AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 18 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  322   Mon Feb 28 05:04:47 2022 JM, OFTemperature cycle to 125K06:01

Rutherford rate was decreased compared
to previous values. Max rate ~ 50 counts
 2022-02-28_06-30-39-Exrate.png 
  706   Fri May 30 21:49:08 2025 JM, NP, CBRun 3722:49

Run 37 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png 
  270   Thu Feb 24 14:31:25 2022 JM, ML, CNBeam Tuning Run 7615:30

1.5 MeV/u beam currently being
tuned
 6x 
  638   Sat Jun 15 21:14:56 2024 JM, JS, LCRun 7622:15

New run 76 - beam on target with
definite target overlap [coasting]
 Screenshot_from_2024-06-15_22-16-53.png 
  629   Fri Jun 14 13:45:21 2024 JM, JS, CB, TD, EHRun 70 - beam on target14:45

New run 70 - beam on target with
definite target overlap
 7x 
  622   Thu Jun 13 00:50:33 2024 JM, JSRun 64 - beam on target01:50

Right arm at 64.60 mm

Left arm IN at 36.54 mm
  
  637   Sat Jun 15 13:30:18 2024 JM, JSRun 7514:30

New run 75 - beam on target with
definite target overlap [coasting]
 Screenshot_from_2024-06-15_15-53-57.pngScreenshot_from_2024-06-15_15-54-30.pngScreenshot_from_2024-06-15_15-54-55.png 
  531   Mon Feb 19 08:45:22 2024 JM, JG, SHB, EM, EHRun 44 - cooled beam on target09:43

Run 44 started cooled beam
on target
 35x 
  515   Thu Feb 15 10:39:50 2024 JM, JG, ML, AG, CBRun29 - beam optimisation11:27

Run 29 started. Beam energy is
1.3435 MeV/u with a cooler voltage of 751.3
  
  711   Mon Jun 2 09:30:38 2025 JM, EW, STRun 41Run 41 started.

D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation
 6x 
  577   Sun Jun 2 22:46:47 2024 JM, EM, NPRun2423:47

Run 24 started - Beam on target

Beam energy is 1.5 MeV.
 Screenshot_from_2024-06-02_23-53-00.pngScreenshot_from_2024-06-02_23-53-47.pngScreenshot_from_2024-06-02_23-56-22.png 
  572   Sat Jun 1 21:56:17 2024 JM, EM, EM, TY, CB, AGRun 2022:56

Run 20 started - beam on target

Beam energy is 1.5 MeV. Horizontal
 18x 
  724   Sat Jun 7 10:06:27 2025 JM, EM, CB, DB, AY, PC, CBRun 5411:10

We have started a new run at the
same energy as R53 (250 keV/u) due to an
 50x 
  709   Sun Jun 1 07:46:34 2025 JM, EM, CBRun 3908:45

Run 39 started.

D+ beam deuterium target. D+ beam
 7x 
  335   Mon Feb 28 22:34:51 2022 JM, EMCurrent status23:35

Temperature setpoint = 116 K

Detector position IN, potentiometer
 2022-02-28_23-40-14-xyTotal.png2022-02-28_23-39-56-Exrate.png2022-02-28_23-39-26-goodEvents.png2022-02-28_23-38-58-correlation8.png2022-02-28_23-38-31-ADCitems.png 
  336   Mon Feb 28 23:54:02 2022 JM, EMCurrent Status, Temperature cycle00:51

Temperature setpoint = 116 K

Detector position IN potentionmeter
 2022-03-01_00-57-44-Exrate.png2022-03-01_00-58-41-ExTotal.png2022-03-01_00-58-14-EyTotal.png 
  337   Tue Mar 1 02:15:29 2022 JM, EMCurrent status03:15

The nozzle motor control at the
target crashed, but operation has been restored.
 6x 
  338   Tue Mar 1 03:19:50 2022 JM, EMTemperature Cycle04:20

Did another temperature cycle (118
K -> 125 K -> 95 K -> 116 K) trying
  
  339   Tue Mar 1 03:34:28 2022 JM, EMCurrent statusTemperature setpoint = 116 k

Detector IN potentiometer = 34.89
mm
 7x 
  340   Tue Mar 1 04:07:31 2022 JM, EMTemperature cycleHave been unable to achieve decent target
density with temperature cycling so far.
Will attempt to go up to 300 k and back down
  
ELOG V3.1.4-unknown