Thu Feb 8 17:11:50 2024, CB, EH, Pulser walkthrough 
|
17:30 File G22-88/R8
Pulser walkthrough
EGG Ortec 448 Pulser
Amplitide 90,000-10,000 @ 10,000 step
Normalise 5.0
Attenuators x5 IN
t_r
100ns
Tau_d 50us
Frequency Int Osc 50Hz
Polarity + ( - polarity via Cooknell SA1 Sum & Invert Amp )
18:10 Moved to new run R9
Pulser off. Overnight background. |
Thu Feb 8 14:59:59 2024, JM, TD, Change p+n FEE64 settings
|
ASIC settings for the pn FEEs has been reset to the default aida settings. This was done to combat the observed dropping of several channels in pn only
FEE modules
following motors movement. This effect was also observed in 2022 in several pulser walkthroughs conducted pre and post detector movement. No dropped channels |
Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024
|
EMERGENCY SHUTDOWNS
1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)
2. Internal target: |
Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift  
|
14:50
Temperature, Statistics fine (see screenshots). |
Wed Feb 7 10:09:14 2024, CB, JG, EM, Morning Shift   
|
11:00
Changed slow comp threshold to 0x32 (500 keV). Checkloaded.
|
Tue Feb 6 09:39:54 2024, CB, Detector bias tests 13x
|
10:30 Found ADC#4 on aida 1 and 4 are suddenly noisy. See attach 1-2. Checkloaded multiple times - no effect.
Leakage current overnight was stable, but a clear transient can be observed yesterday around the times of the DSSD motion test. We did not observe
this in the cave looking at the CAEN module - it might have been too fast. |
Mon Feb 5 20:15:31 2024, CB, TD, Detector move in/out signals
|
17.43 setup signals from detector movement controller.
See attachment 1
|
Mon Feb 5 19:43:52 2024, CB, TD, ML, BuTIS reference for VETAR2  
|
16.40 CB/ML install fibre optic cable from patch panel beneath dipole downstream of YR09/CARME chamber to VETAR2 front panel fibre connector - see attachments
1 & 2.
|
Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 
|
13.41 DAQ start - file G22-88/R4
|
Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
|
06.40 DAQ continues file G22-88/R3_42
DSSSD bias OK - attachment 1
|
Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
|
09.30 DAQ continues file G22-88/R3_17
DSSSD bias OK - attachment 1
|
Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk
|
1. Check Proxy server is correct
localhost : 8080
incoming connections 7070 |
Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x
|
01.07 DAQ continues file G22-88/R1_46
background alpha
|
Fri Feb 2 09:58:58 2024, TD, TapeServer not writng data to disk - plus fix 7x
|
DAQ and NewMerger appear to be cofigured correctly.
Can allocate device, create volume and open file with TapeServer but cannot write data.
|
Fri Feb 2 08:59:36 2024, JM, TD, CB, Run1 start - pulser widths spreadsheet 20x
|
Current pulser widths excel spreadsheet attached
09.58 DSSSD bias OK - attachment 1
|
Thu Feb 1 14:45:09 2024, JM, CB, NewMerger setup
|
To include alll 16 FEE modules in the NewMerger we edited the file /MIDAS/DB/EXPERIMENTS/MERGE/Options/carme-gsi from MERGE.LinksAvailable string 5 to
MERGE.LinksAvailable string 15
We also edited the file /MIDAS/Linux/startup/NewMerger from ./master64 -i 8 -l 16 -p 11001 & to ./master64 -i 16 -l 16 -p 11001 |
Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
|
Arrived at the control room to find we had lost connection to the power relay. We rebooted the nnrpi1 and re-connected according to the steps laid out
in elog 471 -> all okay
11:00 Restarted daq with no changes to the system from yesterday. Bias consistent with previous days. All pulser peaks are slightly improved |
Wed Jan 31 09:49:38 2024, JM, TD, Optimising - Wednesday 31 25x
|
Removed ground from DSSD #1 to the chamber and set MACBs so that timestamp is from the NIM WR emulator not the VME VETAR2.
Root MACB mode 0x3 -> 0xd - all other MACB modes 0x3 ( unchanged ).
No timestamps observed from the emulator. Re-set to take timestamps from the VETAR" unit -> all timestamps observed. |
Tue Jan 30 14:04:30 2024, NH, [HowTo] Update MACB Firmware   
|
This is how to update the MACB firmware using the opensource tool xc3sprog
|
Tue Jan 30 09:14:50 2024, JM, TD, Tuesday 30 January 32x
|
09.00 CARME IE514 5.1e-11mbar
|