AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 33 of 34  ELOG logo
ID Date Author Subjectdown
  209   Fri Feb 18 11:07:52 2022 RSS, ML, CBAlpha background run46

12:00

 

Check Leakage current: (see attachment 4)

Check NewMerger tab: (see attachment 2)

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 9)

                                 ADC coincidence-info #8 (see attachment 8)

                                 Good events (see attachment 7)

 Check Spectrum Browser tab: (see attachment 10)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 11)

                                         LowEnergyExTotal (see attachment 5)

                                         LowEnergyEyTotal (see attachment 6)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 3)

Attachment 1: temp-2022-02-18_12-01-21.png
temp-2022-02-18_12-01-21.png
Attachment 2: merger-2022-02-18_12-00-10.png
merger-2022-02-18_12-00-10.png
Attachment 3: system-2022-02-18_12-01-52.png
system-2022-02-18_12-01-52.png
Attachment 4: leakage-2022-02-18_12-00-43.png
leakage-2022-02-18_12-00-43.png
Attachment 5: energy-ex-2022-02-18_12-07-07.png
energy-ex-2022-02-18_12-07-07.png
Attachment 6: energy-ey-2022-02-18_12-05-29.png
energy-ey-2022-02-18_12-05-29.png
Attachment 7: good-event-2022-02-18_12-02-49.png
good-event-2022-02-18_12-02-49.png
Attachment 8: correlation-2022-02-18_12-03-19.png
correlation-2022-02-18_12-03-19.png
Attachment 9: adc-data-item2022-02-18_12-02-25.png
adc-data-item2022-02-18_12-02-25.png
Attachment 10: spectrum_browser-2022-02-18_12-03-55.png
spectrum_browser-2022-02-18_12-03-55.png
Attachment 11: energy-xy-total-2022-02-18_12-14-29.png
energy-xy-total-2022-02-18_12-14-29.png
  210   Fri Feb 18 13:03:02 2022 RSS, ML, CBAlpha background run46

14:00

 

Check Leakage current: (see attachment 4)

Check NewMerger tab: (see attachment 2)

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 11)

                                 ADC coincidence-info #8 (see attachment 10)

                                 Good events (see attachment 9)

 Check Spectrum Browser tab: (see attachment 6)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 7)

                                         LowEnergyExTotal (see attachment 8)

                                         LowEnergyEyTotal (see attachment 5)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 3)

Data taking was stopped at 14:04.

Attachment 1: temp-2022-02-18_13-59-30.png
temp-2022-02-18_13-59-30.png
Attachment 2: merger-2022-02-18_13-58-41.png
merger-2022-02-18_13-58-41.png
Attachment 3: system-2022-02-18_13-59-57.png
system-2022-02-18_13-59-57.png
Attachment 4: leakage-2022-02-18_13-59-02.png
leakage-2022-02-18_13-59-02.png
Attachment 5: ey-total-2022-02-18_13-57-46.png
ey-total-2022-02-18_13-57-46.png
Attachment 6: spectrum-2022-02-18_14-02-02.png
spectrum-2022-02-18_14-02-02.png
Attachment 7: xy-total-2022-02-18_14-02-23.png
xy-total-2022-02-18_14-02-23.png
Attachment 8: ex-energy-2022-02-18_13-56-32.png
ex-energy-2022-02-18_13-56-32.png
Attachment 9: good-event-2022-02-18_14-00-53.png
good-event-2022-02-18_14-00-53.png
Attachment 10: correlation-2022-02-18_14-00-27.png
correlation-2022-02-18_14-00-27.png
Attachment 11: adc-data-item-2022-02-18_14-01-17.png
adc-data-item-2022-02-18_14-01-17.png
  205   Thu Feb 17 15:09:40 2022 JM,CB,SDAlpha background run44

16:09

 

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 3)

Check Fee temperatures: all green (see attachment 5)

Check statistics tab: ADC data items (see attachment 2)

                                 ADC coincidence-info #8 (see attachment 6)

                                 Good events (see attachment 4)

 Check Spectrum Browser tab: (see attachment 10)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 9)

                                         LowEnergyExTotal (see attachment 7)

                                         LowEnergyEyTotal (see attachment 8)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 11)

Run stopped for pulser tests 16:13

Attachment 1: 2022-02-17_16-04-11_lowEnergyExTotal.png
2022-02-17_16-04-11_lowEnergyExTotal.png
Attachment 2: 2022-02-17_16-05-03_lowenergyEytotal.png
2022-02-17_16-05-03_lowenergyEytotal.png
Attachment 3: 2022-02-17_16-03-06_lowEnergyTotalDSSSD.png
2022-02-17_16-03-06_lowEnergyTotalDSSSD.png
Attachment 4: 2022-02-17_15-54-12_leakagecurrent.png
2022-02-17_15-54-12_leakagecurrent.png
Attachment 5: 2022-02-17_15-53-25_Merger.png
2022-02-17_15-53-25_Merger.png
Attachment 6: 2022-02-17_15-52-29_Temperature.png
2022-02-17_15-52-29_Temperature.png
Attachment 7: 2022-02-17_15-50-57_GoodEvents.png
2022-02-17_15-50-57_GoodEvents.png
Attachment 8: 2022-02-17_15-49-12._AIDA_ADC_dataitems.png
2022-02-17_15-49-12._AIDA_ADC_dataitems.png
  203   Thu Feb 17 08:31:07 2022 RSS, AGAlpha background run43

09:15

Check Leakage current: (see attachment 2)

Check NewMerger tab: (see attachment 5)

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 4)

                                 ADC coincidence-info #8 (see attachment 6)

                                 Good events (see attachment 7)

 Check Spectrum Browser tab: (see attachment 10)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 3)

                                         LowEnergyExTotal (see attachment 8)

                                         LowEnergyEyTotal (see attachment 9)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 11)

 

Attachment 1: temp-2022-02-17_09-16-02.png
temp-2022-02-17_09-16-02.png
Attachment 2: leakage-2022-02-17_09-14-47.png
leakage-2022-02-17_09-14-47.png
Attachment 3: XY-Total-2022-02-17_09-30-30.png
XY-Total-2022-02-17_09-30-30.png
Attachment 4: data-items-2022-02-17_09-24-58.png
data-items-2022-02-17_09-24-58.png
Attachment 5: new-merger-2022-02-17_09-14-00.png
new-merger-2022-02-17_09-14-00.png
Attachment 6: correlation-2022-02-17_09-24-05.png
correlation-2022-02-17_09-24-05.png
Attachment 7: good-events-2022-02-17_09-21-48.png
good-events-2022-02-17_09-21-48.png
Attachment 8: lowEnergy-Ex-2022-02-17_09-26-36.png
lowEnergy-Ex-2022-02-17_09-26-36.png
Attachment 9: lowEnergy-Ey-2022-02-17_09-27-46.png
lowEnergy-Ey-2022-02-17_09-27-46.png
Attachment 10: spectrum-browser-2022-02-17_09-25-45.png
spectrum-browser-2022-02-17_09-25-45.png
Attachment 11: IMG_6932.JPG
IMG_6932.JPG
  204   Thu Feb 17 13:12:19 2022 RSS, AGAlpha background run43

14:00

 

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 3)

Check Fee temperatures: all green (see attachment 5)

Check statistics tab: ADC data items (see attachment 2)

                                 ADC coincidence-info #8 (see attachment 6)

                                 Good events (see attachment 4)

 Check Spectrum Browser tab: (see attachment 10)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 9)

                                         LowEnergyExTotal (see attachment 7)

                                         LowEnergyEyTotal (see attachment 8)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 11)

Attachment 1: leakage_2022-02-17_13-58-44.png
leakage_2022-02-17_13-58-44.png
Attachment 2: data_item_2022-02-17_14-02-32.png
data_item_2022-02-17_14-02-32.png
Attachment 3: new-merger-2022-02-17_13-57-51.png
new-merger-2022-02-17_13-57-51.png
Attachment 4: good_events_2022-02-17_14-01-53.png
good_events_2022-02-17_14-01-53.png
Attachment 5: temperature_2022-02-17_13-59-30.png
temperature_2022-02-17_13-59-30.png
Attachment 6: correlation_8_2022-02-17_14-01-13.png
correlation_8_2022-02-17_14-01-13.png
Attachment 7: energy_ex_total_2022-02-17_14-06-46.png
energy_ex_total_2022-02-17_14-06-46.png
Attachment 8: energy_ey_total_2022-02-17_14-08-06.png
energy_ey_total_2022-02-17_14-08-06.png
Attachment 9: energy-xy-total-2022-02-17_14-11-42.png
energy-xy-total-2022-02-17_14-11-42.png
Attachment 10: spectrum_browser_2022-02-17_14-03-27.png
spectrum_browser_2022-02-17_14-03-27.png
Attachment 11: system_wide_checks_2022-02-17_14-00-31.png
system_wide_checks_2022-02-17_14-00-31.png
  199   Wed Feb 16 12:43:05 2022 TP, RSSAlpha background run40

13:30

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 2)

Check Fee temperatures: all green (see attachment 3)

Check statistics tab: ADC data items (see attachment 4)

                                 ADC coincidence-info #8 (see attachment 5)

                                 Good events (see attachment 6)

 Check Spectrum Browser tab: (see attachment 7)                 

Check the following plots: LowEnergyXYRateDSSD0 (see attachment 8)

                                         LowEnergyXYTotalDSSD0 (see attachment 9)

                                         LowEnergyExTotal (see attachment 10)

                                         LowEnergyEyTotal (see attachment 11)

                                        

                                        

 

Check system wide checks tab: all okay.

All is good.

Attachment 1: leakage-2022-02-16_13-35-38.png
leakage-2022-02-16_13-35-38.png
Attachment 2: merger-state-2022-02-16_13-35-16.png
merger-state-2022-02-16_13-35-16.png
Attachment 3: temperatures-2022-02-16_13-36-05.png
temperatures-2022-02-16_13-36-05.png
Attachment 4: aida-adc-data-2022-02-16_13-38-13.png
aida-adc-data-2022-02-16_13-38-13.png
Attachment 5: adc-good-events-2022-02-16_13-37-02.png
adc-good-events-2022-02-16_13-37-02.png
Attachment 6: aida-correlation-2022-02-16_13-37-39.png
aida-correlation-2022-02-16_13-37-39.png
Attachment 7: spectrum-browser-2022-02-16_13-38-56.png
spectrum-browser-2022-02-16_13-38-56.png
Attachment 8: lowenergy-xy-rate-dssd0-2022-02-16_13-42-12.png
lowenergy-xy-rate-dssd0-2022-02-16_13-42-12.png
Attachment 9: lowenergy-xytotal-dssd0-2022-02-16_13-41-31.png
lowenergy-xytotal-dssd0-2022-02-16_13-41-31.png
Attachment 10: lowenergy-ex-total-dsssd0-2022-02-16_13-39-43.png
lowenergy-ex-total-dsssd0-2022-02-16_13-39-43.png
Attachment 11: lowenergy-ey-total-dsssd0-2022-02-16_13-40-12.png
lowenergy-ey-total-dsssd0-2022-02-16_13-40-12.png
  198   Wed Feb 16 08:27:27 2022 TP, RSSAlpha background run40

09:15

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 2)

Check Fee temperatures: all green (see attachment 3)

 

Check statistics tab: ADC data items (see attachment 4)

                                 ADC coincidence-info #8 (see attachment 5)

                                 Good events (see attachment 7)

 Check Spectrum Browser tab: (see attachment 6)                 

Check the following plots: LowEnergyExTotal (see attachment 8)

                                         LowEnergyEyTotal (see attachment 9)

                                         LowEnergyXYRateDSSD0 (see attachment 10)

                                         LowEnergyXYTotalDSSD0 (see attachment 11)

 

Check system wide checks tab: all okay.

All is good.

Attachment 1: leakage-2022-02-16_09-15-33.png
leakage-2022-02-16_09-15-33.png
Attachment 2: merger-tab_2022-02-16_09-14-40.png
merger-tab_2022-02-16_09-14-40.png
Attachment 3: temperatures-2022-02-16_09-16-35.png
temperatures-2022-02-16_09-16-35.png
Attachment 4: stats-adc-items-2022-02-16_09-20-16.png
stats-adc-items-2022-02-16_09-20-16.png
Attachment 5: aida-correlation-2022-02-16_09-21-16.png
aida-correlation-2022-02-16_09-21-16.png
Attachment 6: spectrum-browser-2022-02-16_09-22-06.png
spectrum-browser-2022-02-16_09-22-06.png
Attachment 7: stats-good-event-2022-02-16_09-18-13.png
stats-good-event-2022-02-16_09-18-13.png
Attachment 8: low-enegry-ex-tot-2022-02-16_09-23-25.png
low-enegry-ex-tot-2022-02-16_09-23-25.png
Attachment 9: low-energy-ey-tot-2022-02-16_09-23-52.png
low-energy-ey-tot-2022-02-16_09-23-52.png
Attachment 10: low-energy-xy-rate-dsssd0-2022-02-16_09-26-43.png
low-energy-xy-rate-dsssd0-2022-02-16_09-26-43.png
Attachment 11: low-energy-xy-total-dssd0-2022-02-16_09-25-54.png
low-energy-xy-total-dssd0-2022-02-16_09-25-54.png
  195   Tue Feb 15 10:46:37 2022 RSS, LV, CBAlpha background run37

11:30

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 2)

                                 Good events (see attachment 3)

                                  ADC coincidence-info #8 (see attachment 4)

Check NewMerger tab: (see attachment 5)

Check Leakage current: (see attachment 6)

Check the following plots: LowEnergyExTotal (see attachment 7)

                                         LowEnergyEyTotal (see attachment 8)

                                         LowEnergyXYTotalDSSD0 (see attachment 9)

Check Spectrum Browser tab: (see attachment 10)

Check system wide checks tab: all okay.

All is good.

Attachment 1: temp_2022-02-15_11-24-49.png
temp_2022-02-15_11-24-49.png
Attachment 2: stats_2022-02-15_11-26-15.png
stats_2022-02-15_11-26-15.png
Attachment 3: good_events_2022-02-15_11-29-02.png
good_events_2022-02-15_11-29-02.png
Attachment 4: correlation_8_2022-02-15_11-28-28.png
correlation_8_2022-02-15_11-28-28.png
Attachment 5: merger_2022-02-15_11-30-38.png
merger_2022-02-15_11-30-38.png
Attachment 6: leakage_current2022-02-15_11-30-57.png
leakage_current2022-02-15_11-30-57.png
Attachment 7: lowEnergyExTotal_2022-02-15_11-35-24.png
lowEnergyExTotal_2022-02-15_11-35-24.png
Attachment 8: lowEnergyEy_2022-02-15_11-38-00.png
lowEnergyEy_2022-02-15_11-38-00.png
Attachment 9: lowEnergyXYTotal_2022-02-15_11-41-42.png
lowEnergyXYTotal_2022-02-15_11-41-42.png
Attachment 10: spectrum_browser_2022-02-15_11-27-05.png
spectrum_browser_2022-02-15_11-27-05.png
  193   Sun Feb 13 21:28:35 2022 JM, CBAlpha background Run 32, 35

Alpha background gathered from 17:35 12/2/22 to 13:44 13/2/22 is run32. Run time ~20 hours. Some alphas visible in aida1 1*L histograms attached.

Noticed grounding of crimps that attched to cryring ground has come loose. Those crimps not ideal for our grounding cable so were loose. Grounding cable from each fee now meet at a single grounding cable joined by an m3 nut and bolt. This grounding cable then goes to the cryring ground and is properly secured. See attachment 1. No significant change to pulser widths with new grounding method from previous elog. 

Aida5 appeared non-responsive, no good events / data items etc and would not stop when daq was stopped. Fee power cycled. Aida 3 and 5 then showed no data items / good events or any stats. When stopping daq all fees then became non responsive. Full restart initiated, fee power off, all servers incl merger and tape server closed. Restarted system, all fees now responsive, all show full stats and are writing data. 

Alpha background started 17:06 13/2/22 to 09:41 14/2/22 is run35. Run time ~16 hours 40 mins.

Ex, Ey 1D histograms for run32 and run35 attached. Bin size 80 keV.

Attachment 1: 20220213_145309.jpg
20220213_145309.jpg
Attachment 2: 2022-02-13_13-34-46aida1-1*Lalpha.png
2022-02-13_13-34-46aida1-1*Lalpha.png
Attachment 3: canvasEx-run32.png
canvasEx-run32.png
Attachment 4: canvasEy-run32.png
canvasEy-run32.png
Attachment 5: canvasEx-run35.png
canvasEx-run35.png
Attachment 6: canvasEy-run35.png
canvasEy-run35.png
  214   Sun Feb 20 22:04:21 2022 JM, CBAlpha Background run 50

Beam OFF. Run started 20/2/22 18:42

Fast comparator threshold HEC set to 0xff for all fees and asics to combat high energy noise bursts.

Electron cooler scalar plugged back into aida03 ~3000 per sec.

System checck OK, except white rabbit all fail

Temperatures OK

Leakage current 3.638 uA.

Statistics rates in noraml range, aida03 slightly higher as expected with scalar.

  211   Fri Feb 18 20:31:33 2022 JM, CBAlpha Background run 48

Alpha background started with beam ON - run47. Run started 16:49 18/2/22   (beam subsequently found to be OFF)

Beam energy 4 keV, beam lifetime ~ 100 ms

Noticed aida01 and aida02 were showing increased good event rates to ~250,000, effect seen on spectrum browser and data writing rate increased to ~2500 kb/sec from ~20 kb/sec. ASIC check on the affected fees brought rates back to normal range 10-20k good events. Multiple instances occurred in a row on run47 so fees were power cycled. Run ended 17:21

Run 48 started after power cycle

Run start 17:42, beam OFF ~18:30-19:00 for access to the cave to aid allignment of the gas jet target.

Rates remain stable until ~20:00. Aida01 and 02 show increased rates, asic check -> back to normal range.

Beam ON 21:43

All system checks OK. All rates OK. Leakage current ~3.62 uA.

14:00 19/2/22

Beam OFF during 18/2/22 due to an interlock controlled by main control room unknown to us. Beam has been OFF. 

Leakage current plot attached. System checks OK, except white rabbit, all fail.

Motors were at 26mm potentiometer opposed to 20.2mm which was the set point (fully out 19mm). Motors dragged in as pneumatic was not fully out. Likely result of pneumatic out valve being closed. Pneumatic fully out, potentometer back to 20.2mm and leakage current drop from ~3.75 uA to 3.54uA.

Run ended 21:00

Attachment 1: 2022-02-19_14-45-25-leage-current.png
2022-02-19_14-45-25-leage-current.png
  207   Thu Feb 17 18:19:16 2022 JM, CB, SDAlpha Background run 46

Both GSI vacuum group and edinburgh ion gauges OFF

Fees power cycled. All system checks OK.

Writing to file, alpha background overnight.

Moved detector IN 2mm. Noise appears reduced with any distance moved in so overnight spectra to be taken while IN. Not moving further in as possible beam tomorrow.

22:44

Leakage current stable, slowly decreasing ~3.57 uA (attachment 1)

Statistics look OK

Temperatures OK

System wide check all pass - OK

Noise appears much reduced on spectrum Browser channels. (attachement 2). Compared to same plot on elog 197

XYtotal per pixel (attachment 3)

Ex histogram (attachment 4)

 

Attachment 1: 2022-02-17_22-41-45-leakageCurrent.png
2022-02-17_22-41-45-leakageCurrent.png
Attachment 2: 2022-02-17_22-51-07-aida1-3*L.png
2022-02-17_22-51-07-aida1-3*L.png
Attachment 3: 2022-02-17_22-54-06-XYTotal.png
2022-02-17_22-54-06-XYTotal.png
Attachment 4: 2022-02-17_22-56-38-ExHist.png
2022-02-17_22-56-38-ExHist.png
  65   Thu Sep 9 13:01:07 2021 CB RSS + OGAll feedthrough flanges mounted and motor rotated
Moved cables that touched neg pumps. See 
photos. Please bear in mind perspective.
Note avoiding touching chamber 
bottom is not possible.

Re-installed motor to fix alignment 
issues. All good. See attached.

Started pumping down. Reached 3E-1 mbar in 
20 minutes (ok). Turbo on. After one hour 
turbo stable at 0.85 A, pressure on Pirani 
at 1.1E-2 (not reliable). 

IE514 doesn't report pressure, i.e. > 1E-4 
mbar.

Leak likely. Will try to pinpoint 
tomorrow. We only changed 10 flangese.
Attachment 1: 20210909_111933.jpg
20210909_111933.jpg
Attachment 2: 20210909_112120.jpg
20210909_112120.jpg
Attachment 3: 20210909_112125.jpg
20210909_112125.jpg
Attachment 4: 20210909_133027.jpg
20210909_133027.jpg
  394   Mon May 1 18:21:18 2023 CB, JMAll detectors mounted

Mounted four detectors on Carme ad well as four cable harnesses.

 

Cables for new, shorter harnesses appear still too long. Likely the model is not correct somehow.

 

One feedthrough flange was found to be damaged by an adaptor card. Tried to fix in vain. One pin is missing. Replaced with another.

Attachment 1: 20230501_191533.jpg
20230501_191533.jpg
Attachment 2: 20230501_191511.jpg
20230501_191511.jpg
Attachment 3: 20230501_145740.jpg
20230501_145740.jpg
  395   Tue May 2 15:02:09 2023 CB, JMAll detectors and harnesses mounted

Completed mounting harnesses and detectors.

The strain relief support for the bottom most two detectors on the feedthrough side was not mounted because we could not find enough MACOR parts and mounting flanges. We cannot find them in GSI, possibly they are somewhere not obvious in Edinburgh.

The strain relief on the detectors' side are still being manufactured.

 

We plan to test the detectors electrically from next week without moving the dolly. DR and OG to find a temporary mounting point for the manifold so that FEEs can be cooled in current configuration.

Attachment 1: 20230502_153410.jpg
20230502_153410.jpg
Attachment 2: 20230502_153503.jpg
20230502_153503.jpg
Attachment 3: 20230502_153509.jpg
20230502_153509.jpg
Attachment 4: 20230502_153511.jpg
20230502_153511.jpg
  464   Thu Jan 11 19:57:20 2024 CB, JMAll FEE holders mounted

After discussions with Davide, changed the holes in the FEE holders for the bottom-right detector to slots in order to slightly change the angle that the FEE inserts into the flexi rigid PCB. This was sufficient, with some difficulties, to insert both FEEs into the flexi rigid.

Attempted to finally mount the last two fees, the top two for the bottom-right detector, which should have been very easy. Somehow managed to break one pin on each PCB in similar spots. One is in the third column (not in use), and one is in the fourth column (in use). This latter PCB connector was unfortunately dropped while trying to dismount it, and the ERNI connector cracked. That connector can be used anymore? Cannot find spares in GSI, must be in Edinburgh?

 

Dismounted all the hoses from the manifold, and starting to remove teflon from the plugs. Will use instead gaskets + anti-sieze compound. Quite a number of plug thread are damaged, likely in welding. Unclear if this was the reason behind the leaks. Should be done with the manifolds tomorrow.

  497   Wed Feb 7 13:50:20 2024 Elena Hanu, Carlo Bruno, Michael LestinskyAfternoon shift

14:50

 

Temperature, Statistics fine (see screenshots).

System wide checks fine (see below).

All FEEs pass clock check.

All FEEs pass White Rabbit check.

ADC Calibration check:

FEE64 module aida02 failed
FEE64 module aida16 failed
Calibration test result: Passed 14, Failed 2

If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module

FPGA timestamp error check:

         Base         Current         Difference
aida09 fault      0x1 :      0xa :      9  
FPGA Timestamp error counter test result: Passed 15, Failed 1
If any of these counts are reported as in error
The ASIC readout system has detected a timeslip.
That is the timestamp read from the time FIFO is not younger than the last

 

16:00 Slow comp thresh lowered to 100 keV in preparation for detector moving. Will have to test systematically what is the highest threshold we can accept

 

17:00 Temps fine. No overnight run.

 

 

 

Attachment 1: Screenshot_from_2024-02-07_14-53-36.png
Screenshot_from_2024-02-07_14-53-36.png
Attachment 2: Screenshot_from_2024-02-07_14-56-37.png
Screenshot_from_2024-02-07_14-56-37.png
Attachment 3: Screenshot_from_2024-02-07_14-51-21.png
Screenshot_from_2024-02-07_14-51-21.png
  171   Thu Jan 13 10:33:24 2022 JM, OH, TDAdaptor Board misallignment

The ERNI connector is not central on the adaptor boards causing misallignment with the FEE. 

The adaptor board is 80mm long. The ERNI connector is 50mm long. The connector is 13mm from the 2x Lemo side and 17mm from the 3x Lemo side. This results in misallignment between the FEE and adaptor board. 

To correct for misallignment, 2mm will be skimmed from one of the rails on the FEE. 

Skimming the rail allows the FEE to now be inserted straight into the adaptor board connector. Attached image shows test FEE holder on the bench. FEE needs to be carefully inserted to make sure it is straight as it can now move around within the FEE holder with the 2mm skimmed off the rails. For CARME, where sight lines and space are limited, one person is required to hold and push in the FEE whilst another checks the positioning of the connectors is straight. 

Attachment 1: 20220112_160951.jpg
20220112_160951.jpg
Attachment 2: 20220113_145105.jpg
20220113_145105.jpg
Attachment 3: 20220113_145147.jpg
20220113_145147.jpg
  105   Mon Oct 4 09:19:11 2021 JM RSSActivation of NEG elements

9:30

Ion pumps de-gassed by switching on and off multiple times. Large pressure increase the first time pumps were flashed, pressure recovers quickly once pumps off. Subsequent flashing of ion pumps showed a significantly smaller pressure increase, unitl little increase was seen. 

see http://web-docs.gsi.de/~lestinsk/vacplot.php

Pressure ~3E-8 mbar

10:00

Top NEG controller activated. This controller controls 6 NEG wafers connected in groups of two. NEG wafers connected in two's have the following settings which were utilised in Daresbury

Ramp Time = 45 minutes

Hold Time  = 60 minutes

Vmax =  100 V

Imax =  5A

Pmax = 400W

(See attachment 4)

Settings for the NEG wafers connected in a group of three (white tape on cable) in the moving detector chamber are the same as above but with Pmax = 600W. (See attachment 3)

Settings for the D2000's (kapton tape on cables) are the same used in Daresbury and are;

Ramp Time = 45 minutes

Hold Time  = 60 minutes

Vmax =  65 V

Imax =  3A

Pmax = 254W

Tmax = 500 C

(See attachment 1 and 2)

11:44 

Activation of first set of NEG's completed. The temperature of internal thermocouples went above 150C during activation so power to NEG elements was reduced during activation to 125W per module. NEG's fully OFF to allow internal temperatures to cool. Modules will be activated alone to try and find way of activating NEG's without high temperatures. 

Current bakeout temperature is 95C

Pressure ~ 8E-9 mbar

13:10

All NEG's off. Bakeout Temperature is 95C, internal temperature are ~102C.

Pressure  = 5.8E-10 mbar

Activating a single D2000 NEG pump as they contain in built thermocouples to gauge the effect on internal temperatures. 

14:53

Activation complete for single D2000 up to 500C. Most internal thermocouples remained <110C during activation with one going up to 140C. Temperature of internal thermocouples largely unaffected by the NEG activation untill above 400C NEG temperature. D2000 element will be maintained at 250C for activation of other elements. 

Internal temperatures fallen back to ~102C

Pressure <4E-10 mbar

Would recommend activating elements one at a time with a 20-30 minute ramp and limiting power for NEG modules to ~100W per module. 

Attachment 1: IMG_4880.JPG
IMG_4880.JPG
Attachment 2: IMG_4881.JPG
IMG_4881.JPG
Attachment 3: IMG_4882.JPG
IMG_4882.JPG
Attachment 4: IMG_4883.JPG
IMG_4883.JPG
  179   Thu Jan 27 15:24:02 2022 OH, JMAccess to Motors PI
1. ssh <user>@lxpool.gsi.de
2. ssh <user or carme>@atppc022.gsi.de
3. ssh pi@CARMEmotorspi (Standard npg password)
ELOG V3.1.4-unknown