Entry  Sat Oct 9 09:44:36 2021, CB RSS, Heaters removed + motors tests 
Removed thermocouples, heaters, RE72 modules and leftover baking tent. Support octagon removed except topmost part which requires disconnecting pneumatic
hoses going to top gate valve. To be done on Monday with ML assistance.

Attempted to move servo motors once more - did not work. The motors appear stuck but it is not clear how or where. Removed screws on flanged
Entry  Fri Oct 8 17:56:35 2021, CB RSS, Motors test 20211008_184731.jpg20211008_184731.jpg
Attempted first motor test in XHV. Wired and connected limit switches and string potentiometer.

Set up raspberry pi to control motors (.124). Set up pi for remote headless access.

Moved jumper on Teknic hub from 1 to 2 motors configuration.
Entry  Thu Oct 7 08:40:09 2021, CB RSS, CARME in XHV 
CARME reached 9E-12 this morning

Ion pumps on
Entry  Wed Oct 6 15:36:14 2021, CB RSS, Neg activation tests -3 
Attempted to activate 2xUHV1400 connected to bottom C4, channel #2 using P 200 W, t rise 30 min, t hold 90 min.
Temperature of Kapton bundle increased drastically to 160+ C. Had to stop. Conclusion is that these are likely
the two UHV1400 on the bottom of CARME, immediately in front of the Kapton bundle.
Entry  Wed Oct 6 09:47:30 2021, CB RSS, Neg activation tests -2 
Attempted activating 2xUHV1400 connected to top C4, channel #3 with P 300 W (450 C?), t rise 30 min, t hold 90
min as yesterday
Entry  Wed Oct 6 09:39:59 2021, PB CB, Original dirty assembly of CARME internals 7x
PB found pictures of the original dirty assembly, before screws and components were shipped to DL.
See attached.
Entry  Tue Oct 5 17:30:01 2021, CB RSS, NEG activation tests 20211005_131259.jpg20211005_171403.jpg20211005_161317.jpg
Found D2000 #1 activated and at 250C (25W) 
to prevent getting dirty when other NEGs 
are activated. See previous entries.
Entry  Tue Oct 5 11:44:11 2021, CB, TD , SAES manuals & cable drawings 8x
NEG power
SIP power
UHV1400 operating instructions
Entry  Mon Oct 4 20:30:46 2021, RSS JM CB (remotely), CARME baking status -21 Screenshot_from_2021-10-04_21-28-28.pngScreenshot_from_2021-10-04_21-29-37.png

Current temperature ~95 C (on manual mode)
See plot and screen attached.

Current pressure 2.86E-10
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Mon Oct 4 09:19:11 2021, JM RSS, Activation of NEG elements IMG_4880.JPGIMG_4881.JPGIMG_4882.JPGIMG_4883.JPG
9:30

Ion pumps de-gassed by switching on and off multiple times. Large pressure increase the first time pumps were flashed, pressure recovers quickly
once pumps off. Subsequent flashing of ion pumps showed a significantly smaller pressure increase, unitl little increase was seen. 
Entry  Mon Oct 4 06:34:58 2021, RSS JM CB (remotely), CARME baking status -20 Screenshot_from_2021-10-04_07-33-14.pngScreenshot_from_2021-10-04_07-34-14.png

Current temperature ~110 C (on manual mode)
See plot and screen attached.

Current pressure 3.20E-8
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Sun Oct 3 08:36:01 2021, RSS JM CB (remotely), CARME baking status -19 Screenshot_from_2021-10-03_09-33-30.pngScreenshot_from_2021-10-03_09-34-24.png

08:36
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.

Current pressure 1.41E-7

19:42
Temperature
is being slowly reduced (<10C/h) to ~100C in order to activate NEG pumps Monday morning. 
Current pressure ~1.2E-7 and will begin to drop. 

23:20
Temperature
set point 110C. 
Current pressure ~5E-8

See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
Entry  Sat Oct 2 22:14:14 2021, RSS JM CB (remotely), CARME baking status -18 Screenshot_from_2021-10-02_23-12-09.pngScreenshot_from_2021-10-02_23-13-16.png

Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.

Current pressure 1.60E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Sat Oct 2 08:26:49 2021, RSS JM CB (remotely), CARME baking status -17 Screenshot_from_2021-10-02_09-25-40.pngScreenshot_from_2021-10-02_09-24-44.png

Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.

Current pressure 1.73E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Fri Oct 1 21:47:51 2021, CB (remotely), CARME baking status -16 screen.pngTemps.png
Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
Entry  Fri Oct 1 07:17:46 2021, RSS JM, CARME baking status -15 Screenshot_from_2021-10-01_08-17-02.pngScreenshot_from_2021-10-01_08-16-41.png

Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.

Current pressure ~2.30E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Thu Sep 30 18:16:52 2021, RSS JM, CARME baking status -14 Screenshot_from_2021-09-30_19-18-44.pngScreenshot_from_2021-09-30_19-18-08.png

Current temperature ~132 C (on manual mode RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.

Current pressure ~3.30E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Thu Sep 30 06:29:39 2021, RSS JM, CARME baking status -13 Screenshot_from_2021-09-30_07-29-02.pngScreenshot_from_2021-09-30_07-28-09.png

Current temperature ~130 C (on manual mode)
See plot and screen attached.

Current pressure ~4.07E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Wed Sep 29 15:34:07 2021, RSS JM, CARME baking status -12 Screenshot_from_2021-09-29_16-32-50.pngScreenshot_from_2021-09-29_16-31-48.png

Current temperature ~130 C (on manual mode)
See plot and screen attached.

Current pressure ~4.51E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
http://web-docs.gsi.de/~lestinsk/vacplot.php
Entry  Wed Sep 29 13:13:51 2021, JM RSS PB(remotely), Detector frame assembley new_carrier_simple_holes.PDFScreenshot_20210929-110343_Telegram.jpg20210930_164625.jpg20210930_164650.jpg
29/9/21

We have opened the cleaned parts for assembley of the moving detector frames. We appear to have everything we require. 

Standoffs - 12 M3x35 bolts, Many M3 washers, Many M3 nuts, 16 standoff tubes. 
ELOG V3.1.4-unknown