ID |
Date |
Author |
Subject |
Text |
 |
322
|
Mon Feb 28 05:04:47 2022 |
JM, OF | Temperature cycle to 125K | 06:01
Rutherford rate was decreased compared
to previous values. Max rate ~ 50 counts |
|
706
|
Fri May 30 21:49:08 2025 |
JM, NP, CB | Run 37 | 22:49
Run 37 started.
D+ beam deuterium target. D+ beam |
  |
270
|
Thu Feb 24 14:31:25 2022 |
JM, ML, CN | Beam Tuning Run 76 | 15:30
1.5 MeV/u beam currently being
tuned |
6x |
638
|
Sat Jun 15 21:14:56 2024 |
JM, JS, LC | Run 76 | 22:15
New run 76 - beam on target with
definite target overlap [coasting] |
|
629
|
Fri Jun 14 13:45:21 2024 |
JM, JS, CB, TD, EH | Run 70 - beam on target | 14:45
New run 70 - beam on target with
definite target overlap |
7x |
622
|
Thu Jun 13 00:50:33 2024 |
JM, JS | Run 64 - beam on target | 01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
|
637
|
Sat Jun 15 13:30:18 2024 |
JM, JS | Run 75 | 14:30
New run 75 - beam on target with
definite target overlap [coasting] |
  |
531
|
Mon Feb 19 08:45:22 2024 |
JM, JG, SHB, EM, EH | Run 44 - cooled beam on target | 09:43
Run 44 started cooled beam
on target |
35x |
515
|
Thu Feb 15 10:39:50 2024 |
JM, JG, ML, AG, CB | Run29 - beam optimisation | 11:27
Run 29 started. Beam energy is
1.3435 MeV/u with a cooler voltage of 751.3 |
|
711
|
Mon Jun 2 09:30:38 2025 |
JM, EW, ST | Run 41 | Run 41 started.
D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation |
6x |
577
|
Sun Jun 2 22:46:47 2024 |
JM, EM, NP | Run24 | 23:47
Run 24 started - Beam on target
Beam energy is 1.5 MeV. |
  |
572
|
Sat Jun 1 21:56:17 2024 |
JM, EM, EM, TY, CB, AG | Run 20 | 22:56
Run 20 started - beam on target
Beam energy is 1.5 MeV. Horizontal |
18x |
724
|
Sat Jun 7 10:06:27 2025 |
JM, EM, CB, DB, AY, PC, CB | Run 54 | 11:10
We have started a new run at the
same energy as R53 (250 keV/u) due to an |
50x |
709
|
Sun Jun 1 07:46:34 2025 |
JM, EM, CB | Run 39 | 08:45
Run 39 started.
D+ beam deuterium target. D+ beam |
7x |
335
|
Mon Feb 28 22:34:51 2022 |
JM, EM | Current status | 23:35
Temperature setpoint = 116 K
Detector position IN, potentiometer |
    |
336
|
Mon Feb 28 23:54:02 2022 |
JM, EM | Current Status, Temperature cycle | 00:51
Temperature setpoint = 116 K
Detector position IN potentionmeter |
  |
337
|
Tue Mar 1 02:15:29 2022 |
JM, EM | Current status | 03:15
The nozzle motor control at the
target crashed, but operation has been restored. |
6x |
338
|
Tue Mar 1 03:19:50 2022 |
JM, EM | Temperature Cycle | 04:20
Did another temperature cycle (118
K -> 125 K -> 95 K -> 116 K) trying |
|
339
|
Tue Mar 1 03:34:28 2022 |
JM, EM | Current status | Temperature setpoint = 116 k
Detector IN potentiometer = 34.89
mm |
7x |
340
|
Tue Mar 1 04:07:31 2022 |
JM, EM | Temperature cycle | Have been unable to achieve decent target
density with temperature cycling so far.
Will attempt to go up to 300 k and back down |
|
|