AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 32 of 36
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
702 Entries
Goto page
Previous
1
,
2
,
3
...
31
, 32,
33
,
34
,
35
,
36
Next
Selected entries:
ID
Date
Author
Subject
Text
82
Sat Sep 25 07:23:06 2021
CB (remotely)
CARME baking status -2
Current temperature ~90 C
However note setpoint is at 102 C. It appears
we are baking at full power, but too many
81
Fri Sep 24 15:36:34 2021
CB (remotely)
CARME baking status
Current temperature ~64 C
See plots attached
80
Fri Sep 24 09:44:58 2021
JM ML
Vacuum gauge readout
The analog readout of the Combivac controller
for the IE514 ion gauge has been set up,
readings are plotted to http://web-docs.gsi.de/~lestinsk/vacplot.php.
79
Fri Sep 24 08:47:36 2021
JM RSS CB(Remotely)
Baking
Baking halted on 23/9/21 16:16 as connection
to TC08 module was lost. USB cable connection
to TC08 module appears to have been damaged
78
Fri Sep 24 07:04:57 2021
RSS JM
IE 514 pin arrangement and degas instructions
Fabre (German)
Color (English)
grau
77
Thu Sep 23 14:19:27 2021
CB (remotely)
Checking baking remotely - instructions
1. Connect to pi on CRYRING local network
ssh pi@192.168.207.127
76
Thu Sep 23 13:31:12 2021
JM RSS ML
IE514 Gauge and Bakeout
CARME setup checked by vaccum group this
morning.
Both IE514 gauges de-gassed. To
75
Wed Sep 22 14:44:51 2021
JM RSS ML
CARME leak test + bakeout tent
On 21/9/21 CARME was connected to the leak
tester. Leak testing showed no apparent leaks,
extra time required to reach <1e-4 mbar
74
Wed Sep 22 08:30:08 2021
CB (remotely)
CARME pressure during first XHV test
CARME pressure moved to
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
73
Tue Sep 21 08:20:39 2021
ML
CARME installations
72
Mon Sep 20 11:45:45 2021
JM RSS ML
CARME installations
Ion pump, RGA and additional gauge installed
on the chamber.
Our gauge is the one mounted above
6x
71
Sun Sep 19 09:11:34 2021
CB (remotely)
Baking RasPi status
Accessed Pi remotely
( 1. Without the Internet, the Pi has no
70
Fri Sep 17 16:42:25 2021
JM RSS ML + OG
CARME Realignment + Thermocouple installation
Laser surveying team worked till 11. Chamber
was too high by 3mm close to the jet target
and 6mm by the turbo pump (towards the dipole).
8x
69
Thu Sep 16 15:24:29 2021
JM RSS
CARME vented + thermocouple feedthrough
Chamber has been vented back to atmosphere.
Motor was able to be pulled back
to insert bloacking pin once at atmosphere.
68
Sat Sep 11 16:01:44 2021
CB RSS
Preparations for shutdown
Found CARME pressure at 2E-7 mbar
Raspberry pi took pictures until 4 am and
67
Fri Sep 10 18:09:14 2021
CB RSS ML
Leak test + baking system test
Leak tested CARME via He leak tester + He
bottle. No leaks could be found. Some
66
Fri Sep 10 10:50:55 2021
CB RSS ML
Pressure after overnight pump down
Pressure found in 10-7 mbar range.
Decided to leak test anyway for safety.
65
Thu Sep 9 13:01:07 2021
CB RSS + OG
All feedthrough flanges mounted and motor rotated
Moved cables that touched neg pumps. See
photos. Please bear in mind perspective.
Note avoiding touching chamber
64
Wed Sep 8 17:03:07 2021
CB RSS + OG NB
Six feedthrough flanges mounted
Continued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a
23x
63
Wed Sep 8 10:52:54 2021
CB RSS + OG
First feedthrough flange mounted
Assembled feedthrough flange with re-cut
SS support bracket. M3 vented on the
sides, M3x30 partly threaded on top. Top
Goto page
Previous
1
,
2
,
3
...
31
, 32,
33
,
34
,
35
,
36
Next
ELOG V3.1.4-unknown