AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 32 of 34
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
661 Entries
Goto page
Previous
1
,
2
,
3
...
31
, 32,
33
,
34
Next
ID
Date
Author
Subject
Text
41
Thu Aug 12 09:16:42 2021
TD RSS
Thursday 12 August
Attachment 1 - IE414/514 feedthrough wiring
diagram
13x
40
Wed Aug 11 12:30:40 2021
TD RSS
Wednesday 11 August
Attachments 1 & 2 - 2x SAES D-2000 re-fitted
to side ports
8x
39
Tue Aug 10 12:22:56 2021
TD RSS
Tuesday 10 August
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests
38
Mon Aug 9 12:36:00 2021
TD, RSS, ABD
Monday 9 August
Attachments 1-5 - CARME shipment in CRYRING
hall
7x
37
Mon Dec 7 14:29:12 2020
JM
CARME packing up
36
Fri Dec 4 16:49:36 2020
TD
Friday 4 December
7x
35
Wed Nov 25 10:39:37 2020
TD
Wednesday 25 November
10.39
7x
34
Tue Nov 24 12:24:01 2020
JM
RGA scans
RGA laptop passcode: tw%11&STA-
RGA scans set up and plotting data
33
Tue Nov 10 12:25:29 2020
JM
Cable harnesses
The length of the wire needed was estimated
with the aid of a scale image of the detectors
in the CARME chamber and foam model pieces.
32
Thu Oct 29 08:02:29 2020
CB, JM (remotely)
CARME pressure
Attached is the temperature plot for bakeout
period including tags for NEG activation
etc.
31
Wed Oct 28 10:41:57 2020
TD
Wednesday 28 October
10.32
6x
30
Mon Oct 26 10:35:05 2020
JM, CB(remotely)
Cooling
10:10 Pressure on the chamber = 3.1e-8mbar.
RE-72 temperatures are ~120-125C with set
limits at 80C. D2000 temperatures are
29
Thu Oct 22 22:15:00 2020
CB (remotely)
Cooling down after first NEG activation
Thu 22 October
22:15 Temperatures stables, slowly decreasing.
7x
28
Thu Oct 22 10:39:40 2020
TD
Thursday 22 October
10.40
19x
27
Mon Oct 19 13:57:52 2020
JM
Neg Activation
Neg and Neg-Ion pumps have been connected
up to the control modules. Controller on
the right is connected to the D-2000s. Middle
26
Mon Oct 12 10:49:36 2020
JM
First Bakeout of CARME with pumps (cont)
12 October
10:00 Bakeout temperatures stable.
Pressure on the backing line is 3e-7mbar
25
Mon Oct 5 08:21:40 2020
CB (remotely), JM
First bake of CARME with pumps (cont.)
5 OCTOBER
08:21 Temperatures stable overnight. See
6x
24
Wed Sep 30 08:10:36 2020
CB (remotely)
First bake of CARME with pumps
(NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
19x
23
Mon Sep 28 13:04:27 2020
JM
Baking
I have (fingers crossed) got the baking
stepping up nicely now. I have used some
of the outer shell to act as a shield and
22
Sat Sep 26 09:31:46 2020
JM, CB (both remotely)
Baking over weekend
Sat 26 Sep
09:15 Baking started automatic
mode
Goto page
Previous
1
,
2
,
3
...
31
, 32,
33
,
34
Next
ELOG V3.1.4-unknown