Entry  Sun Oct 31 07:29:17 2021, CB JM + RSS OG, Detectors mounted on plate in CARME 8x
(Wed 27 October)

Dismounted plate from rod. Dismounted broken detectors from plate and placed back in box. Dismounted "dog leg" struts and replaced
with fully un-threaded struts.
Entry  Sun Oct 31 07:41:20 2021, CB JM + RSS, Wires plugged in DSSDs  8x
(Wed 27 October)

Started with top-most flange. Attemptedto plug in MACOR lead in DSSD plug in preparation for jacking in. Realised that extender plate thickness
causes plug to be rasied with respect to nominal position, which results in plug non entering straight. Removed extension plate.
Entry  Sun Oct 31 07:55:39 2021, CB JM + OH, Strain relief mounted 20211028_190026.jpg20211028_192251.jpg20211028_192210.jpg
(Thu 28 October)

All strain relief extension plates mounted behind the wires, using SS countersunk bolts (not silver plated).

Inserting bottom part of MACOR strain relief causes wires to bend too much with strain placed on DSSD. No reasonable way to proceed like that.
Entry  Tue Jun 17 12:22:50 2025, CB EW JG AG SN, Run 94/95/96 G35Voltage.pdf
Run 94

Background with beam at 150 keV and no target.

Note energy is 0.15% off vs. beam and target to have a more realistic orbit.
Entry  Fri May 31 21:53:20 2024, CB EM, JM,EM AB, Overnight beam tests 17x
22:53

Run 15 started

Beam tests. We increased the storage time to 2min and switched to bunched beam so that we can see the beam lifetime over the cycle.
Entry  Sun Jun 16 13:51:11 2024, CB EM ML, Run 79 7x
14:51

Ecooler setpoint 246.9

Readout 246.35
Entry  Wed Feb 14 08:44:32 2024, CB AR JM, Motors test and turbo ON 11x
Run number changed 09:44 - Now run 23

Moving motors with the injection

Ring signal very weird, moving in for short time and staying out for 15+ seconds.
Entry  Wed Feb 14 14:06:28 2024, CB AR JM, Pulser Walkthrough 

15:06
Run25

Pulser walkthrough

EGG Ortec 448 Pulser

Amplitide 90,000-10,000 @ 10,000 step
Normalise 5.0
Attenuators x5 IN
t_r 100ns
Tau_d
50us
Frequency Int Osc 50Hz
Polarity + ( - polarity via Cooknell SA1 Sum & Invert Amp )
Entry  Mon Jun 16 21:58:00 2025, CB AR, Runs 84-89 
Found all Merger Links background black - inactive. Nontheless the tapeservice was working, the data rate to disk was normal, and the file was being
written and the histograms were being updated.

Decided to stop DAQ, stop Merger, restart merger. Links rest to green background - but no more writing to disk!
Entry  Wed Jun 19 12:08:34 2024, CB + various, Run 101-105 
Run 101: no target. See ELOG entry by TD.

Run 102: ??

Run 103: ??
Entry  Wed Jun 19 12:04:02 2024, CB + OF, SS, Run 96/97 
Run 96 - as run 89, while we wait for beam energy change at higher energies

Run stopped around 08:56 June 17

 
Entry  Wed Nov 24 12:08:08 2021, CB + ML OG, Ion pumps on vacplot24.pngvacplot.pngCARMEtemps.png
Found SIP power unit for D2000 #4 not functioning correctly. Max current regardless of ion element connected to.

 

ML kindly loaned a spare. All D2000 work Ok now. Will have to send faulty unit for repairs back to SAES.
Entry  Mon Nov 1 14:48:16 2021, CB + ML DR, CARME opened 
Confirmed leak as per previous Elog.

Tightened to 100 Nm - no effects.

Tightened to 130 Nm - bottom leak disappeared. Top leak still at 1.3E-8 mbar l second.
Entry  Tue Nov 23 08:49:33 2021, CB + ML, NEG activation completed vacplot24.pngCARMEtemps.pngvacplot24-1.pngCARMEtemps-1.png
Found temperatures and pressure stabilised overnight. See attached.

12:00 Began activation of 3x UHV1400 in channel 2, top module. Started using 90 W as per procedure. No effect on temperature. Increased to 120
W. OK
Entry  Tue Nov 2 12:45:36 2021, CB + DR NK, Issues with CARME feet 20211102_134446.jpg
Attempted to close CARME as carefully as possible.

Swapped out one foot for another one and temporarily removed a second to allow CARME to rotate slightly and get a better alignment of the two
surfaces of the COF600 flange.
Entry  Wed Sep 29 09:27:38 2021, CB (remotely), RSS JM ML, Power cut 
Sudden and unexpected power cut at 10:02 German time, affecting all the target hall.

It has been caused by the emergency alarm being triggered. Reasons unclear. Electricians were informed.
Entry  Tue Sep 15 08:39:26 2020, CB (remotely), JM, Baking and Chamber status  20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png
Tuesday 15 September

08:40
Entry  Mon Oct 5 08:21:40 2020, CB (remotely), JM, First bake of CARME with pumps (cont.) 6x
5 OCTOBER

08:21 Temperatures stable overnight. See attached. Baking continues.
Entry  Fri Nov 26 10:01:45 2021, CB (remotely) ML, Power cut in the CRYRING cave 
ML reports power cut in CRYRING cave. Reasons unknown. No effect on vacuum, but top valve closed for safety reason. Ramping down temperature.
Entry  Tue Nov 30 10:49:43 2021, CB (remotely) GV, Gate valve opened vacplot24.png
GSI vacuum division IE514 gauge connected.

Gleb reports gate downstream opened. Vacuum goes up and recovers as expected.