|
ID |
Date |
Author |
Subject |
Text |
 |
|
350
|
Tue Mar 1 16:57:34 2022 |
CB, LV, PMH | New run | Beam issues due to too long storage time
in the last hours. Motors moved out and not
moving. |
|
|
698
|
Tue May 27 22:20:11 2025 |
CB, LB,PW | Run 25 - 1.99/2.02 MeV/A | 23:20
JM thinks we cannot see 7Be locus
on run 24. Possibly the right arm cannot |
27x |
|
601
|
Sat Jun 8 10:13:52 2024 |
CB, JM, TD | Run 50/51 - data taking | 11:13
ML enabled ring signals remotely.
Used FakeMotion.dat (read FakeMotion.dat |
8x |
|
732
|
Tue Jun 10 09:57:50 2025 |
CB, JM, PJW, YuL, JG | Run 62 | 10:58
As Run 61, no target for background.
200 keV/A |
|
|
742
|
Thu Jun 12 15:33:17 2025 |
CB, JM, EM, JG, TD, AB, CF, AR | Run 74 | 16:34
Like Run 73, but particle detector
in YR10 now active, and recorded in MBS. |
27x |
|
32
|
Thu Oct 29 08:02:29 2020 |
CB, JM (remotely) | CARME pressure | Attached is the temperature plot for bakeout
period including tags for NEG activation
etc.
|
  |
|
389
|
Wed Apr 26 16:49:28 2023 |
CB, JM | CARME dolly mostly built | Disconnected cables from CARME motors and
turbo. The turbo has to go to allow Carme
to slide out. Crane may be required to lift |
  |
|
390
|
Thu Apr 27 19:43:23 2023 |
CB, JM | Preparing to open | Removed turbo pump and set aside in a box.
Considering switching to the other turbo
to avoid degradation due to lack of use. |
 |
|
391
|
Sat Apr 29 10:12:58 2023 |
CB, JM | CARME opened | (28 April)
Mounted rails on dolly. The rails
don't smoothly connect to those on the |
8x |
|
392
|
Sun Apr 30 10:01:39 2023 |
CB, JM | Left hand detectors unmounted | (29 April)
Inspected CARME after opening.
See attached. Some key takeaways. |
26x |
|
393
|
Mon May 1 08:26:09 2023 |
CB, JM | Left hand detectors remounted | (31 April)
Remounted 3335-12 on top and new
3335-1 on bottom of left hand plate. Used |
|
|
394
|
Mon May 1 18:21:18 2023 |
CB, JM | All detectors mounted | Mounted four detectors on Carme ad well
as four cable harnesses.
|
  |
|
395
|
Tue May 2 15:02:09 2023 |
CB, JM | All detectors and harnesses mounted | Completed mounting harnesses and detectors.
The strain relief support for the
bottom most two detectors on the feedthrough |
   |
|
457
|
Thu Jan 4 13:15:10 2024 |
CB, JM | Tent removed - bias test | Removed tent, octagon, Neg cables.
Disconnected and removed Baking
Pi, TC08, thermocouples. |
|
|
459
|
Sun Jan 7 15:38:57 2024 |
CB, JM | Manifolds mostly assembled + bias overnight check | Assembled most of the connectors on the
new (green) manifolds. Two blanking pulgs
stuck when mounting - cannot remove them |
|
|
460
|
Mon Jan 8 19:27:36 2024 |
CB, JM | Leak current tests overnight | Left bias in overnight. Leakage current
decreased and stabilised. See attached. Bias
off as we prepare to mount the fees. |
|
|
461
|
Mon Jan 8 19:29:57 2024 |
CB, JM | Manifold repaired + fee assembly in bench | Davide extracted the stuck blind plugs
and re-threaded all missing ports. Completed
manifold assembly, except for main inlet/outlet |
   |
|
462
|
Wed Jan 10 10:22:41 2024 |
CB, JM | Some FEEs mounted - issues with Det#2 (bottom left) | Started mounting some FEEs. We ran into
some mechanical issues due to the new ERNI
connectors on the new flexi-rigid adaptor |
 |
|
463
|
Wed Jan 10 19:27:08 2024 |
CB, JM | Manifold and more bias tests | Mounted water manifold on CARME with help
from GSI plumber. Connected all the hoses
with Swagelok self-locking connectors. Tested |
|
|
464
|
Thu Jan 11 19:57:20 2024 |
CB, JM | All FEE holders mounted | After discussions with Davide, changed
the holes in the FEE holders for the bottom-right
detector to slots in order to slightly change |
|