209
|
Fri Feb 18 11:07:52 2022 |
RSS, ML, CB | Alpha background run46 |
12:00
Check Leakage current: (see attachment 4)
Check NewMerger tab: (see attachment 2)
Check Fee temperatures: all green (see attachment 1)
Check statistics tab: ADC data items (see attachment 9)
ADC coincidence-info #8 (see attachment 8)
Good events (see attachment 7)
Check Spectrum Browser tab: (see attachment 10)
Check the following plots:
LowEnergyXYTotalDSSD0 (see attachment 11)
LowEnergyExTotal (see attachment 5)
LowEnergyEyTotal (see attachment 6)
Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 3) |
Attachment 1: temp-2022-02-18_12-01-21.png
|
|
Attachment 2: merger-2022-02-18_12-00-10.png
|
|
Attachment 3: system-2022-02-18_12-01-52.png
|
|
Attachment 4: leakage-2022-02-18_12-00-43.png
|
|
Attachment 5: energy-ex-2022-02-18_12-07-07.png
|
|
Attachment 6: energy-ey-2022-02-18_12-05-29.png
|
|
Attachment 7: good-event-2022-02-18_12-02-49.png
|
|
Attachment 8: correlation-2022-02-18_12-03-19.png
|
|
Attachment 9: adc-data-item2022-02-18_12-02-25.png
|
|
Attachment 10: spectrum_browser-2022-02-18_12-03-55.png
|
|
Attachment 11: energy-xy-total-2022-02-18_12-14-29.png
|
|
210
|
Fri Feb 18 13:03:02 2022 |
RSS, ML, CB | Alpha background run46 |
14:00
Check Leakage current: (see attachment 4)
Check NewMerger tab: (see attachment 2)
Check Fee temperatures: all green (see attachment 1)
Check statistics tab: ADC data items (see attachment 11)
ADC coincidence-info #8 (see attachment 10)
Good events (see attachment 9)
Check Spectrum Browser tab: (see attachment 6)
Check the following plots:
LowEnergyXYTotalDSSD0 (see attachment 7)
LowEnergyExTotal (see attachment 8)
LowEnergyEyTotal (see attachment 5)
Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 3)
Data taking was stopped at 14:04. |
Attachment 1: temp-2022-02-18_13-59-30.png
|
|
Attachment 2: merger-2022-02-18_13-58-41.png
|
|
Attachment 3: system-2022-02-18_13-59-57.png
|
|
Attachment 4: leakage-2022-02-18_13-59-02.png
|
|
Attachment 5: ey-total-2022-02-18_13-57-46.png
|
|
Attachment 6: spectrum-2022-02-18_14-02-02.png
|
|
Attachment 7: xy-total-2022-02-18_14-02-23.png
|
|
Attachment 8: ex-energy-2022-02-18_13-56-32.png
|
|
Attachment 9: good-event-2022-02-18_14-00-53.png
|
|
Attachment 10: correlation-2022-02-18_14-00-27.png
|
|
Attachment 11: adc-data-item-2022-02-18_14-01-17.png
|
|
205
|
Thu Feb 17 15:09:40 2022 |
JM,CB,SD | Alpha background run44 |
16:09
Check Leakage current: (see attachment 1)
Check NewMerger tab: (see attachment 3)
Check Fee temperatures: all green (see attachment 5)
Check statistics tab: ADC data items (see attachment 2)
ADC coincidence-info #8 (see attachment 6)
Good events (see attachment 4)
Check Spectrum Browser tab: (see attachment 10)
Check the following plots:
LowEnergyXYTotalDSSD0 (see attachment 9)
LowEnergyExTotal (see attachment 7)
LowEnergyEyTotal (see attachment 8)
Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 11)
Run stopped for pulser tests 16:13 |
Attachment 1: 2022-02-17_16-04-11_lowEnergyExTotal.png
|
|
Attachment 2: 2022-02-17_16-05-03_lowenergyEytotal.png
|
|
Attachment 3: 2022-02-17_16-03-06_lowEnergyTotalDSSSD.png
|
|
Attachment 4: 2022-02-17_15-54-12_leakagecurrent.png
|
|
Attachment 5: 2022-02-17_15-53-25_Merger.png
|
|
Attachment 6: 2022-02-17_15-52-29_Temperature.png
|
|
Attachment 7: 2022-02-17_15-50-57_GoodEvents.png
|
|
Attachment 8: 2022-02-17_15-49-12._AIDA_ADC_dataitems.png
|
|
203
|
Thu Feb 17 08:31:07 2022 |
RSS, AG | Alpha background run43 |
09:15
Check Leakage current: (see attachment 2)
Check NewMerger tab: (see attachment 5)
Check Fee temperatures: all green (see attachment 1)
Check statistics tab: ADC data items (see attachment 4)
ADC coincidence-info #8 (see attachment 6)
Good events (see attachment 7)
Check Spectrum Browser tab: (see attachment 10)
Check the following plots:
LowEnergyXYTotalDSSD0 (see attachment 3)
LowEnergyExTotal (see attachment 8)
LowEnergyEyTotal (see attachment 9)
Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 11)
|
Attachment 1: temp-2022-02-17_09-16-02.png
|
|
Attachment 2: leakage-2022-02-17_09-14-47.png
|
|
Attachment 3: XY-Total-2022-02-17_09-30-30.png
|
|
Attachment 4: data-items-2022-02-17_09-24-58.png
|
|
Attachment 5: new-merger-2022-02-17_09-14-00.png
|
|
Attachment 6: correlation-2022-02-17_09-24-05.png
|
|
Attachment 7: good-events-2022-02-17_09-21-48.png
|
|
Attachment 8: lowEnergy-Ex-2022-02-17_09-26-36.png
|
|
Attachment 9: lowEnergy-Ey-2022-02-17_09-27-46.png
|
|
Attachment 10: spectrum-browser-2022-02-17_09-25-45.png
|
|
Attachment 11: IMG_6932.JPG
|
|
204
|
Thu Feb 17 13:12:19 2022 |
RSS, AG | Alpha background run43 |
14:00
Check Leakage current: (see attachment 1)
Check NewMerger tab: (see attachment 3)
Check Fee temperatures: all green (see attachment 5)
Check statistics tab: ADC data items (see attachment 2)
ADC coincidence-info #8 (see attachment 6)
Good events (see attachment 4)
Check Spectrum Browser tab: (see attachment 10)
Check the following plots:
LowEnergyXYTotalDSSD0 (see attachment 9)
LowEnergyExTotal (see attachment 7)
LowEnergyEyTotal (see attachment 8)
Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 11) |
Attachment 1: leakage_2022-02-17_13-58-44.png
|
|
Attachment 2: data_item_2022-02-17_14-02-32.png
|
|
Attachment 3: new-merger-2022-02-17_13-57-51.png
|
|
Attachment 4: good_events_2022-02-17_14-01-53.png
|
|
Attachment 5: temperature_2022-02-17_13-59-30.png
|
|
Attachment 6: correlation_8_2022-02-17_14-01-13.png
|
|
Attachment 7: energy_ex_total_2022-02-17_14-06-46.png
|
|
Attachment 8: energy_ey_total_2022-02-17_14-08-06.png
|
|
Attachment 9: energy-xy-total-2022-02-17_14-11-42.png
|
|
Attachment 10: spectrum_browser_2022-02-17_14-03-27.png
|
|
Attachment 11: system_wide_checks_2022-02-17_14-00-31.png
|
|
199
|
Wed Feb 16 12:43:05 2022 |
TP, RSS | Alpha background run40 |
13:30
Check Leakage current: (see attachment 1)
Check NewMerger tab: (see attachment 2)
Check Fee temperatures: all green (see attachment 3)
Check statistics tab: ADC data items (see attachment 4)
ADC coincidence-info #8 (see attachment 5)
Good events (see attachment 6)
Check Spectrum Browser tab: (see attachment 7)
Check the following plots: LowEnergyXYRateDSSD0 (see attachment 8)
LowEnergyXYTotalDSSD0 (see attachment 9)
LowEnergyExTotal (see attachment 10)
LowEnergyEyTotal (see attachment 11)
Check system wide checks tab: all okay.
All is good. |
Attachment 1: leakage-2022-02-16_13-35-38.png
|
|
Attachment 2: merger-state-2022-02-16_13-35-16.png
|
|
Attachment 3: temperatures-2022-02-16_13-36-05.png
|
|
Attachment 4: aida-adc-data-2022-02-16_13-38-13.png
|
|
Attachment 5: adc-good-events-2022-02-16_13-37-02.png
|
|
Attachment 6: aida-correlation-2022-02-16_13-37-39.png
|
|
Attachment 7: spectrum-browser-2022-02-16_13-38-56.png
|
|
Attachment 8: lowenergy-xy-rate-dssd0-2022-02-16_13-42-12.png
|
|
Attachment 9: lowenergy-xytotal-dssd0-2022-02-16_13-41-31.png
|
|
Attachment 10: lowenergy-ex-total-dsssd0-2022-02-16_13-39-43.png
|
|
Attachment 11: lowenergy-ey-total-dsssd0-2022-02-16_13-40-12.png
|
|
198
|
Wed Feb 16 08:27:27 2022 |
TP, RSS | Alpha background run40 |
09:15
Check Leakage current: (see attachment 1)
Check NewMerger tab: (see attachment 2)
Check Fee temperatures: all green (see attachment 3)
Check statistics tab: ADC data items (see attachment 4)
ADC coincidence-info #8 (see attachment 5)
Good events (see attachment 7)
Check Spectrum Browser tab: (see attachment 6)
Check the following plots: LowEnergyExTotal (see attachment 8)
LowEnergyEyTotal (see attachment 9)
LowEnergyXYRateDSSD0 (see attachment 10)
LowEnergyXYTotalDSSD0 (see attachment 11)
Check system wide checks tab: all okay.
All is good. |
Attachment 1: leakage-2022-02-16_09-15-33.png
|
|
Attachment 2: merger-tab_2022-02-16_09-14-40.png
|
|
Attachment 3: temperatures-2022-02-16_09-16-35.png
|
|
Attachment 4: stats-adc-items-2022-02-16_09-20-16.png
|
|
Attachment 5: aida-correlation-2022-02-16_09-21-16.png
|
|
Attachment 6: spectrum-browser-2022-02-16_09-22-06.png
|
|
Attachment 7: stats-good-event-2022-02-16_09-18-13.png
|
|
Attachment 8: low-enegry-ex-tot-2022-02-16_09-23-25.png
|
|
Attachment 9: low-energy-ey-tot-2022-02-16_09-23-52.png
|
|
Attachment 10: low-energy-xy-rate-dsssd0-2022-02-16_09-26-43.png
|
|
Attachment 11: low-energy-xy-total-dssd0-2022-02-16_09-25-54.png
|
|
195
|
Tue Feb 15 10:46:37 2022 |
RSS, LV, CB | Alpha background run37 |
11:30
Check Fee temperatures: all green (see attachment 1)
Check statistics tab: ADC data items (see attachment 2)
Good events (see attachment 3)
ADC coincidence-info #8 (see attachment 4)
Check NewMerger tab: (see attachment 5)
Check Leakage current: (see attachment 6)
Check the following plots: LowEnergyExTotal (see attachment 7)
LowEnergyEyTotal (see attachment 8)
LowEnergyXYTotalDSSD0 (see attachment 9)
Check Spectrum Browser tab: (see attachment 10)
Check system wide checks tab: all okay.
All is good. |
Attachment 1: temp_2022-02-15_11-24-49.png
|
|
Attachment 2: stats_2022-02-15_11-26-15.png
|
|
Attachment 3: good_events_2022-02-15_11-29-02.png
|
|
Attachment 4: correlation_8_2022-02-15_11-28-28.png
|
|
Attachment 5: merger_2022-02-15_11-30-38.png
|
|
Attachment 6: leakage_current2022-02-15_11-30-57.png
|
|
Attachment 7: lowEnergyExTotal_2022-02-15_11-35-24.png
|
|
Attachment 8: lowEnergyEy_2022-02-15_11-38-00.png
|
|
Attachment 9: lowEnergyXYTotal_2022-02-15_11-41-42.png
|
|
Attachment 10: spectrum_browser_2022-02-15_11-27-05.png
|
|
193
|
Sun Feb 13 21:28:35 2022 |
JM, CB | Alpha background Run 32, 35 |
Alpha background gathered from 17:35 12/2/22 to 13:44 13/2/22 is run32. Run time ~20 hours. Some alphas visible in aida1 1*L histograms attached.
Noticed grounding of crimps that attched to cryring ground has come loose. Those crimps not ideal for our grounding cable so were loose. Grounding cable from each fee now meet at a single grounding cable joined by an m3 nut and bolt. This grounding cable then goes to the cryring ground and is properly secured. See attachment 1. No significant change to pulser widths with new grounding method from previous elog.
Aida5 appeared non-responsive, no good events / data items etc and would not stop when daq was stopped. Fee power cycled. Aida 3 and 5 then showed no data items / good events or any stats. When stopping daq all fees then became non responsive. Full restart initiated, fee power off, all servers incl merger and tape server closed. Restarted system, all fees now responsive, all show full stats and are writing data.
Alpha background started 17:06 13/2/22 to 09:41 14/2/22 is run35. Run time ~16 hours 40 mins.
Ex, Ey 1D histograms for run32 and run35 attached. Bin size 80 keV. |
Attachment 1: 20220213_145309.jpg
|
|
Attachment 2: 2022-02-13_13-34-46aida1-1*Lalpha.png
|
|
Attachment 3: canvasEx-run32.png
|
|
Attachment 4: canvasEy-run32.png
|
|
Attachment 5: canvasEx-run35.png
|
|
Attachment 6: canvasEy-run35.png
|
|
214
|
Sun Feb 20 22:04:21 2022 |
JM, CB | Alpha Background run 50 |
Beam OFF. Run started 20/2/22 18:42
Fast comparator threshold HEC set to 0xff for all fees and asics to combat high energy noise bursts.
Electron cooler scalar plugged back into aida03 ~3000 per sec.
System checck OK, except white rabbit all fail
Temperatures OK
Leakage current 3.638 uA.
Statistics rates in noraml range, aida03 slightly higher as expected with scalar. |
211
|
Fri Feb 18 20:31:33 2022 |
JM, CB | Alpha Background run 48 |
Alpha background started with beam ON - run47. Run started 16:49 18/2/22 (beam subsequently found to be OFF)
Beam energy 4 keV, beam lifetime ~ 100 ms
Noticed aida01 and aida02 were showing increased good event rates to ~250,000, effect seen on spectrum browser and data writing rate increased to ~2500 kb/sec from ~20 kb/sec. ASIC check on the affected fees brought rates back to normal range 10-20k good events. Multiple instances occurred in a row on run47 so fees were power cycled. Run ended 17:21
Run 48 started after power cycle
Run start 17:42, beam OFF ~18:30-19:00 for access to the cave to aid allignment of the gas jet target.
Rates remain stable until ~20:00. Aida01 and 02 show increased rates, asic check -> back to normal range.
Beam ON 21:43
All system checks OK. All rates OK. Leakage current ~3.62 uA.
14:00 19/2/22
Beam OFF during 18/2/22 due to an interlock controlled by main control room unknown to us. Beam has been OFF.
Leakage current plot attached. System checks OK, except white rabbit, all fail.
Motors were at 26mm potentiometer opposed to 20.2mm which was the set point (fully out 19mm). Motors dragged in as pneumatic was not fully out. Likely result of pneumatic out valve being closed. Pneumatic fully out, potentometer back to 20.2mm and leakage current drop from ~3.75 uA to 3.54uA.
Run ended 21:00 |
Attachment 1: 2022-02-19_14-45-25-leage-current.png
|
|
207
|
Thu Feb 17 18:19:16 2022 |
JM, CB, SD | Alpha Background run 46 |
Both GSI vacuum group and edinburgh ion gauges OFF
Fees power cycled. All system checks OK.
Writing to file, alpha background overnight.
Moved detector IN 2mm. Noise appears reduced with any distance moved in so overnight spectra to be taken while IN. Not moving further in as possible beam tomorrow.
22:44
Leakage current stable, slowly decreasing ~3.57 uA (attachment 1)
Statistics look OK
Temperatures OK
System wide check all pass - OK
Noise appears much reduced on spectrum Browser channels. (attachement 2). Compared to same plot on elog 197
XYtotal per pixel (attachment 3)
Ex histogram (attachment 4)
|
Attachment 1: 2022-02-17_22-41-45-leakageCurrent.png
|
|
Attachment 2: 2022-02-17_22-51-07-aida1-3*L.png
|
|
Attachment 3: 2022-02-17_22-54-06-XYTotal.png
|
|
Attachment 4: 2022-02-17_22-56-38-ExHist.png
|
|
65
|
Thu Sep 9 13:01:07 2021 |
CB RSS + OG | All feedthrough flanges mounted and motor rotated |
Moved cables that touched neg pumps. See
photos. Please bear in mind perspective.
Note avoiding touching chamber
bottom is not possible.
Re-installed motor to fix alignment
issues. All good. See attached.
Started pumping down. Reached 3E-1 mbar in
20 minutes (ok). Turbo on. After one hour
turbo stable at 0.85 A, pressure on Pirani
at 1.1E-2 (not reliable).
IE514 doesn't report pressure, i.e. > 1E-4
mbar.
Leak likely. Will try to pinpoint
tomorrow. We only changed 10 flangese. |
Attachment 1: 20210909_111933.jpg
|
|
Attachment 2: 20210909_112120.jpg
|
|
Attachment 3: 20210909_112125.jpg
|
|
Attachment 4: 20210909_133027.jpg
|
|
394
|
Mon May 1 18:21:18 2023 |
CB, JM | All detectors mounted |
Mounted four detectors on Carme ad well as four cable harnesses.
Cables for new, shorter harnesses appear still too long. Likely the model is not correct somehow.
One feedthrough flange was found to be damaged by an adaptor card. Tried to fix in vain. One pin is missing. Replaced with another. |
Attachment 1: 20230501_191533.jpg
|
|
Attachment 2: 20230501_191511.jpg
|
|
Attachment 3: 20230501_145740.jpg
|
|
395
|
Tue May 2 15:02:09 2023 |
CB, JM | All detectors and harnesses mounted |
Completed mounting harnesses and detectors.
The strain relief support for the bottom most two detectors on the feedthrough side was not mounted because we could not find enough MACOR parts and mounting flanges. We cannot find them in GSI, possibly they are somewhere not obvious in Edinburgh.
The strain relief on the detectors' side are still being manufactured.
We plan to test the detectors electrically from next week without moving the dolly. DR and OG to find a temporary mounting point for the manifold so that FEEs can be cooled in current configuration. |
Attachment 1: 20230502_153410.jpg
|
|
Attachment 2: 20230502_153503.jpg
|
|
Attachment 3: 20230502_153509.jpg
|
|
Attachment 4: 20230502_153511.jpg
|
|
464
|
Thu Jan 11 19:57:20 2024 |
CB, JM | All FEE holders mounted |
After discussions with Davide, changed the holes in the FEE holders for the bottom-right detector to slots in order to slightly change the angle that the FEE inserts into the flexi rigid PCB. This was sufficient, with some difficulties, to insert both FEEs into the flexi rigid.
Attempted to finally mount the last two fees, the top two for the bottom-right detector, which should have been very easy. Somehow managed to break one pin on each PCB in similar spots. One is in the third column (not in use), and one is in the fourth column (in use). This latter PCB connector was unfortunately dropped while trying to dismount it, and the ERNI connector cracked. That connector can be used anymore? Cannot find spares in GSI, must be in Edinburgh?
Dismounted all the hoses from the manifold, and starting to remove teflon from the plugs. Will use instead gaskets + anti-sieze compound. Quite a number of plug thread are damaged, likely in welding. Unclear if this was the reason behind the leaks. Should be done with the manifolds tomorrow. |
497
|
Wed Feb 7 13:50:20 2024 |
Elena Hanu, Carlo Bruno, Michael Lestinsky | Afternoon shift |
14:50
Temperature, Statistics fine (see screenshots).
System wide checks fine (see below).
All FEEs pass clock check.
All FEEs pass White Rabbit check.
ADC Calibration check:
FEE64 module aida02 failed
FEE64 module aida16 failed
Calibration test result: Passed 14, Failed 2
If any modules fail calibration , check the clock status and open the FADC Align and Control browser page to rerun calibration for that module
FPGA timestamp error check:
Base Current Difference
aida09 fault 0x1 : 0xa : 9
FPGA Timestamp error counter test result: Passed 15, Failed 1
If any of these counts are reported as in error
The ASIC readout system has detected a timeslip.
That is the timestamp read from the time FIFO is not younger than the last
16:00 Slow comp thresh lowered to 100 keV in preparation for detector moving. Will have to test systematically what is the highest threshold we can accept
17:00 Temps fine. No overnight run.
|
Attachment 1: Screenshot_from_2024-02-07_14-53-36.png
|
|
Attachment 2: Screenshot_from_2024-02-07_14-56-37.png
|
|
Attachment 3: Screenshot_from_2024-02-07_14-51-21.png
|
|
171
|
Thu Jan 13 10:33:24 2022 |
JM, OH, TD | Adaptor Board misallignment |
The ERNI connector is not central on the adaptor boards causing misallignment with the FEE.
The adaptor board is 80mm long. The ERNI connector is 50mm long. The connector is 13mm from the 2x Lemo side and 17mm from the 3x Lemo side. This results in misallignment between the FEE and adaptor board.
To correct for misallignment, 2mm will be skimmed from one of the rails on the FEE.
Skimming the rail allows the FEE to now be inserted straight into the adaptor board connector. Attached image shows test FEE holder on the bench. FEE needs to be carefully inserted to make sure it is straight as it can now move around within the FEE holder with the 2mm skimmed off the rails. For CARME, where sight lines and space are limited, one person is required to hold and push in the FEE whilst another checks the positioning of the connectors is straight. |
Attachment 1: 20220112_160951.jpg
|
|
Attachment 2: 20220113_145105.jpg
|
|
Attachment 3: 20220113_145147.jpg
|
|
105
|
Mon Oct 4 09:19:11 2021 |
JM RSS | Activation of NEG elements |
9:30
Ion pumps de-gassed by switching on and off multiple times. Large pressure increase the first time pumps were flashed, pressure recovers quickly once pumps off. Subsequent flashing of ion pumps showed a significantly smaller pressure increase, unitl little increase was seen.
see http://web-docs.gsi.de/~lestinsk/vacplot.php
Pressure ~3E-8 mbar
10:00
Top NEG controller activated. This controller controls 6 NEG wafers connected in groups of two. NEG wafers connected in two's have the following settings which were utilised in Daresbury
Ramp Time = 45 minutes
Hold Time = 60 minutes
Vmax = 100 V
Imax = 5A
Pmax = 400W
(See attachment 4)
Settings for the NEG wafers connected in a group of three (white tape on cable) in the moving detector chamber are the same as above but with Pmax = 600W. (See attachment 3)
Settings for the D2000's (kapton tape on cables) are the same used in Daresbury and are;
Ramp Time = 45 minutes
Hold Time = 60 minutes
Vmax = 65 V
Imax = 3A
Pmax = 254W
Tmax = 500 C
(See attachment 1 and 2)
11:44
Activation of first set of NEG's completed. The temperature of internal thermocouples went above 150C during activation so power to NEG elements was reduced during activation to 125W per module. NEG's fully OFF to allow internal temperatures to cool. Modules will be activated alone to try and find way of activating NEG's without high temperatures.
Current bakeout temperature is 95C
Pressure ~ 8E-9 mbar
13:10
All NEG's off. Bakeout Temperature is 95C, internal temperature are ~102C.
Pressure = 5.8E-10 mbar
Activating a single D2000 NEG pump as they contain in built thermocouples to gauge the effect on internal temperatures.
14:53
Activation complete for single D2000 up to 500C. Most internal thermocouples remained <110C during activation with one going up to 140C. Temperature of internal thermocouples largely unaffected by the NEG activation untill above 400C NEG temperature. D2000 element will be maintained at 250C for activation of other elements.
Internal temperatures fallen back to ~102C
Pressure <4E-10 mbar
Would recommend activating elements one at a time with a 20-30 minute ramp and limiting power for NEG modules to ~100W per module. |
Attachment 1: IMG_4880.JPG
|
|
Attachment 2: IMG_4881.JPG
|
|
Attachment 3: IMG_4882.JPG
|
|
Attachment 4: IMG_4883.JPG
|
|
179
|
Thu Jan 27 15:24:02 2022 |
OH, JM | Access to Motors PI |
1. ssh <user>@lxpool.gsi.de
2. ssh <user or carme>@atppc022.gsi.de
3. ssh pi@CARMEmotorspi (Standard npg password) |