ID Date Authordown Subject Text Attachments
  749   Mon Jun 16 10:46:11 2025 CB JM JG AKRun82Background without beam while source is
optimised.
  
  132   Fri Oct 29 15:09:27 2021 CB JM + RSS OG DRPreparation to mount new DSSDs(Mon 25 October - Tue 26 October)

Considered different strategies
to mount DSSDs inside CARME, while waiting
 6x 
  134   Sun Oct 31 07:29:17 2021 CB JM + RSS OGDetectors mounted on plate in CARME(Wed 27 October)

Dismounted plate from rod. Dismounted
broken detectors from plate and placed back
 8x 
  135   Sun Oct 31 07:41:20 2021 CB JM + RSSWires plugged in DSSDs (Wed 27 October)

Started with top-most flange. Attemptedto
plug in MACOR lead in DSSD plug in preparation
 8x 
  136   Sun Oct 31 07:55:39 2021 CB JM + OHStrain relief mounted(Thu 28 October)

All strain relief extension plates
mounted behind the wires, using SS countersunk
 20211028_190026.jpg20211028_192251.jpg20211028_192210.jpg 
  755   Tue Jun 17 12:22:50 2025 CB EW JG AG SNRun 94/95/96Run 94

Background with beam at 150 keV
and no target.
 G35Voltage.pdf 
  568   Fri May 31 21:53:20 2024 CB EM, JM,EM ABOvernight beam tests22:53

Run 15 started

Beam tests. We increased the storage
 17x 
  641   Sun Jun 16 13:51:11 2024 CB EM MLRun 7914:51

Ecooler setpoint 246.9

Readout 246.35
 7x 
  511   Wed Feb 14 08:44:32 2024 CB AR JMMotors test and turbo ONRun number changed 09:44 - Now run 23

Moving motors with the injection

Ring signal very weird, moving
 11x 
  512   Wed Feb 14 14:06:28 2024 CB AR JMPulser Walkthrough
15:06
Run25

Pulser walkthrough

EGG
Ortec 448 Pulser

Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators
  
  751   Mon Jun 16 21:58:00 2025 CB ARRuns 84-89Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal,
  
  657   Wed Jun 19 12:08:34 2024 CB + variousRun 101-105Run 101: no target. See ELOG entry by TD.

Run 102: ??

Run 103: ??
  
  655   Wed Jun 19 12:04:02 2024 CB + OF, SSRun 96/97Run 96 - as run 89, while we wait for beam
energy change at higher energies

Run stopped around 08:56
  
  162   Wed Nov 24 12:08:08 2021 CB + ML OGIon pumps onFound SIP power unit for D2000 #4 not functioning
correctly. Max current regardless of ion
element connected to.
 vacplot24.pngvacplot.pngCARMEtemps.png 
  139   Mon Nov 1 14:48:16 2021 CB + ML DRCARME openedConfirmed leak as per previous Elog.

Tightened to 100 Nm - no effects.

Tightened to 130 Nm - bottom leak
  
  161   Tue Nov 23 08:49:33 2021 CB + MLNEG activation completedFound temperatures and pressure stabilised
overnight. See attached.

12:00 Began activation of 3x UHV1400
 vacplot24.pngCARMEtemps.pngvacplot24-1.pngCARMEtemps-1.png 
  140   Tue Nov 2 12:45:36 2021 CB + DR NKIssues with CARME feetAttempted to close CARME as carefully as
possible.

Swapped out one foot for another
 20211102_134446.jpg 
  94   Wed Sep 29 09:27:38 2021 CB (remotely), RSS JM MLPower cutSudden and unexpected power cut at 10:02 German
time, affecting all the target hall.
  
  12   Tue Sep 15 08:39:26 2020 CB (remotely), JMBaking and Chamber status Tuesday 15 September

08:40
 20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png 
  25   Mon Oct 5 08:21:40 2020 CB (remotely), JMFirst bake of CARME with pumps (cont.)5 OCTOBER

08:21 Temperatures stable overnight. See
 6x 