AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 30 of 38  ELOG logo
ID Date Authordown Subject Text Attachments
  581   Mon Jun 3 15:10:12 2024 CN, EM, CBRun2816:10

We start a new run after doing
some test with the motor. Injection time
 Screenshot_from_2024-06-03_16-12-44.pngScreenshot_from_2024-06-03_16-13-11.pngScreenshot_from_2024-06-03_16-14-11.pngScreenshot_from_2024-06-03_16-16-37.png 
  582   Mon Jun 3 15:17:41 2024 CN, EM, CBRun29 16:15

In the previous run while working
on the target it was discovered that the
 Screenshot_from_2024-06-03_18-04-47.pngScreenshot_from_2024-06-03_18-05-11.pngScreenshot_from_2024-06-03_18-06-09.pngScreenshot_from_2024-06-03_18-06-40.pngScreenshot_from_2024-06-03_20-35-00.png 
  583   Mon Jun 3 21:37:20 2024 CN, EM, CBRun30Beam energy = 3 MeV

Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm.
 Screenshot_from_2024-06-03_23-15-37.pngScreenshot_from_2024-06-03_23-16-18.pngScreenshot_from_2024-06-03_23-17-16.png 
  493   Mon Feb 5 19:43:52 2024 CB, TD, MLBuTIS reference for VETAR2
16.40 CB/ML install fibre optic cable from
patch panel beneath dipole downstream of
 20240205_173029.jpg20240205_172957.jpgScreenshot_from_2024-02-05_16-43-18.png 
  264   Thu Feb 24 04:17:35 2022 CB, TD (remotely)MIDAS DAQ no longer workingDAQ server crashed around 24:00

Rebooted server but could not could
not rescue remotely - could not contact raspberry
 Bad_Time_2022-02-24_04-34-12.pngBadTime_WRTime_2022-02-24_04-34-53.png 
  107   Tue Oct 5 11:44:11 2021 CB, TD SAES manuals & cable drawingsNEG power
SIP power
UHV1400 operating instructions
 8x 
  333   Mon Feb 28 14:42:48 2022 CB, TDCryostat set to 115K
Cryostat set to 115K
  
  334   Mon Feb 28 14:47:52 2022 CB, TDMonday 28 February 15:00-23:00
15.51 1.8.W spectra 20ms, 2ms, 200us, 20us
FSR - attachments 1-8
 17x 
  489   Sat Feb 3 15:05:10 2024 CB, TD[How To] Restart Anydesk1. Check Proxy server is correct

localhost : 8080

incoming connections 7070
  
  494   Mon Feb 5 20:15:31 2024 CB, TDDetector move in/out signals17.43 setup signals from detector movement
controller.
 20240205_174307.jpg 
  368   Wed Mar 2 22:29:48 2022 CB, SDLast shift with beam22:30 Shift handed over. DAQ OK. Target
OK. Beam OK.

 
 9x 
  615   Tue Jun 11 04:36:17 2024 CB, RSS, JSRun 60 - as 59, left servo in05:36

Run started.

Conditions as before, except left
 11x 
  658   Wed Jun 19 12:11:22 2024 CB, RSSCARME statusDSSD off

FEEs off

Motors out, pin inserted, compressed
  
  563   Thu May 30 09:30:33 2024 CB, PW, YL, TDRun 1010:30

Merger OK, Tape server OK

ADC data item statistics looks
 13x 
  562   Thu May 30 08:33:21 2024 CB, PW, YLRun 8 & 9- detector motion tests09:34 - Moved to Run 9 in preparation of
moving detectors. No target yet. Beam in
the ring at 750 keV/A.
 7x 
  736   Wed Jun 11 08:37:48 2025 CB, PJWRun 6609:38

As Run 65, no changes, CRYRING
operators attempting to improve beam intensity.
 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png 
  265   Thu Feb 24 05:09:47 2022 CB, PE, EMInlet valve at target closed + problems with turbopumpThe turbo pump E1 is continuing to draw
too much current and the rotation frequency
has steadily decreased from 817 Hz at the
  
  436   Wed Aug 30 09:33:13 2023 CB, OGNEG cables repaired Repaired Neg wires for D2000 with Oemer's
help.

Cable #2 is fine. 
 20230830_102519.jpg20230830_102514.jpg 
  656   Wed Jun 19 12:06:50 2024 CB, OF, SSRun 98/99/100 - higher energy10:21 June 17

New energy: 1.125 MeV/u

Target in. Run 98 started.
  
  348   Tue Mar 1 12:58:32 2022 CB, MS, SS, MLSynced pneumatic motionNew run R84

Attempting to sync pneumatic movement
with ring. Still see something on t out ->
  
ELOG V3.1.4-unknown