ID |
Date |
Author |
Subject |
Text |
 |
289
|
Sat Feb 26 23:20:13 2022 |
David, Pierre-Michell | Update status | In this last hour we have been playing
with the cryostat temperature as dictated
by Nikos, in order to have the target working |
7x |
290
|
Sun Feb 27 00:07:15 2022 |
David, Pierre-Michell | No beam, valve closed | At 00:37 we lost the beam due to a high
pressure burst in the tarjet which resulted
in a valve closed at YR09VV... |
|
291
|
Sun Feb 27 00:53:24 2022 |
David, Pierre-Michell | Current status | We have recovered the beam at 01:49, after
such a long time we had no target so we increased
from 80K to 120K at 01:52. 02:01 update 120K-->95K |
7x |
292
|
Sun Feb 27 01:46:56 2022 |
David, Pierre-Michell | Current status | So far looks like with a temperature of
95K the target is maintained with a reasonable
density throughout long periods of time. |
  |
293
|
Sun Feb 27 02:38:52 2022 |
David, Pierre-Michell | Current status | We have decreased the temperatur> 95K
--> 90K. At 95K the target was stable,
but let's try to increase the density |
   |
294
|
Sun Feb 27 03:49:36 2022 |
David, Pierre-Michell | Current status | 04:06 85K -->120K : 04:13 120K -->95K
current ring 8e7 p/s
Merger, Tape server (WS3): |
  |
295
|
Sun Feb 27 04:54:46 2022 |
David, Pierre-Michell | Current status | Ring current 8e7 particles/s
Merger, Tape server (WS3):
1664 kB/s writing ok |
  |
296
|
Sun Feb 27 05:45:53 2022 |
David, Pierre-Michell | Current status | 6:05: 95K-->120K
6:12: 120K --> 95K
Ring current 8e7 particles/s |
   |
357
|
Tue Mar 1 22:10:26 2022 |
David, George | Current status | Ring current 6.67e7 particles/s
pressure at S1: 2.3-2.8e-8
Merger, Tape server (WS3): |
   |
358
|
Tue Mar 1 23:30:04 2022 |
David, George | Current status | 00:30
Pressure in S1 slightly decreased
from before but still high enough to measure |
  |
359
|
Tue Mar 1 23:43:15 2022 |
David, George | Beam Intensity Drop | 00:38
Intensity in the ring dropped by 2
orders of magnitude to 5e5 on injection |
|
360
|
Wed Mar 2 01:24:48 2022 |
David, George | Ion Source Update | 02:25
Zoran was unable to ignite the ion
source. |
|
361
|
Wed Mar 2 03:40:40 2022 |
David, George | Temperature Cycle | 04:40
Target density is hovering between
2.0e-8 and 2.3e-8, sometimes dipping below |
|
239
|
Tue Feb 22 17:32:38 2022 |
David | Current status | Michael is modifying
the settings of the electron cooler -->
changed beam from bunched to coasting |
12x |
241
|
Tue Feb 22 19:11:18 2022 |
David | Current status | Still trying to recover previous pressures,
more details in the next entry.
Merger, Tape server (WS3) |
 |
584
|
Tue Jun 4 00:04:39 2024 |
DR, EH | Run 31 | Beam energy = 3 MeV
Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm. |
|
593
|
Thu Jun 6 05:44:45 2024 |
DR YL DB LB CB JM | Run 38 - 15N Tests | 06:45
All system checks OK
Target density 3.4e11 |
8x |
585
|
Tue Jun 4 06:56:02 2024 |
DFF, PC, LB, JM,NP,AB | Run 31 contd | 8:13
Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable |
 |
259
|
Wed Feb 23 19:22:55 2022 |
CN, TD | check |
- Motor checked , OK
SW3 |
10x |
261
|
Wed Feb 23 20:52:56 2022 |
CN, TD | System wide checks |
Attachments 1-5 aida01-aida05 options
|
11x |
|