AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 26 of 38  ELOG logo
ID Date Author Subjectdown Text Attachments
  177   Thu Jan 27 15:19:18 2022 OH, JMEnabling internet access on the carme-gsi serverTo use both anydesk and firefox on the carme
server require an internet connection.
  
  613   Mon Jun 10 18:22:47 2024 JMElectron cooler calculationsIon beam energy is calculated using Beamcalc
(https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)

Electron current is set to 4.3
 space-charge-2.pngspace-charge-1.pngBeamCalc.png 
  445   Tue Sep 26 10:13:14 2023 TDELOTECH PID Temperature Controller R4000 manual ( German and English )   BA-Isoheat_R4000-XX-X-000-X-X_DE_V1.03.pdfR4000-XX-X-000-X-X_EN_V1.30.pdf 
  260   Wed Feb 23 20:06:43 2022 TD CNE141 kinematics
Assuming DSSSD is 1000um thick we can expect
to observe protons for E_lab=11MeV as follows
 E141_kinematics.txt 
  134   Sun Oct 31 07:29:17 2021 CB JM + RSS OGDetectors mounted on plate in CARME(Wed 27 October)

Dismounted plate from rod. Dismounted
broken detectors from plate and placed back
 8x 
  133   Sun Oct 31 07:21:09 2021 CB JM RSSDetectors arrived in GSI(Tue 26 October)

Two new CARME DSSD arrived in GSI
and collected. Visually inspected both sides.
 6x 
  405   Fri May 26 09:08:06 2023 JM, CBDetector movement Hopefully we will not be opening the chamber
for quite some time so find attached images
of all four installed detectors and a video
 20230525_135756.jpgdetector-movement-in.mp4 
  494   Mon Feb 5 20:15:31 2024 CB, TDDetector move in/out signals17.43 setup signals from detector movement
controller.
 20240205_174307.jpg 
  95   Wed Sep 29 13:13:51 2021 JM RSS PB(remotely)Detector frame assembley29/9/21

We have opened the cleaned parts
for assembley of the moving detector frames.
 new_carrier_simple_holes.PDFScreenshot_20210929-110343_Telegram.jpg20210930_164625.jpg20210930_164650.jpg 
  495   Tue Feb 6 09:39:54 2024 CBDetector bias tests10:30 Found ADC#4 on aida 1 and 4 are suddenly
noisy. See attach 1-2. Checkloaded multiple
times - no effect.
 13x 
  183   Tue Feb 1 14:43:20 2022 JM, TDDetector Bias, FEEsDetector is not biasing as it has in previous
tests. Last bias 15/1/22 see previous elogs,
max leakage current ~10 uA at 150V
 22-02-01_15-03-56_aida03pulserADCspectra.png2022-02-01_15-14-07_aida03_pulser_DAQserver.png2022-02-01_15-22-23aida03_waveforms_pulser.png2022-02-01_15-28-45aida03_waveforms_pulser2.png2022-02-01_15-54-57rates_aidaALL.png 
  184   Wed Feb 2 21:53:32 2022 JM, TDDetector BiasFEE mounts for 5,6,7,8 disassembled to
access adaptor boards. No sign of debris
which could cause short on adaptor boards. 
 20220202_110757.jpg20220202_193636.jpg20220202_193651.jpgmotion.png 
  678   Sun Apr 20 07:30:29 2025 CBDSSD leakage currents over EasterJust after midnight on 20/04 it appears
DSSD #4 leakage current has perfectly stabilised.
See attached.
 Screenshot_2025-04-20_083007.pngScreenshot_2025-04-20_193226.pngScreenshot_2025-04-21_085130.png 
  597   Fri Jun 7 15:53:35 2024 TDDSSD leakage current increase - temperature increase in CRYRING hallRe-increase in DSSSD leakage current c.
14-15.00 6.6.24 

There was a significant temperature
 Capture.PNG 
  533   Tue Feb 20 07:50:10 2024 JMDAQ restartDAQ restarted. Run46. All appears OK, aida01
shows high rates across ASIC 4 even with
no beam which could not be resolved via ASIC
  
  693   Tue May 27 05:03:41 2025 JMDAQ restart06:00

FEE modules power cycled.

No issues on power cycle restart.
 7x 
  221   Mon Feb 21 20:56:51 2022 SHB, JM, CB, OH (remotely)DAQ connection for ion currentsignals from ICT and CRYRADIO are now connected
to AIDA2 and AIDA5 respectively. ICT is set
to factor 200 and CRYRADIO to 40 for now.
 cry.jpg 
  748   Mon Jun 16 08:17:41 2025 JGD2 consumptionThe current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar.
  
  677   Fri Apr 18 16:18:33 2025 JMD+D BBN energies testD+D minimum energy Ecm = 150 keV which
corresponds to Ed=150 keV/u or Ed=300
keV. Therefore we need a threshold
 16x 
  341   Tue Mar 1 05:23:02 2022 JM, EMCurrent status 06:20

Servo motors moved to fully out
position as some work on the beam was neccessary.
 2022-03-01_06-42-53-ExRate.png 
ELOG V3.1.4-unknown