AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 22 of 38  ELOG logo
Entry  Thu Feb 15 21:07:00 2024, JM, AB, AR, OF, Run33 - cooled beam on target 22x
Entry  Thu Oct 21 20:26:44 2021, JM TD, Thermocouple and Connector cables 10x
Entry  Mon Oct 18 16:25:11 2021, JM RSS TD, NEG rotation + cable removals Screenshot_20211018-174141_Signal.jpg20211018_111130.jpg20211018_100015.jpg
Entry  Wed Sep 29 13:13:51 2021, JM RSS PB(remotely), Detector frame assembley new_carrier_simple_holes.PDFScreenshot_20210929-110343_Telegram.jpg20210930_164625.jpg20210930_164650.jpg
Entry  Fri Sep 17 16:42:25 2021, JM RSS ML + OG, CARME Realignment + Thermocouple installation 8x
Entry  Mon Sep 20 11:45:45 2021, JM RSS ML, CARME installations 6x
Entry  Wed Sep 22 14:44:51 2021, JM RSS ML, CARME leak test + bakeout tent 20210922_145646.jpg20210922_145933.jpg20210922_151728.jpg20210922_152052.jpg20210922_152113.jpg
Entry  Thu Sep 23 13:31:12 2021, JM RSS ML, IE514 Gauge and Bakeout 20210923_113239.jpg20210923_134339.jpg20210923_134355.jpg20210923_135954.jpg
Entry  Fri Sep 24 08:47:36 2021, JM RSS CB(Remotely), Baking  
Entry  Mon Sep 27 17:53:35 2021, JM RSS , Baking Jacket upgrade + NEG controllers connected 20210927_151650.jpg20210927_151706.jpg20210927_151721.jpg20210927_170139.jpg
Entry  Thu Sep 16 15:24:29 2021, JM RSS, CARME vented + thermocouple feedthrough 1.jpg2.jpg3.jpg
Entry  Mon Oct 4 09:19:11 2021, JM RSS, Activation of NEG elements IMG_4880.JPGIMG_4881.JPGIMG_4882.JPGIMG_4883.JPG
Entry  Fri Sep 24 09:44:58 2021, JM ML, Vacuum gauge readout 
Entry  Sun Feb 18 00:16:55 2024, JM CB, Run 40 - night shift 15x
Entry  Tue Aug 18 11:26:26 2020, JM, Week ending Friday 14/08/20 Photo.zip
Entry  Wed Aug 19 16:44:39 2020, JM, Neg Installs Photos_(1).zip
Entry  Wed Sep 2 17:01:49 2020, JM, Bakeout started and valve installation Photos.zip
Entry  Fri Sep 4 15:48:25 2020, JM, Bakeout test completed 191214004923_temperatures.txtBakeout1.png
Entry  Wed Sep 9 21:01:48 2020, JM, Neg Feedthroughs Photos.zip
Entry  Wed Sep 16 17:46:36 2020, JM, Pumping of Chamber Photos.zip
ELOG V3.1.3-7933898