ID |
Date |
Author |
Subject |
Text |
 |
14
|
Wed Sep 16 17:46:36 2020 |
JM | Pumping of Chamber | A pump cart and leak cart have been connected
to the chamber via the top turbo at the back
of the chamber. An air line has also been |
|
13
|
Wed Sep 16 08:52:03 2020 |
CB (remotely) | Baking status 16-17 September | 16 September
08:50
|
    |
12
|
Tue Sep 15 08:39:26 2020 |
CB (remotely), JM | Baking and Chamber status | Tuesday 15 September
08:40
|
    |
11
|
Mon Sep 14 12:07:40 2020 |
JM, CB (remotely) | Baking status | Mon 14 Sep 09:50
Jordan moved the TC08 picolog 2 away from |
   |
10
|
Sun Sep 13 08:06:25 2020 |
CB (remotely) | Baking over the weekend -2 | Sun 13 Sep 08:06
Baking reached 93 C yesterday afternoon at |
 |
9
|
Sat Sep 12 08:38:52 2020 |
CB (remotely) | Baking over the weekend | Saturday 12 Sep 08:43
Remotely checked status of baking. See attached.
|
 |
8
|
Thu Sep 10 11:34:30 2020 |
TD, JM | Thursday 10 September | All neg feed-throughs have now been fully
installed, with ground tags
and power wires crimped and attached to the |
  |
7
|
Wed Sep 9 21:01:48 2020 |
JM | Neg Feedthroughs | 4/6 of the neg feedthroughs installed.
Continuity between the power pins, ground
pin and the chamber has been checked, we |
|
6
|
Fri Sep 4 15:48:25 2020 |
JM | Bakeout test completed | Bakeout test completed. Maximum temperature
reached within baking volume was 120
degrees, with baking stopped by the program |
 |
5
|
Wed Sep 2 17:01:49 2020 |
JM | Bakeout started and valve installation | Initial bakeout started which will run
until friday, temperature had reached 44
degrees when I left the lab. |
|
4
|
Wed Aug 19 16:44:39 2020 |
JM | Neg Installs | Internal neg installs completed and electrically
checked. |
|
3
|
Tue Aug 18 17:35:20 2020 |
TD | SAES UHV1400 pin assignment | Using a digital multimeter confirmed continuity
for SAES-supplied
power cable (Amphenol (circular) 6-pin plug |
    |
2
|
Tue Aug 18 11:26:26 2020 |
JM | Week ending Friday 14/08/20 | Week ending friday 14/08/20
CARME chamber securely mounted
upon aluminium frame and support skis. Neg-ion |
|
1
|
Mon Aug 17 08:16:16 2020 |
TD | CARME Elog |
Test |
|