AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 12 of 38  ELOG logo
Entry  Fri Jun 14 13:45:21 2024, JM, JS, CB, TD, EH, Run 70 - beam on target 7x
14:45

New run 70 - beam on target with definite target overlap

Cooler voltage setpoint 247.3 V.
Entry  Thu Jun 12 06:20:50 2025, JM, Run 68,69 - background Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png
07:20

Started a background run while the cave is open.

All ASIC settings remain unchanged, we just have no beam.
Entry  Fri Jun 14 10:21:24 2024, JS, TD, Run 68 9x
Frank has been tuning the beam since 08:00

detectors moved fully out

11:20
Entry  Thu Jun 13 21:07:30 2024, LCS, US, Run 67- beam on target 7x
22:05

The energy is changed to 247.4 V.

Read back value is 246.849 V.
Entry  Thu Jun 13 23:01:07 2024, RSS, JS, EH, Run 67 - Night shift 20x
Run 67

00:01


      DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats OK -
Entry  Wed Jun 11 10:13:42 2025, EW, CB, PJW, AR, JM, Run 67 14x
As run 66, optimisation of beam completed

DSSD4 now working and thresholds to 0x30 (480keV), switched to LEC

Tape service at 1.7MB/s
Entry  Wed Jun 11 08:37:48 2025, CB, PJW, Run 66 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png
09:38

As Run 65, no changes, CRYRING operators attempting to improve beam intensity.

We should be able to keep running while they do, but there is a chance of some missed injections or other oddities.
Entry  Thu Jun 13 09:48:25 2024, TD, LCS, Run 65 - beam on target 14x
10:47

The energy is changed to 247.4 V.

Read back value is 246.849 V.
Entry  Tue Jun 10 22:38:59 2025, JM, CB, PJW, Run 65 7x
23:40

Offline anlaysis shows two clear peaks for DSSD1 and 2 at very low energies close to the threshold. One must be elastics and the other a noise
peak.
Entry  Thu Jun 13 06:21:53 2024, TD, LCS, Run 64 - contd 13x
07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2

07.24 DSSSD bias & leakage current OK - attachment 1
Entry  Thu Jun 13 00:50:33 2024, JM, JS, Run 64 - beam on target 
01:50

Right arm at 64.60 mm

Left arm IN at 36.54 mm
Entry  Tue Jun 11 21:16:50 2024, TD, Run 63 continued 17x
Run 63 continued

22.06 DSSSD bias & leakage current OK - attachment 1
Entry  Tue Jun 11 20:10:25 2024, JM, Run 63 - Beam only background 
21:00

Claude has achieved optimal cooling parameters for the beam

No target and internal work inside the cave tomorrow is required
Entry  Tue Jun 11 12:26:07 2024, RSS, JS, JM, CB, Run 62 - Beam optimization + Target change 
Beam optimization and target change
Entry  Tue Jun 10 09:57:50 2025, CB, JM, PJW, YuL, JG, Run 62 
10:58

As Run 61, no target for background.

200 keV/A
Entry  Tue Jun 11 08:34:50 2024, JM, RSS, JS, Run 61 - beam on target Screenshot_from_2024-06-11_11-47-57.pngScreenshot_from_2024-06-11_11-48-20.pngScreenshot_from_2024-06-11_11-48-32.pngScreenshot_from_2024-06-11_11-48-44.png
New run 61

Right arm at 64.60 mm

Left arm IN at 36.54 mm
Entry  Tue Jun 11 04:36:17 2024, CB, RSS, JS, Run 60 - as 59, left servo in 11x
05:36

Run started.

Conditions as before, except left servo now really in.
Entry  Mon Jun 10 20:31:12 2024, JM, AK, EH, CB, Run 59 Beam on target 18x
21:32

New run 59

Right arm at 64.60 mm
Entry  Sun Jun 8 11:55:00 2025, EM, PC, JM, CB, EW, AY, CB, PJW, YuL, Run 58,59,60, 61 50x
12:52 

Started Run 58 - Beam energy 200 keV/u.

Slow comparator threshold set to 0xc (130 keV) for all channels. Fast discriminators turned OFF for all channels by setting enable mask in discrinator
Entry  Mon Jun 10 14:26:52 2024, EH, AK, Run 58 8x
15:30

Merger OK, Tape server OK

ADC data item statistics OK
ELOG V3.1.3-7933898