:13:42 2025, EW, CB, PJW, AR, JM, Run 67 14x
|
As run 66, optimisation of beam completed
DSSD4 now working and thresholds to 0x30 (480keV), switched to LEC
Tape service at 1.7MB/s |
Wed Jun 11 08:37:48 2025, CB, PJW, Run 66 
|
09:38
As Run 65, no changes, CRYRING operators attempting to improve beam intensity.
We should be able to keep running while they do, but there is a chance of some missed injections or other oddities. |
Thu Jun 13 09:48:25 2024, TD, LCS, Run 65 - beam on target 14x
|
10:47
The energy is changed to 247.4 V.
Read back value is 246.849 V. |
Tue Jun 10 22:38:59 2025, JM, CB, PJW, Run 65 7x
|
23:40
Offline anlaysis shows two clear peaks for DSSD1 and 2 at very low energies close to the threshold. One must be elastics and the other a noise
peak. |
Thu Jun 13 06:21:53 2024, TD, LCS, Run 64 - contd 13x
|
07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment 1
|
Thu Jun 13 00:50:33 2024, JM, JS, Run 64 - beam on target
|
01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
Tue Jun 11 21:16:50 2024, TD, Run 63 continued 17x
|
Run 63 continued
22.06 DSSSD bias & leakage current OK - attachment 1
|
Tue Jun 11 20:10:25 2024, JM, Run 63 - Beam only background
|
21:00
Claude has achieved optimal cooling parameters for the beam
No target and internal work inside the cave tomorrow is required |
Tue Jun 11 12:26:07 2024, RSS, JS, JM, CB, Run 62 - Beam optimization + Target change
|
| Beam optimization and target change |
Tue Jun 10 09:57:50 2025, CB, JM, PJW, YuL, JG, Run 62
|
10:58
As Run 61, no target for background.
200 keV/A |
Tue Jun 11 08:34:50 2024, JM, RSS, JS, Run 61 - beam on target   
|
New run 61
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
Tue Jun 11 04:36:17 2024, CB, RSS, JS, Run 60 - as 59, left servo in 11x
|
05:36
Run started.
Conditions as before, except left servo now really in. |
Mon Jun 10 20:31:12 2024, JM, AK, EH, CB, Run 59 Beam on target 18x
|
21:32
New run 59
Right arm at 64.60 mm |
Sun Jun 8 11:55:00 2025, EM, PC, JM, CB, EW, AY, CB, PJW, YuL, Run 58,59,60, 61 50x
|
12:52
Started Run 58 - Beam energy 200 keV/u.
Slow comparator threshold set to 0xc (130 keV) for all channels. Fast discriminators turned OFF for all channels by setting enable mask in discrinator |
Mon Jun 10 14:26:52 2024, EH, AK, Run 58 8x
|
15:30
Merger OK, Tape server OK
ADC data item statistics OK |