  223   Tue Feb 22 00:32:35 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 01:30

Beam ON ~6E6 pps

Target ON and open to the ring
 2022-02-22_01-38-53-Ex-histogram.png2022-02-22_01-38-17-XYtotal.png 
  224   Tue Feb 22 02:02:11 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 03:00

Beam ON ~7E6 pps

Target ON and open to the ring
 10x 
  225   Tue Feb 22 03:05:06 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 04:00

Beam ON ~5.5E6 pps, but it fluctates
between 2e6 and 6e6 (like a step function)
 9x 
  227   Tue Feb 22 05:12:38 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 06:00

Beam ON ~1.5E6 pps, still fluctates
between 1e6 and 6e6 (like a step function)
 11x 
  219   Mon Feb 21 17:26:19 2022 JM, CB, SHB, OH (remotely)Beam ON run 5321/2/22 16:00

Call from main control room, beam
is ON, probably has been for several hours
 9x 
  213   Sat Feb 19 20:08:43 2022 JM, CBBeam ON run 49Run started 19/2/22 21:05. Beam ON

Temperatures OK

System wide checks OK - white rabbit
 6x 
  359   Tue Mar 1 23:43:15 2022 David, GeorgeBeam Intensity Drop00:38
Intensity in the ring dropped by 2
orders of magnitude to 5e5 on injection
  
  610   Mon Jun 10 07:40:47 2024 RSS, DBBeam08:26: There is no beam and Gleb is informed.

08:46: Beam is back.
  
  167   Mon Jan 10 20:52:53 2022 JM, TD, OHBaking tent removed, VI testsBaking tent, frame and trays fully
removed from CARME chamber. Removal of baking
frame required removing air lines from upper
 20220110_175547.jpg20220110_175811.jpgvi-curve.png 
  424   Fri Jul 21 08:21:54 2023 TD, RSSBaking tent manual09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar

      Today - install TCs, connect to Pico
 CARME-baking-guide_(1).pdf 
  431   Thu Aug 10 07:51:43 2023 JMBaking tent and heater testing09/08/23

Attached is the current pumpdown
plot taken from grafana. 
 8x 
  13   Wed Sep 16 08:52:03 2020 CB (remotely)Baking status 16-17 September16 September

08:50
 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png 
  11   Mon Sep 14 12:07:40 2020 JM, CB (remotely)Baking statusMon 14 Sep 09:50

Jordan moved the TC08 picolog 2 away from
 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png 
  16   Fri Sep 18 10:28:57 2020 JM, CB(remotely)Baking status10:28
Reducing temperature in steps. System cooling
down. See attached.
 20200918_1029_temps.png 
  22   Sat Sep 26 09:31:46 2020 JM, CB (both remotely)Baking over weekendSat 26 Sep

09:15 Baking started automatic
mode
 temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png 
  10   Sun Sep 13 08:06:25 2020 CB (remotely)Baking over the weekend -2Sun 13 Sep 08:06

Baking reached 93 C yesterday afternoon at
 20201309_0806_ctrl.png20201309_0806_plot.png 
  9   Sat Sep 12 08:38:52 2020 CB (remotely)Baking over the weekendSaturday 12 Sep 08:43

Remotely checked status of baking. See attached.
 20200912_0839_ctrl.png20200912_0839_plot.png 
  12   Tue Sep 15 08:39:26 2020 CB (remotely), JMBaking and Chamber status Tuesday 15 September

08:40
 20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png 
  71   Sun Sep 19 09:11:34 2021 CB (remotely)Baking RasPi statusAccessed Pi remotely 

( 1. Without the Internet, the Pi has no
  
  88   Mon Sep 27 17:53:35 2021 JM RSS Baking Jacket upgrade + NEG controllers connectedAdditional baking jacket sections for the
turbo section arrived today. Baking was halted
at ~11:00 to allow for the chamber to cool
 20210927_151650.jpg20210927_151706.jpg20210927_151721.jpg20210927_170139.jpg 