Wed Feb 23 20:52:56 2022, CN, TD, System wide checks 11x
|
Attachments 1-5 aida01-aida05 options
|
Mon Jun 3 15:10:12 2024, CN, EM, CB, Run28   
|
16:10
We start a new run after doing some test with the motor. Injection time is now a 6s, moving of the motors is working fine.
Merger OK, Tape server OK |
Mon Jun 3 15:17:41 2024, CN, EM, CB, Run29    
|
16:15
In the previous run while working on the target it was discovered that the valve was closed! Probaly this happened around 10 am, we are not sure.
The gas target inlet valve is open again, working on the target. |
Mon Jun 3 21:37:20 2024, CN, EM, CB, Run30  
|
Beam energy = 3 MeV
Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7 |
Mon Feb 5 19:43:52 2024, CB, TD, ML, BuTIS reference for VETAR2  
|
16.40 CB/ML install fibre optic cable from patch panel beneath dipole downstream of YR09/CARME chamber to VETAR2 front panel fibre connector - see attachments
1 & 2.
|
Thu Feb 24 04:17:35 2022, CB, TD (remotely), MIDAS DAQ no longer working 
|
DAQ server crashed around 24:00
Rebooted server but could not could not rescue remotely - could not contact raspberry pi in control of FEE bias.
Entered cave, rebooted raspberry pi. Would not accept remote connections. |
Tue Oct 5 11:44:11 2021, CB, TD , SAES manuals & cable drawings 8x
|
NEG power
SIP power
UHV1400 operating instructions |
Mon Feb 28 14:42:48 2022, CB, TD, Cryostat set to 115K
|
Cryostat set to 115K |
Mon Feb 28 14:47:52 2022, CB, TD, Monday 28 February 15:00-23:00 17x
|
15.51 1.8.W spectra 20ms, 2ms, 200us, 20us FSR - attachments 1-8
|
Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk
|
1. Check Proxy server is correct
localhost : 8080
incoming connections 7070 |
Mon Feb 5 20:15:31 2024, CB, TD, Detector move in/out signals
|
17.43 setup signals from detector movement controller.
See attachment 1
|
Wed Mar 2 22:29:48 2022, CB, SD, Last shift with beam 9x
|
22:30 Shift handed over. DAQ OK. Target OK. Beam OK.
00:22 Temperatures OK |
Tue Jun 11 04:36:17 2024, CB, RSS, JS, Run 60 - as 59, left servo in 11x
|
05:36
Run started.
Conditions as before, except left servo now really in. |
Wed Jun 19 12:11:22 2024, CB, RSS, CARME status
|
DSSD off
FEEs off
Motors out, pin inserted, compressed air closed, power removed from motors box. |
Thu May 30 09:30:33 2024, CB, PW, YL, TD, Run 10 13x
|
10:30
Merger OK, Tape server OK
ADC data item statistics looks as before. OK |
Thu May 30 08:33:21 2024, CB, PW, YL, Run 8 & 9- detector motion tests 7x
|
09:34 - Moved to Run 9 in preparation of moving detectors. No target yet. Beam in the ring at 750 keV/A.
Temperatures OK (attach)
System wide checks OK except 16 fails clock and ADC calib |
Wed Jun 11 08:37:48 2025, CB, PJW, Run 66 
|
09:38
As Run 65, no changes, CRYRING operators attempting to improve beam intensity.
We should be able to keep running while they do, but there is a chance of some missed injections or other oddities. |
Thu Feb 24 05:09:47 2022, CB, PE, EM, Inlet valve at target closed + problems with turbopump
|
The turbo pump E1 is continuing to draw too much current and the rotation frequency has steadily decreased from 817 Hz at the beginning of the night
shift to 800 Hz now. The frequency recovered after the temperature was increased.
Both of the valves (inlet and dump) have been closed to improve the vacuum in the ring. |
Wed Aug 30 09:33:13 2023, CB, OG, NEG cables repaired 
|
Repaired Neg wires for D2000 with Oemer's help.
Cable #2 is fine.
In Cable #4, wires 1 and 2 are swapped but it's impossible this happened when the connector came apart. The pins are crimped and secured |
Wed Jun 19 12:06:50 2024, CB, OF, SS, Run 98/99/100 - higher energy
|
10:21 June 17
New energy: 1.125 MeV/u
Target in. Run 98 started. |