ID |
Date |
Author |
Subject |
Text |
 |
581
|
Mon Jun 3 15:10:12 2024 |
CN, EM, CB | Run28 | 16:10
We start a new run after doing
some test with the motor. Injection time |
   |
582
|
Mon Jun 3 15:17:41 2024 |
CN, EM, CB | Run29 | 16:15
In the previous run while working
on the target it was discovered that the |
    |
583
|
Mon Jun 3 21:37:20 2024 |
CN, EM, CB | Run30 | Beam energy = 3 MeV
Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm. |
  |
493
|
Mon Feb 5 19:43:52 2024 |
CB, TD, ML | BuTIS reference for VETAR2 |
16.40 CB/ML install fibre optic cable from
patch panel beneath dipole downstream of |
  |
264
|
Thu Feb 24 04:17:35 2022 |
CB, TD (remotely) | MIDAS DAQ no longer working | DAQ server crashed around 24:00
Rebooted server but could not could
not rescue remotely - could not contact raspberry |
 |
107
|
Tue Oct 5 11:44:11 2021 |
CB, TD | SAES manuals & cable drawings | NEG power
SIP power
UHV1400 operating instructions |
8x |
333
|
Mon Feb 28 14:42:48 2022 |
CB, TD | Cryostat set to 115K |
Cryostat set to 115K |
|
334
|
Mon Feb 28 14:47:52 2022 |
CB, TD | Monday 28 February 15:00-23:00 |
15.51 1.8.W spectra 20ms, 2ms, 200us, 20us
FSR - attachments 1-8
|
17x |
489
|
Sat Feb 3 15:05:10 2024 |
CB, TD | [How To] Restart Anydesk | 1. Check Proxy server is correct
localhost : 8080
incoming connections 7070 |
|
494
|
Mon Feb 5 20:15:31 2024 |
CB, TD | Detector move in/out signals | 17.43 setup signals from detector movement
controller.
|
|
368
|
Wed Mar 2 22:29:48 2022 |
CB, SD | Last shift with beam | 22:30 Shift handed over. DAQ OK. Target
OK. Beam OK.
|
9x |
615
|
Tue Jun 11 04:36:17 2024 |
CB, RSS, JS | Run 60 - as 59, left servo in | 05:36
Run started.
Conditions as before, except left |
11x |
658
|
Wed Jun 19 12:11:22 2024 |
CB, RSS | CARME status | DSSD off
FEEs off
Motors out, pin inserted, compressed |
|
563
|
Thu May 30 09:30:33 2024 |
CB, PW, YL, TD | Run 10 | 10:30
Merger OK, Tape server OK
ADC data item statistics looks |
13x |
562
|
Thu May 30 08:33:21 2024 |
CB, PW, YL | Run 8 & 9- detector motion tests | 09:34 - Moved to Run 9 in preparation of
moving detectors. No target yet. Beam in
the ring at 750 keV/A. |
7x |
736
|
Wed Jun 11 08:37:48 2025 |
CB, PJW | Run 66 | 09:38
As Run 65, no changes, CRYRING
operators attempting to improve beam intensity. |
 |
265
|
Thu Feb 24 05:09:47 2022 |
CB, PE, EM | Inlet valve at target closed + problems with turbopump | The turbo pump E1 is continuing to draw
too much current and the rotation frequency
has steadily decreased from 817 Hz at the |
|
436
|
Wed Aug 30 09:33:13 2023 |
CB, OG | NEG cables repaired | Repaired Neg wires for D2000 with Oemer's
help.
Cable #2 is fine. |
 |
656
|
Wed Jun 19 12:06:50 2024 |
CB, OF, SS | Run 98/99/100 - higher energy | 10:21 June 17
New energy: 1.125 MeV/u
Target in. Run 98 started. |
|
348
|
Tue Mar 1 12:58:32 2022 |
CB, MS, SS, ML | Synced pneumatic motion | New run R84
Attempting to sync pneumatic movement
with ring. Still see something on t out -> |
|
|