ID Date Authordown Subject Text Attachments
  518   Thu Feb 15 21:07:00 2024 JM, AB, AR, OFRun33 - cooled beam on target22:27

Run 33 started cooled beam on target.

Detectors IN (left arm pot =36.5
 22x 
  128   Thu Oct 21 20:26:44 2021 JM TDThermocouple and Connector cablesNEG pump electrical connections tested
- all connections sound. 

Detector carriers have been redrilled
 10x 
  127   Mon Oct 18 16:25:11 2021 JM RSS TDNEG rotation + cable removalsKapton cabling and the broken ceramic detector
holder have been separated. Required holding
jacking plate in a vice and using lots of
 Screenshot_20211018-174141_Signal.jpg20211018_111130.jpg20211018_100015.jpg 
  95   Wed Sep 29 13:13:51 2021 JM RSS PB(remotely)Detector frame assembley29/9/21

We have opened the cleaned parts
for assembley of the moving detector frames.
 new_carrier_simple_holes.PDFScreenshot_20210929-110343_Telegram.jpg20210930_164625.jpg20210930_164650.jpg 
  70   Fri Sep 17 16:42:25 2021 JM RSS ML + OGCARME Realignment + Thermocouple installationLaser surveying team worked till 11. Chamber
was too high by 3mm close to the jet target
and 6mm by the turbo pump (towards the dipole). 
 8x 
  72   Mon Sep 20 11:45:45 2021 JM RSS MLCARME installationsIon pump, RGA and additional gauge installed
on the chamber.

Our gauge is the one mounted above
 6x 
  75   Wed Sep 22 14:44:51 2021 JM RSS MLCARME leak test + bakeout tentOn 21/9/21 CARME was connected to the leak
tester. Leak testing showed no apparent leaks,
extra time required to reach <1e-4 mbar
 20210922_145646.jpg20210922_145933.jpg20210922_151728.jpg20210922_152052.jpg20210922_152113.jpg 
  76   Thu Sep 23 13:31:12 2021 JM RSS MLIE514 Gauge and BakeoutCARME setup checked by vaccum group this
morning. 

Both IE514 gauges de-gassed. To
 20210923_113239.jpg20210923_134339.jpg20210923_134355.jpg20210923_135954.jpg 
  79   Fri Sep 24 08:47:36 2021 JM RSS CB(Remotely)Baking Baking halted on 23/9/21 16:16 as connection
to TC08 module was lost. USB cable connection
to TC08 module appears to have been damaged
  
  88   Mon Sep 27 17:53:35 2021 JM RSS Baking Jacket upgrade + NEG controllers connectedAdditional baking jacket sections for the
turbo section arrived today. Baking was halted
at ~11:00 to allow for the chamber to cool
 20210927_151650.jpg20210927_151706.jpg20210927_151721.jpg20210927_170139.jpg 
  69   Thu Sep 16 15:24:29 2021 JM RSSCARME vented + thermocouple feedthroughChamber has been vented back to atmosphere. 

Motor was able to be pulled back
to insert bloacking pin once at atmosphere.
 1.jpg2.jpg3.jpg 
  105   Mon Oct 4 09:19:11 2021 JM RSSActivation of NEG elements9:30

Ion pumps de-gassed by switching
on and off multiple times. Large pressure
 IMG_4880.JPGIMG_4881.JPGIMG_4882.JPGIMG_4883.JPG 
  80   Fri Sep 24 09:44:58 2021 JM MLVacuum gauge readoutThe analog readout of the Combivac controller
for the IE514 ion gauge has been set up,
readings are plotted to http://web-docs.gsi.de/~lestinsk/vacplot.php.
  
  524   Sun Feb 18 00:16:55 2024 JM CBRun 40 - night shift01:17

Run 40 continues.

Beam intensity looks OK. Oscillates
 15x 
  2   Tue Aug 18 11:26:26 2020 JMWeek ending Friday 14/08/20Week ending friday 14/08/20

CARME chamber securely mounted
upon aluminium frame and support skis. Neg-ion
 Photo.zip 
  4   Wed Aug 19 16:44:39 2020 JMNeg InstallsInternal neg installs completed and electrically
checked. 
 Photos_(1).zip 
  5   Wed Sep 2 17:01:49 2020 JMBakeout started and valve installationInitial bakeout started which will run
until friday, temperature had reached 44
degrees when I left the lab. 
 Photos.zip 
  6   Fri Sep 4 15:48:25 2020 JMBakeout test completedBakeout test completed. Maximum temperature
reached within baking volume was 120
degrees, with baking stopped by the program
 191214004923_temperatures.txtBakeout1.png 
  7   Wed Sep 9 21:01:48 2020 JMNeg Feedthroughs4/6 of the neg feedthroughs installed.
Continuity between the power pins, ground
pin and the chamber has been checked, we
 Photos.zip 
  14   Wed Sep 16 17:46:36 2020 JMPumping of ChamberA pump cart and leak cart have been connected
to the chamber via the top turbo at the back
of the chamber. An air line has also been
 Photos.zip 